UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
FORM
(Mark One)
QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 |
For the quarterly period ended
TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 |
For the transition period from ______ to ______
Commission File Number:
(Exact Name of Registrant as Specified in its charter)
(State or other jurisdiction of incorporation or organization) | (I.R.S. Employer Identification No.) |
(Address of Principal Executive Offices) (Zip Code)
(
(Registrant’s telephone number including area code)
Securities registered pursuant to Section 12(b) of the Act:
a | ||
Title of each class | Trading Symbol | Name of each exchange where registered |
Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.
Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit such files).
Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, a smaller reporting company, or an emerging growth company. See definitions of “large accelerated filer”, “accelerated filer”, “smaller reporting company”, and “emerging growth company” in Rule 12b-2 of the Exchange Act.
Large accelerated filer | ◻ | ☒ | |
Non-accelerated filer | ◻ | Smaller reporting company | |
Emerging growth company |
If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act◻
Indicate by check mark whether registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act). Yes
Indicate the number of shares outstanding of each of the issuer’s classes of common stock, as of the latest practicable date:
GOLD RESOURCE CORPORATION
FORM 10-Q
Table of Contents
Page | |||
2 | |||
3 | |||
Condensed Consolidated Interim Financial Statements and Notes | 3 | ||
3 | |||
4 | |||
5 | |||
7 | |||
8 | |||
Management’s Discussion and Analysis of Financial Condition and Results of Operations | 25 | ||
50 | |||
51 | |||
51 | |||
51 | |||
52 | |||
52 | |||
52 | |||
52 | |||
52 | |||
52 | |||
53 |
Processing Plant at Night |
Gold Resource Corporation
1
THIRD QUARTER 2023 HIGHLIGHTS
Highlights for the three months ended September 30, 2023 are summarized below and discussed further under Item 2—Management’s Discussion and Analysis of Financial Condition and Results of Operations:
Don David Gold Mine
● | There were no lost time incidents during the quarter. The year-to-date Lost Time Injury Frequency Rate (“LTIFR”) safety record is 0.11, which is significantly lower than the Mexican average of 0.89 (in US equivalent). Safety at Gold Resource Corporation is paramount. Even with a good track record at the Don David Gold Mine (“DDGM”), the Company continues to strive each quarter for improved measures, awareness, and training. |
● | In the third quarter of 2023, the Don David Gold Mine produced and sold a total of 6,532 gold equivalent (“AuEq”) ounces, comprised of 3,982 gold ounces and 208,905 silver ounces at an average sales price per ounce of $1,934 and $24, respectively. |
● | The DDGM diamond drilling program continued as planned during the third quarter, using five drill rigs with encouraging results. Drilling continued to advance on two fronts: (1) Infill drilling designed to upgrade Inferred resources to the Indicated category; and (2) Expansion drilling with the objective of identifying additional Inferred resources via step-out drilling. The drilling during the third quarter was successful in testing the northern extensions of the Splay 31 and Marena North veins of the Arista system, as well as in expanding the Three Sisters and Gloria vein systems to the northwest and down-dip (Switchback system). |
Back Forty Project
● | Optimization work related to the metallurgy and the economic model for the Back Forty Project in Michigan, USA was completed, and the Company released the Technical Report Summary for the Back Forty Project as Exhibit 96.1 to Form 8-K filed on October 26, 2023. Results of the work indicate a more robust economic project with no planned impacts to wetlands that is more protective of the environment, which should facilitate a successful mine permitting process. |
Financial
● | The Company has $6.7 million in cash as of September 30, 2023, and zero debt. |
● | Net loss was $7.3 million or $0.08 per share for the quarter, which was after a significant push on exploration development and underground drilling. |
● | Working capital was $13.8 million as of September 30, 2023. |
● | Total cash cost after co-product credits for the quarter was $1,839 per gold equivalent (“AuEq”) ounce and total all-in sustaining cost (“AISC”) after co-product credits for the quarter was $2,669 per AuEq ounce. The year-to-date total cash cost after co-product credits was $1,210, and the total AISC after co-product credits was $1,852. (See Item 2—Management’s Discussion and Analysis of Financial Condition and Results of Operations – Non-GAAP Measures below for a reconciliation of non-GAAP measures to applicable GAAP measures). |
Gold Resource Corporation
2
PART I - FINANCIAL INFORMATION
ITEM 1. Financial Statements
GOLD RESOURCE CORPORATION
CONDENSED CONSOLIDATED INTERIM BALANCE SHEETS
(U.S. dollars in thousands, except share and per share amounts)
(Unaudited)
As of | As of | |||||
September 30, | December 31, | |||||
Note | 2023 |
| 2022 | |||
ASSETS | ||||||
Current assets: | ||||||
Cash and cash equivalents | $ | | $ | | ||
Accounts receivable, net | | | ||||
Inventories, net | 4 | | | |||
Prepaid expenses and other current assets | 6 | | | |||
Total current assets | | | ||||
Property, plant, and mine development, net | 7 | | ||||
Deferred tax assets, net | 5 | | | |||
Other non-current assets | 8 | | | |||
Total assets | $ | | $ | |||
LIABILITIES AND SHAREHOLDERS' EQUITY | ||||||
Current liabilities: | ||||||
Accounts payable | $ | | $ | | ||
Mining royalty taxes payable, net | | | ||||
Contingent consideration | 12 | | | |||
Accrued expenses and other current liabilities | 9 | | | |||
Total current liabilities | | | ||||
Reclamation and remediation liabilities | 11 | | | |||
Gold and silver stream agreements liability | 10 | | | |||
Deferred tax liabilities, net | 5 | | | |||
Contingent consideration | 12 | | | |||
Other non-current liabilities | 9 | | | |||
Total liabilities | | | ||||
Shareholders' equity: | ||||||
Common stock - $ | ||||||
| | |||||
Additional paid-in capital | | | ||||
(Accumulated deficit) retained earnings | ( | | ||||
Treasury stock at cost, | ( | ( | ||||
Accumulated other comprehensive loss | ( | ( | ||||
Total shareholders' equity | | | ||||
Total liabilities and shareholders' equity | $ | | $ | |
The accompanying notes are an integral part of these Condensed Consolidated Interim Financial Statements.
