|
|
|
(State or other jurisdiction of incorporation)
|
(Commission File Number)
|
(IRS Employer Identification No.)
|
|
|
(U.S. corporate headquarters)
|
(Zip Code)
|
1830 – 1188 West Georgia Street
Vancouver, British Columbia, Canada |
V6E 4A2
|
(Canadian corporate headquarters)
|
(Zip Code)
|
|
Written communications pursuant to Rule 425 under the Securities Act (17 CFR 230.425)
|
Soliciting material pursuant to Rule 14a-12 under the Exchange Act (17 CFR 240.14a-12)
|
|
Pre-commencement communications pursuant to Rule 14d-2(b) under the Exchange Act (17 CFR 240.14d-2(b))
|
|
Pre-commencement communications pursuant to Rule 13e-4(c) under the Exchange Act (17 CFR 240.13e-4(c))
|
Title of each class
|
Trading Symbol (s)
|
Name of each exchange on which registered
|
|
|
|
●
|
Exploration drilling extends potential of East Zone deposit: UEC commenced a drill program at Roughrider in November 2023 with the dual purpose of exploring for additional resources on the property and for collecting metallurgical samples in the existing resource areas to support future economic studies.
|
●
|
Discovery of new high-grade vein hosted mineralization in hole RR-889 grading 6.29% eU3O8 over 2.9 metres (“m”) ~25 m west of the East Zone deposit (“East Zone”): The mineralization is consistent with the grades and thicknesses of the East Zone and provides targets for resource expansion.
|
●
|
Metallurgical drill program at Roughrider completed: UEC has completed four metallurgical holes that intersected grades and thicknesses of uranium mineralization consistent with the resource models of the three zones, the best result being hole RR-879, drilled through the East Zone, which graded 3.16% eU3O8 over 43.4 m with sub-intervals grading 4.05% eU3O8 over 12.6 m and 3.81% eU3O8 over 21.6 m (Table 1).
|
●
|
Roughrider next steps: UEC plans to drill an additional 20 holes comprising about 9,000 m this winter to identify new areas of uranium mineralization. The current resource estimate includes 27.8 million lb U3O8 comprising 389,000 tonnes grading 3.25% U3O8 in the Indicated category and 36.0 million lb U3O8 comprising 359,000 tonnes grading 4.55% U3O8 in the Inferred category1.
|
Drill Hole
|
From
(m)
|
To
(m)
|
Width
(m)
|
Grade
(%eU3O8)
|
Cut-off
(%eU3O8)
|
GT
(m*%)
|
|
|
225.3
|
245.7
|
20.4
|
0.77
|
0.05
|
15.7
|
|
incl.
|
234.2
|
243.2
|
9.0
|
1.56
|
1.00
|
14.1
|
|
RR-875 |
328.2
|
401.9
|
73.7
|
1.50
|
0.05
|
110.3
|
|
incl.
|
366.8
|
368.6
|
1.8
|
6.89
|
1.00
|
12.4
|
|
incl.
|
387.6
|
388.3
|
0.7
|
38.37
|
10.00
|
26.9
|
|
incl.
|
394.7
|
398.5
|
3.8
|
5.52
|
1.00
|
21.0
|
|
|
263.2
|
306.6
|
43.4
|
3.16
|
0.05
|
137.01
|
|
RR-879 |
incl.
|
267.3
|
279.9
|
12.6
|
4.05
|
1.00
|
51.07
|
incl.
|
284.8
|
306.3
|
21.6
|
3.81
|
1.00
|
82.28
|
|
incl.
|
296.5
|
297.8
|
1.3
|
13.95
|
10.00
|
18.13
|
|
|
276.3
|
292.4
|
16.1
|
0.61
|
0.05
|
9.80
|
|
incl.
|
287.2
|
288.9
|
1.7
|
4.38
|
1.00
|
7.44
|
|
RR-883 |
304.8
|
339.7
|
34.9
|
0.78
|
0.05
|
27.13
|
|
incl.
|
330.2
|
335.2
|
4.9
|
4.46
|
1.00
|
21.84
|
|
342.9
|
358.8
|
15.9
|
0.53
|
0.05
|
8.44
|
||
incl.
|
354.4
|
358.1
|
3.7
|
1.57
|
1.00
|
5.81
|
|
|
455.4
|
469.5
|
14.1
|
0.18
|
0.05
|
2.50
|
|
RR-885A |
incl.
|
455.7
|
456.2
|
0.5
|
2.08
|
1.00
|
1.04
|
incl.
|
468.6
|
469.1
|
0.5
|
1.90
|
1.00
|
0.95
|
|
|
274.5
|
362.3
|
87.8
|
0.60
|
0.05
|
53.1
|
|
incl.
|
295.7
|
296.9
|
1.2
|
6.24
|
1.00
|
7.5
|
|
RR-886B |
incl.
|
296.1
|
296.4
|
0.3
|
11.00
|
10.00
|
3.3
|
incl.
|
298.1
|
300.1
|
2.0
|
5.53
|
1.00
|
11.1
|
|
incl.
|
328.5
|
338.5
|
10.0
|
2.39
|
1.00
|
23.9
|
|
RR-889
|
225.1
|
275.7
|
50.6
|
0.37
|
0.05
|
18.50
|
|
incl.
|
272.8
|
275.7
|
2.9
|
6.28
|
0.10
|
18.21
|
1.
|
Z“Technical Report Summary: Roughrider Uranium Project, Saskatchewan, Canada” prepared by SRK Consulting (UK) Ltd., effective date January 1, 2023 (https://www.sec.gov/Archives/edgar/data/1334933/000143774923011966/ex_510257.htm).
|
Exhibit
|
Description
|
|
99.1
|
||
104
|
Cover Page Interactive Data File (the cover page XBRL tags are embedded within the inline XBRL document).
|
URANIUM ENERGY CORP.
|
|||
DATE: January 31, 2024.
|
By:
|
/s/ Pat Obara
|
|
Pat Obara, Secretary and
|
|||
Chief Financial Officer
|