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
3
GOLD RESOURCE CORPORATION
CONDENSED CONSOLIDATED INTERIM STATEMENTS OF OPERATIONS
(U.S. dollars in thousands, except share and per share amounts)
(Unaudited)
For the three months ended | For the nine months ended | |||||||||||
September 30, | September 30, | |||||||||||
Note | 2023 |
| 2022 |
| 2023 |
| 2022 | |||||
Sales, net | 3 | $ | | $ | | $ | | $ | | |||
Cost of sales: | ||||||||||||
Production costs | | | | | ||||||||
Depreciation and amortization | | | | | ||||||||
Reclamation and remediation | | | | | ||||||||
Total cost of sales | | | | | ||||||||
Mine gross (loss) profit | ( | ( | ( | | ||||||||
Costs and expenses: | ||||||||||||
General and administrative expenses | | | | | ||||||||
Mexico exploration expenses | | | | | ||||||||
Michigan Back Forty Project expenses | | | | | ||||||||
Stock-based compensation | 16 | ( | | | | |||||||
Realized and unrealized (gain) loss on zinc zero cost collar | 17 | - | ( | - | | |||||||
Other expense, net | 18 | | | | | |||||||
Total costs and expenses | | | | | ||||||||
(Loss) income before income taxes | ( | ( | ( | | ||||||||
(Benefit) provision for income taxes | 5 | ( | ( | ( | | |||||||
Net loss | $ | ( | $ | ( | $ | ( | $ | ( | ||||
Net loss per common share: | ||||||||||||
Basic and diluted net loss per common share | 19 | ( | ( | ( | ( | |||||||
Weighted average shares outstanding: | ||||||||||||
Basic and diluted | 19 | | | | |
The accompanying notes are an integral part of these Condensed Consolidated Interim Financial Statements.
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
4
GOLD RESOURCE CORPORATION
CONDENSED CONSOLIDATED INTERIM STATEMENTS OF CHANGES IN SHAREHOLDERS’ EQUITY
(U.S. dollars in thousands, except share amounts)
(Unaudited)
For the three months ended September 30, 2023 and 2022 | ||||||||||||||||||||
| Number of |
| Par Value of |
| Additional Paid- |
| Retained Earnings (accumulated deficit) |
| Treasury |
| Accumulated |
| Total | |||||||
Balance, June 30, 2022 | | $ | | $ | | $ | | $ | ( | $ | ( | $ | | |||||||
Stock-based compensation | - | - | | - | - | - | | |||||||||||||
Common stock issued for vested restricted stock units | | - | - | - | - | - | - | |||||||||||||
Dividends declared (1) | - | - | - | ( | - | - | ( | |||||||||||||
Unclaimed shares related to the Aquila acquisition | ( | - | ( | - | - | - | ( | |||||||||||||
Net loss | - | - | - | ( | - | - | ( | |||||||||||||
Balance, September 30, 2022 | | $ | | $ | | $ | | $ | ( | $ | ( | $ | | |||||||
Balance, June 30, 2023 | | $ | | $ | | $ | | $ | ( | $ | ( | $ | | |||||||
Stock-based compensation | - | - | | - | - | - | | |||||||||||||
Common stock issued for vested restricted stock units | | - | - | - | - | - | - | |||||||||||||
Issuance of stock, net of issuance costs (2) | | - | | - | - | - | | |||||||||||||
Surrender of stock for taxes due on vesting | ( | - | ( | - | - | - | ( | |||||||||||||
Net loss | - | - | - | ( | - | - | ( | |||||||||||||
Balance, September 30, 2023 | | $ | | $ | | $ | ( | $ | ( | $ | ( | $ | |
(1) | Cash dividends declared and per share was $ |
(2) | An aggregate of |
The accompanying notes are an integral part of these Condensed Consolidated Interim Financial Statements
GOLD RESOURCE CORPORATION
CONDENSED CONSOLIDATED INTERIM STATEMENTS OF CHANGES IN SHAREHOLDERS’ EQUITY
(U.S. dollars in thousands, except share amounts)
(Unaudited)
For the nine months ended September 30, 2023 and 2022 | ||||||||||||||||||||
| Number of |
| Par Value of |
| Additional Paid- |
| Retained Earnings (accumulated deficit) |
| Treasury |
| Accumulated |
| Total | |||||||
Balance, December 31, 2021 | | $ | | $ | | $ | | $ | ( | $ | ( | $ | | |||||||
Stock-based compensation | - | - | | - | - | - | | |||||||||||||
Net stock options exercised | - | - | ( | - | - | - | ( | |||||||||||||
Common stock issued for vested restricted stock units | | - | - | - | - | - | - | |||||||||||||
Dividends declared (1) | - | - | - | ( | - | - | ( | |||||||||||||
Unclaimed shares related to the Aquila acquisition | ( | - | ( | - | - | - | ( | |||||||||||||
Surrender of stock for taxes due on vesting | ( | - | ( | - | - | - | ( | |||||||||||||
Net loss | - | - | - | ( | - | - | ( | |||||||||||||
Balance, September 30, 2022 | | $ | | $ | | $ | | $ | ( | $ | ( | $ | | |||||||
Balance, December 31, 2022 | | $ | | $ | | $ | | $ | ( | $ | ( | $ | | |||||||
Stock-based compensation | - | - | | - | - | - | | |||||||||||||
Common stock issued for vested restricted stock units | | - | - | - | - | - | - | |||||||||||||
Issuance of stock, net of issuance costs (2) | | - | | - | - | - | | |||||||||||||
Surrender of stock for taxes due on vesting | ( | - | ( | - | - | - | ( | |||||||||||||
Net loss | - | - | - | ( | - | - | ( | |||||||||||||
Balance, September 30, 2023 | | $ | | $ | | $ | ( | $ | ( | $ | ( | $ | |
(1) |
(2) |
The accompanying notes are an integral part of these Condensed Consolidated Interim Financial Statements.
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
6
GOLD RESOURCE CORPORATION
CONDENSED CONSOLIDATED INTERIM STATEMENTS OF CASH FLOWS
(U.S. dollars in thousands)
(Unaudited)
For the nine months ended September 30, | ||||||
Note | 2023 |
| 2022 | |||
Cash flows from operating activities: | ||||||
Net loss | $ | ( | $ | ( | ||
Adjustments to reconcile net loss to net cash (used in) provided by operating activities: | ||||||
Deferred income tax benefit | ( | ( | ||||
Depreciation and amortization, including accretion in reclamation | | | ||||
Stock-based compensation | | | ||||
Other operating adjustments | 21 | | ( | |||
Changes in operating assets and liabilities: | ||||||
Accounts receivable | | | ||||
Inventories | | ( | ||||
Prepaid expenses and other current assets | | ( | ||||
Accounts payable and other accrued liabilities | ( | ( | ||||
Mining royalty and income taxes payable, net | ( | ( | ||||
Net cash (used in) provided by operating activities | ( | | ||||
Cash flows from investing activities: | ||||||
Capital expenditures | ( | ( | ||||
Equity investment | - | ( | ||||
Proceeds from the sale of gold and silver rounds | - | | ||||
Net cash used in investing activities | ( | ( | ||||
Cash flows from financing activities: | ||||||
Cash settlement of options exercise | - | ( | ||||
Dividends paid | - | ( | ||||
Proceeds from the ATM sales | | - | ||||
Other financing activities | ( | - | ||||
Net cash provided by (used in) financing activities | | ( | ||||
Effect of exchange rate changes on cash and cash equivalents | ( | ( | ||||
Net decrease in cash and cash equivalents | ( | ( | ||||
Cash and cash equivalents at beginning of period | | | ||||
Cash and cash equivalents at end of period | $ | | $ | | ||
Supplemental Cash Flow Information | ||||||
Income and mining taxes paid | $ | | $ | |||
Non-cash investing or financing activities | ||||||
Balance of capital expenditures in accounts payable | $ | | $ | |
The accompanying notes are an integral part of these Condensed Consolidated Interim Financial Statements.
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
7
GOLD RESOURCE CORPORATION
NOTES TO THE CONDENSED CONSOLIDATED INTERIM FINANCIAL STATEMENTS
September 30, 2023
(Unaudited)
1. Basis of Preparation of Financial Statements
The Condensed Consolidated Interim Financial Statements (“interim financial statements”) of Gold Resource Corporation and its subsidiaries (collectively, the “Company”) are unaudited and have been prepared in accordance with the rules of the Securities and Exchange Commission (“SEC”) for interim statements. Certain information and footnote disclosures required by United States Generally Accepted Accounting Principles (“U.S. GAAP”) have been condensed or omitted as permitted by such rules. However, the Company believes that the disclosures included are adequate to make the information presented not misleading. In the opinion of management, all adjustments (including normal recurring adjustments) and disclosures necessary for a fair presentation of these interim financial statements have been included. The results reported in these interim financial statements do not necessarily indicate the results that may be reported for the entire year. These interim financial statements should be read in conjunction with the audited consolidated financial statements for the year ended December 31, 2022 included in the Company’s annual report on Form 10-K (the “2022 Annual Report”). The year-end balance sheet data was derived from the audited financial statements. Unless otherwise noted, there have been no material changes to the footnotes from those accompanying the audited consolidated financial statements contained in the 2022 Annual Report.
In connection with the preparation of the Company’s financial statements for the period ended September 30, 2023, the Company’s management identified an immaterial error in prior period financial statements, whereby deferred tax liabilities and deferred tax assets attributable to different tax-paying components of the entity or to different tax jurisdictions were incorrectly offset. The Company has corrected the consolidated balance sheets as of December 31, 2022, March 31, 2023, and June 30, 2023, for this immaterial error. The effects of these revisions are as follows:
Revision to the Consolidated Balance Sheet as of December 31, 2022 (unaudited):
As filed as of | Revised as of | |||||||
December 31, | Adjustments | December 31, | ||||||
2022 |
| 2022 | ||||||
ASSETS | ||||||||
Current assets: | ||||||||
Total current assets | $ | | $ | - | $ | | ||
Property, plant, and mine development, net | - | |||||||
Deferred tax assets, net | - | | | |||||
Other non-current assets | | - | | |||||
Total assets | $ | | $ | $ | | |||
LIABILITIES AND SHAREHOLDERS' EQUITY | ||||||||
Current liabilities: | ||||||||
Total current liabilities | $ | | $ | - | $ | | ||
Reclamation and remediation liabilities | | - | | |||||
Gold and silver stream agreements liability | | - | | |||||
Deferred tax liabilities, net | | | | |||||
Contingent consideration | | - | | |||||
Other non-current liabilities | | - | | |||||
Total liabilities | | | | |||||
Shareholders' equity: | ||||||||
Total shareholders' equity | | - | | |||||
Total liabilities and shareholders' equity | $ | | $ | | $ | |
Additionally, the Company revised Note 22 to reflect the impact of the above correction on the Company’s Oaxaca, Mexico segment.
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
8
Revision to the Condensed Consolidated Balance Sheet (unaudited) as of March 31, 2023:
As filed as of | Revised as of | |||||||
March 31, | Adjustments | March 31, | ||||||
2023 |
| 2023 | ||||||
Deferred tax assets, net | $ | - | $ | | $ | | ||
Total assets | $ | | $ | $ | | |||
Deferred tax liabilities, net | $ | | $ | | $ | | ||
Total liabilities | $ | | $ | | $ | | ||
Total liabilities and shareholders' equity | $ | | $ | | $ | |
Revision to the Condensed Consolidated Balance Sheet (unaudited) as of June 30, 2023:
As filed as of | Revised as of | |||||||
June 30, | Adjustments | June 30, | ||||||
2023 |
| 2023 | ||||||
Deferred tax assets, net | $ | - | $ | | $ | | ||
Total assets | $ | | $ | $ | | |||
Deferred tax liabilities, net | $ | | $ | | $ | | ||
Total liabilities | $ | | $ | | $ | | ||
Total liabilities and shareholders' equity | $ | | $ | | $ | |
2. Recently Adopted Accounting Standards
Recent accounting pronouncements issued have been evaluated and do not presently impact our financial statements.
3. Revenue
The Company derives its revenue from the sale of doré and concentrates. The following table presents the Company’s net sales for each period presented, disaggregated by source:
For the three months ended September 30, | For the nine months ended September 30, | |||||||||||
| 2023 |
| 2022 |
| 2023 |
| 2022 | |||||
(in thousands) | (in thousands) | |||||||||||
Doré sales, net | ||||||||||||
Gold | $ | | $ | | $ | | $ | | ||||
Silver | | | | | ||||||||
Less: Refining charges | ( | ( | ( | ( | ||||||||
Total doré sales, net | | | | | ||||||||
Concentrate sales | ||||||||||||
Gold | | | | | ||||||||
Silver | | | | | ||||||||
Copper | | | | | ||||||||
Lead | | | | | ||||||||
Zinc | | | | | ||||||||
Less: Treatment and refining charges | ( | ( | ( | ( | ||||||||
Total concentrate sales, net | | | | | ||||||||
Realized (loss) gain - embedded derivative, net (1) | ( | ( | | | ||||||||
Unrealized gain (loss) - embedded derivative, net | | | ( | ( | ||||||||
Total sales, net | $ | | $ | | $ | | $ | |
(1) | Copper, lead, and zinc are co-products. In the Realized (loss) gain - embedded derivative, net, there is $ |
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
9
respectively, in the Realized (loss) gain - embedded derivative, net, related to the co-products for the three and nine months ended September 30, 2022. |
4. Inventories, net
At September 30, 2023 and December 31, 2022, inventories, net, consisted of the following:
| As of |
| As of | |||
September 30, | December 31, | |||||
2023 | 2022 | |||||
(Unaudited) | ||||||
(in thousands) | ||||||
Stockpiles - underground mine | $ | | $ | | ||
Concentrates | | | ||||
Doré, net | | | ||||
Subtotal - product inventories | | | ||||
Materials and supplies (1) | | | ||||
Total | $ | | $ | |
(1) | Net of reserve for obsolescence of $ |
5. Income Taxes
The Company recorded an income tax benefit of $
Mexico Mining Taxation
Mining entities in Mexico are subject to two mining duties, in addition to the
The Company periodically transfers funds from its Mexican wholly owned subsidiary to the U.S. as dividends, which are subject to a
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
10
If these funds are distributed to the U.S. from Mexico in the future, at that time, they will be subject to the
In October 2023, the Company received a notification from the Mexican Tax Administration Services (“SAT”) with a sanction of
6. Prepaid Expenses and Other Current Assets
At September 30, 2023 and December 31, 2022, prepaid expenses and other current assets consisted of the following:
| As of |
| As of | |||
September 30, | December 31, | |||||
2023 | 2022 | |||||
(in thousands) | ||||||
Advances to suppliers | $ | | $ | | ||
Prepaid insurance | | | ||||
Prepaid income tax | | | ||||
Other current assets | | | ||||
Total | $ | | $ | |
Prepaid income tax
Mexican tax statutes specify that the current year tax prepayments be calculated based on a coefficient for prior year earnings, regardless of current year results. However, starting in the third quarter, these same statutes allow companies to request a reduction of the coefficient, which adjusts for losses experienced in the current year. DDGM applied for this reduction, and when approved, the Company expects that no more tax prepayments will be required this year, and a tax refund of approximately $
Other current assets
A value added (“IVA”) tax in Mexico is assessed on the sales of products and purchases of materials and services. Businesses owe IVA taxes as the business sells a product and collects IVA taxes from its customers. Likewise, businesses are generally entitled to recover the taxes they have paid related to purchases of materials and services, either as a refund or credit to IVA tax payable. Amounts recorded as IVA taxes in the consolidated financial statements represent the net estimated IVA tax payable or receivable, since there is a legal right of offset of IVA taxes. As of September 30, 2023, this resulted in an asset balance of $
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
11
7. Property, Plant, and Mine Development, net
At September 30, 2023 and December 31, 2022, Property, Plant, and Mine Development, net consisted of the following:
| As of |
| As of | |||
September 30, | December 31, | |||||
2023 | 2022 | |||||
(in thousands) | ||||||
Asset retirement costs | $ | | $ | | ||
Construction-in-progress | | | ||||
Furniture and office equipment | | | ||||
Land | | | ||||
Mineral interest | | | ||||
Light vehicles and other mobile equipment | | | ||||
Machinery and equipment | | | ||||
Mill facilities and infrastructure | | | ||||
Mine Development | | | ||||
Software and licenses | | | ||||
Subtotal (1) | | | ||||
Accumulated depreciation and amortization | ( | ( | ||||
Total | $ | | $ | |
(1) |
The Company recorded depreciation and amortization expense of $
8. Other Non-current Assets
At September 30, 2023 and December 31, 2022, other non-current assets consisted of the following:
| As of |
| As of | |||
September 30, | December 31, | |||||
2023 | 2022 | |||||
(in thousands) | ||||||
Investment in Maritime | $ | | $ | | ||
Investment in Green Light Metals | | | ||||
Other non-current assets | | | ||||
Total | $ | | $ | |
Investment in Maritime
On September 22, 2022, the Company invested Canadian Dollar (“C$”)
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
12
Investment in Green Light Metals
A promissory note was acquired in the Aquila Resources Inc. (“Aquila”) acquisition on December 10, 2021. In October 2021, Aquila sold its Wisconsin assets to Green Light Metals in return for a C$
Upon maturity on December 28, 2022, the Company received
9. Accrued Expenses and Other Liabilities
At September 30, 2023 and December 31, 2022, accrued expenses and other liabilities consisted of the following:
| As of |
| As of | |||
September 30, | December 31, | |||||
2023 | 2022 | |||||
(in thousands) | ||||||
Accrued royalty payments | $ | | $ | | ||
Share-based compensation liability - current | | - | ||||
Employee profit sharing obligation | | | ||||
Other payables | | | ||||
Total accrued expenses and other current liabilities | $ | | $ | | ||
Accrued non-current labor obligation | $ | | $ | | ||
Share-based compensation liability | | | ||||
Other long-term liabilities | | | ||||
Total other non-current liabilities | $ | | $ | |
10. Gold and Silver Stream Agreements
The following table presents the Company’s liabilities related to the Gold and Silver Stream Agreements as of September 30, 2023 and December 31, 2022:
| As of |
| As of | |||
September 30, | December 31, | |||||
2023 | 2022 | |||||
(in thousands) | ||||||
Liability related to the Gold Stream Agreement | $ | | $ | | ||
Liability related to the Silver Stream Agreement | | | ||||
Total liability | $ | | $ | |
Periodic interest expense will be incurred based on an implied interest rate. The implied interest rate is determined based on the timing and probability of future production and a
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
13
Gold Streaming Agreement
In November 2017, Aquila entered into a stream agreement with Osisko Bermuda Limited (“OBL”), a wholly owned subsidiary of Osisko Gold Royalties Ltd (TSX & NYSE: OR), pursuant to which OBL agreed to commit approximately $
The $
Per the terms of the gold stream agreement, OBL will purchase
Silver Stream Agreement
Through a series of contracts, Aquila executed a silver stream agreement with OBL to purchase
Per the terms of the silver stream agreement, OBL will purchase
The $
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
14
11. Reclamation and Remediation
The following table presents the changes in reclamation and remediation obligations for the nine months ended September 30, 2023 and the year ended December 31, 2022:
| 2023 |
| 2022 | |||
(in thousands) | ||||||
Reclamation liabilities – balance at beginning of period | $ | | $ | | ||
Foreign currency exchange loss | | | ||||
Reclamation liabilities – balance at end of period | | | ||||
Asset retirement obligation – balance at beginning of period (1) | | | ||||
Changes in estimate (1) | - | | ||||
Liability for Aquila drillhole capping (2) | | - | ||||
Accretion | | | ||||
Foreign currency exchange loss | | | ||||
Asset retirement obligation – balance at end of period | | | ||||
Total period end balance | $ | | $ | |
(1) | In 2022, the Company updated its closure plan study, which resulted in a $ |
(2) | As of December 31, 2022, the Company reported the liability to remediate exploration drill holes at the Back Forty Project in Michigan, USA in other non-current liabilities. As of March 31, 2023, this liability was reclassified to non-current reclamation and remediation liabilities. Upon completion of the optimization work and the related mine closure plan, an asset for asset retirement obligation and corresponding liability for reclamation and remediation will be recorded. |
The Company’s undiscounted reclamation liabilities of $
The Company’s asset retirement obligations reflect the additions to the asset for reclamation and remediation costs in Property, Plant, and Mine Development, post 2013 development stage status, which are discounted using a credit adjusted risk-free rate of
For the Back Forty Project in the third quarter of 2023, the Company capped
12. Commitments and Contingencies
Commitments
As of September 30, 2023 and December 31, 2022, the Company has equipment purchase commitments of approximately $
Contingent Consideration
With the Aquila acquisition, the Company assumed a contingent consideration related to the December 30, 2013, Aquila acquisition of
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
15
smelter return royalty on production from certain land parcels in the project. The issuance of shares and
The contingent consideration is composed of the following in Canadian dollars:
The value of future installments is based on C$
a. | C$ |
b. | C$ |
c. | C$ |
d. | C$ |
The value of the contingent consideration as of September 30, 2023 was $
Other Contingencies
The Company has certain other contingencies resulting from litigation, claims, and other commitments and is subject to various environmental and safety laws and regulations incident to the ordinary course of business. The Company currently has no basis to conclude that any or all of such contingencies will materially affect its financial position, results of operations, or cash flows. However, in the future, there may be changes to these contingencies, or additional contingencies may occur, any of which might result in an accrual or a change in current accruals recorded by the Company. There can be no assurance that the ultimate disposition of contingencies will not have a material adverse effect on the Company’s financial position, results of operations, or cash flows.
With the acquisition of Aquila Resources Inc. on December 10, 2021, the Company assumed substantial liabilities that relate to the gold and silver stream agreements with Osisko Bermuda Limited. Under the agreements, Osisko deposited a total of $
13. Shareholders’ Equity
The Company’s At The Market Offering Agreement with H.C. Wainwright & Co., LLC (the “Agent”), which was entered into in November 2019 (the “ATM Agreement”), pursuant to which the Agent agreed to act as the Company’s sales agent with respect to the offer and sale from time to time of the Company’s common stock having an aggregate gross sales price of up to $
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
16
14. Derivatives
Embedded Derivatives
Concentrate Sales
Concentrate sales contracts contain embedded derivatives due to the provisional pricing terms for unsettled shipments. At the end of each reporting period, the Company records an adjustment to accounts receivable and revenue to reflect the mark-to-market adjustments for outstanding provisional invoices based on forward metal prices. Please see Note—20 Fair Value Measurement in Item 1—Condensed Consolidated Interim Financial Statements and Notes (unaudited) for additional information on the realized and unrealized gain (loss) recorded to adjust accounts receivable and revenue.
The following table summarizes the Company’s unsettled sales contracts at September 30, 2023 with the quantities of metals under contract subject to final pricing expected to occur through December 2023:
Gold | Silver | Copper | Lead | Zinc | Total | |||||||||||||
| (ounces) |
| (ounces) |
| (tonnes) |
| (tonnes) |
| (tonnes) | |||||||||
Under contract | ||||||||||||||||||
Average forward price (per ounce or tonne) | $ | |||||||||||||||||
Unsettled sales contracts value (in thousands) | $ | $ | $ | $ | $ | $ | |
Other Derivatives
Zinc zero cost collar
Derivative instruments that are not designated as hedging instruments are required to be recorded on the balance sheet at fair value. Changes in fair value impact the Company’s earnings through mark-to-market adjustments until the physical commodity is delivered or the financial instrument is settled. The fair value does not reflect the realized or cash value of the instrument. As of December 31, 2022, the Company’s hedge program concluded, but the Company may utilize similar programs in the future to manage near-term exposure to cash flow variability from metal prices.
The Company manages credit risk by selecting counterparties believed to be financially strong, by entering into netting arrangements with counterparties, and by requiring other credit risk mitigants, as appropriate. The Company actively evaluates the creditworthiness of its counterparties, assigns appropriate credit limits, and monitors credit exposures against those assigned limits.
15. Employee Benefits
Effective October 2012, the Company adopted a profit-sharing plan (the “Plan”), which covers all U.S. employees. The Plan meets the requirements of a qualified retirement plan pursuant to the provisions of Section 401(k) of the Internal Revenue Code. The Plan also allows eligible employees to make tax deferred contributions to a retirement trust account up to
Under Mexican law, employees are entitled to receive statutory profit sharing (Participación a los Trabajadores de las Utilidades or “PTU”) payments. The required cash payment to employees in the aggregate is equal to
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
17
16. Stock-Based Compensation
The Company’s compensation program comprises three main elements: base salary, an annual short-term incentive plan (“STIP”) cash award, and long-term equity-based incentive compensation (“LTIP”) in the form of deferred stock units (“DSUs”), restricted stock units (“RSUs”), stock options, and performance share units (“PSUs”).
The Gold Resource Corporation 2016 Equity Incentive Plan (the “Incentive Plan”) allows for the issuance of up to
DSUs of
The Company may also issue DSUs for directors in lieu of board fees at their request. During the three and nine months ended September 30, 2023, respectively,
During the three and nine months ended September 30, 2023,
As of September 30, 2023 and 2022, the non-current liability balances related to DSUs were $
RSUs of
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
18
PSUs of
During the three and nine months ended September 30, 2023, there were
As of September 30, 2023 and 2022, the current liability balances related to PSUs were $
Stock-based compensation expense for the periods presented is as follows:
For the three months ended September 30, | For the nine months ended September 30, | |||||||||||
| 2023 |
| 2022 |
| 2023 |
| 2022 | |||||
(in thousands) | (in thousands) | |||||||||||
Deferred stock units | ( | | ( | | ||||||||
Restricted stock units | | | | | ||||||||
Stock options | $ | | $ | | $ | | $ | | ||||
Performance stock units | ( | | ( | | ||||||||
Total | $ | ( | $ | | $ | | $ | |
The Company’s STIP for its management team provides annual cash payable upon achievement of specified performance metrics. As of September 30, 2023, the Company accrued $
17. Zinc Zero Cost Collar
During the three and nine months ended September 30, 2023 and 2022, the realized and unrealized (gains) losses related to the Company’s zinc zero cost collar are the following:
For the three months ended September 30, | For the nine months ended September 30, | |||||||||||
| 2023 |
| 2022 |
| 2023 |
| 2022 | |||||
(in thousands) | (in thousands) | |||||||||||
Realized (gain) loss on zinc zero cost collar | $ | - | $ | ( | $ | - | $ | | ||||
Unrealized gain on zinc zero cost collar (1) | - | ( | - | ( | ||||||||
Total | $ | - | $ | ( | $ | - | $ | |
(1) | Gains and losses due to changes in fair value are non-cash in nature until such time that they are realized through cash transactions. |
On May 18, 2021, the Company entered into a Trading Agreement with Auramet International LLC that governs nonexchange traded, over-the-counter, spot, forward and option transactions on both a deliverable and non-deliverable basis involving various metals and currencies. Gains and losses due to changes in fair value are non-cash in nature until such time that they are realized through cash transactions. Please see Note 14—Derivatives in Item 1—Condensed Consolidated Interim Financial Statements and Notes (unaudited) for additional information. As of December 31, 2022, the Company’s hedge program concluded, but the Company may utilize similar programs in the future to manage near-term exposure to cash flow variability from metal prices.
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
19
18. Other Expense, net
Other expense, net, for the periods presented consisted of the following:
For the three months ended September 30, | For the nine months ended September 30, | |||||||||||
| 2023 |
| 2022 |
| 2023 |
| 2022 | |||||
(in thousands) | (in thousands) | |||||||||||
Unrealized currency exchange (gain) loss (1) | $ | | $ | | $ | | $ | | ||||
Realized currency exchange loss | ( | ( | | | ||||||||
Realized and unrealized loss (gain) from gold and silver rounds, net | | | ( | ( | ||||||||
Loss on disposal of fixed assets | - | - | | - | ||||||||
Interest on streaming liabilities (2) | | | | | ||||||||
Severance (3) | | - | | - | ||||||||
Other expense (income) | | ( | | ( | ||||||||
Total | $ | | $ | | $ | | $ | |
(1) | Gains and losses due to changes in fair value are non-cash in nature until such time that they are realized through cash transactions. For additional information regarding the Company’s fair value measurements and investments, please see Note 20—Fair Value Measurement in Item 1—Condensed Consolidated Interim Financial Statements and Notes (unaudited) for additional information. |
(2) | Interest expense increased in the third quarter of 2023 due to updating the streaming models based on the Technical Report Summary (S-K 1300) filed for the Back Forty Project in October 2023. |
(3) | This is due to an organized reduction of workforce and leadership change at DDGM in Mexico. |
19. Net Loss per Common Share
Basic net income per common share is calculated based on the weighted average number of common shares outstanding for the period. Diluted earnings per common share are calculated based on the assumption that stock options and other dilutive securities outstanding, which have an exercise price less than the average market price of the Company’s common shares during the period, would have been exercised on the later of the beginning of the period or the date granted and that the funds obtained from the exercise were used to purchase common shares at the average market price during the period. All of the Company’s RSUs are considered to be dilutive in periods with net income.
The effect of the Company’s dilutive securities is calculated using the treasury stock method, and only those instruments that result in a reduction in net income per common share are included in the calculation. Options to purchase
Basic and diluted net income per common share is calculated as follows:
For the three months ended | For the nine months ended | |||||||||||
September 30, | September 30, | |||||||||||
| 2023 |
| 2022 | 2023 |
| 2022 | ||||||
Numerator: | ||||||||||||
Net loss (in thousands) | $ | ( | $ | ( | $ | ( | $ | ( | ||||
Denominator: | ||||||||||||
Basic weighted average shares of common stock outstanding | | | | | ||||||||
Dilutive effect of share-based awards | - | - | - | - | ||||||||
Diluted weighted average common shares outstanding | | | | | ||||||||
Basic and diluted net loss per common share | ( | ( | ( | ( |
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
20
20. Fair Value Measurement
Fair value accounting establishes a fair value hierarchy that prioritizes the inputs to valuation techniques used to measure fair value. The hierarchy gives the highest priority to unadjusted quoted prices in active markets for identical assets or liabilities (Level 1 measurements) and the lowest priority to unobservable inputs (Level 3 measurements). The three levels of the fair value hierarchy are described below:
Level 1 | Unadjusted quoted prices in active markets that are accessible at the measurement date for identical, unrestricted assets or liabilities; |
Level 2 | Quoted prices in markets that are not active or inputs that are observable, either directly or indirectly, for substantially the full term of the asset or liability; and |
Level 3 | Prices or valuation techniques that require inputs that are both significant to the fair value measurement and unobservable (supported by little or no market activity). |
As required by accounting guidance, assets and liabilities are classified in their entirety based on the lowest level of input that is significant to the fair value measurement. These assets and liabilities are remeasured for each reporting period. The following tables set forth certain of the Company’s assets and liabilities measured at fair value by level within the fair value hierarchy as of September 30, 2023 and December 31, 2022:
| As of | As of |
| |||||
September 30, | December 31, | Input Hierarchy Level | ||||||
2023 |
| 2022 | ||||||
(in thousands) | ||||||||
Cash and cash equivalents | $ | | $ | | Level 1 | |||
Accounts receivable, net | $ | | $ | | Level 2 | |||
Investment in equity securities-Maritime | $ | | $ | | Level 1 | |||
Investment in equity securities-Green Light Metals | $ | | $ | | Level 3 |
The following methods and assumptions were used to estimate the fair value of each class of financial instrument:
Cash and cash equivalents: Cash and cash equivalents consist primarily of cash deposits and are valued at cost, approximating fair value.
Accounts receivable, net: Accounts receivable, net include amounts due to the Company for deliveries of concentrates and doré sold to customers. Concentrate sales contracts provide for provisional pricing as specified in such contracts. These sales contain an embedded derivative related to the provisional pricing mechanism which is bifurcated and accounted for as a derivative. At the end of each reporting period, the Company records an adjustment to sales to reflect the mark-to-market of outstanding provisional invoices based on the forward price curve. Because these provisionally priced sales have not yet settled as of the reporting date, the mark-to-market adjustment related to these invoices is included in accounts receivable as of each reporting date.
At September 30, 2023 and December 31, 2022, the Company had an unrealized gain of $
Investment in equity securities—Maritime: On September 22, 2022, Gold Resource Corporation invested C$
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
21
Investment in equity securities—Green Light Metals: Upon maturity on December 28, 2022, the Company received
Gains and losses related to changes in the fair value of these financial instruments were included in the Company’s Condensed Consolidated Interim Statements of Operations, as shown in the following table:
For the three months ended September 30, | For the nine months ended September 30, | Statements of Operations Classification | |||||||||||||
| 2023 |
| 2022 |
| 2023 |
| 2022 |
| |||||||
Note | (in thousands) | ||||||||||||||
Realized and unrealized derivative gain (loss), net | 14 | $ | | $ | ( | $ | ( | $ | ( | Sales, net | |||||
Realized gain (loss) on zinc zero cost collar | 17 | $ | - | $ | | $ | - | $ | ( | Realized and unrealized (gain) loss on zinc zero cost collar | |||||
Unrealized gain on zinc zero cost collar | 17 | $ | - | $ | | $ | - | $ | | Realized and unrealized (gain) loss on zinc zero cost collar |
Realized/Unrealized Derivatives
The following tables summarize the Company’s realized/unrealized derivatives for the periods presented (in thousands):
| Gold |
| Silver |
| Copper |
| Lead |
| Zinc |
| Total | |||||||
For the three months ended September 30, 2023 | ||||||||||||||||||
Realized gain (loss) | $ | | $ | | $ | ( | $ | | $ | ( | $ | ( | ||||||
Unrealized (loss) gain | ( | ( | | ( | | | ||||||||||||
Total realized/unrealized derivatives, net | $ | ( | $ | ( | $ | - | $ | ( | $ | | $ | |
| Gold | Silver | Copper | Lead | Zinc | Total | ||||||||||||
For the three months ended September 30, 2022 | ||||||||||||||||||
Realized loss | $ | ( | $ | ( | $ | ( | $ | ( | $ | ( | $ | ( | ||||||
Unrealized (loss) gain | ( | ( | | | | | ||||||||||||
Total realized/unrealized derivatives, net | $ | ( | $ | ( | $ | ( | $ | | $ | ( | $ | ( |
| Gold |
| Silver |
| Copper |
| Lead |
| Zinc |
| Total | |||||||
For the nine months ended September 30, 2023 | ||||||||||||||||||
Realized gain (loss) | $ | | | | | ( | $ | | ||||||||||
Unrealized (loss) gain | ( | ( | ( | ( | | ( | ||||||||||||
Total realized/unrealized derivatives, net | $ | | $ | | $ | ( | $ | | $ | ( | $ | ( |
| Gold |
| Silver |
| Copper |
| Lead |
| Zinc |
| Total | |||||||
For the nine months ended September 30, 2022 | ||||||||||||||||||
Realized (loss) gain | $ | ( | $ | | $ | ( | $ | ( | $ | | $ | | ||||||
Unrealized (loss) gain | ( | $ | | $ | | $ | ( | $ | ( | ( | ||||||||
Total realized/unrealized derivatives, net | $ | ( | $ | | $ | ( | $ | ( | $ | ( | $ | ( |
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
22
21. Supplementary Cash Flow Information
Other operating adjustments and write-downs within the net cash provided by operations on the Condensed Consolidated Statements of Cash Flows for the nine months ended September 30, 2023 and 2022 consisted of the following:
| For the nine months ended September 30, | |||||
2023 |
| 2022 | ||||
(in thousands) | ||||||
Unrealized gain on gold and silver rounds | $ | ( | $ | ( | ||
Unrealized foreign currency exchange loss | | | ||||
Unrealized gain on zinc zero cost collar | - | ( | ||||
Other | | ( | ||||
Total other operating adjustments | $ | | $ | ( |
22. Segment Reporting
As of September 30, 2023, the Company has organized its operations into
The following table shows selected information from the Condensed Consolidated Interim Balance Sheets relating to the Company’s segments (in thousands):
| Oaxaca, |
| Michigan, |
| Corporate |
| Consolidated | |||||
As of September 30, 2023 | ||||||||||||
Total current assets | $ | | $ | | $ | | $ | | ||||
Total non-current assets | | | | | ||||||||
Total assets | $ | | $ | | $ | | $ | | ||||
Total current liabilities | $ | | | | $ | | ||||||
Total non-current liabilities | | | | | ||||||||
Total shareholders' equity | | | | | ||||||||
Total liabilities and shareholders' equity | $ | | $ | | $ | | $ | | ||||
As of December 31, 2022 | ||||||||||||
Total current assets | $ | | $ | | $ | | $ | | ||||
Total non-current assets | | | | | ||||||||
Total assets | $ | | $ | | $ | | $ | | ||||
Total current liabilities | $ | | $ | | $ | | $ | | ||||
Total non-current liabilities | | | | | ||||||||
Total shareholders' equity | | | | | ||||||||
Total liabilities and shareholders' equity | $ | | $ | | $ | | $ | |
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
23
The following table shows selected information from the Condensed Consolidated Interim Statements of Operations relating to the Company’s segments (in thousands):
| Oaxaca, |
| Michigan, |
| Corporate |
| Consolidated | |||||
For the nine months ended September 30, 2023 | ||||||||||||
Sales, net | $ | | $ | - | $ | - | $ | | ||||
Total mine cost of sales, including depreciation | | | | | ||||||||
Exploration expense | | | - | | ||||||||
Total other costs and expenses, including G&A | | | | | ||||||||
Income taxes benefit | ( | ( | ( | ( | ||||||||
Net loss | $ | ( | $ | ( | $ | ( | $ | ( | ||||
For the nine months ended September 30, 2022 | ||||||||||||
Sales, net | $ | | $ | - | $ | - | $ | | ||||
Total mine cost of sales, including depreciation | | | | | ||||||||
Exploration expense | | | - | | ||||||||
Total other costs and expenses, including G&A | | | | | ||||||||
Provision for income taxes | | - | | | ||||||||
Net income (loss) | $ | | $ | ( | $ | ( | $ | ( |
| Oaxaca, |
| Michigan, |
| Corporate |
| Consolidated | |||||
For the three months ended September 30, 2023 | ||||||||||||
Sales, net | $ | | $ | - | $ | - | $ | | ||||
Total mine cost of sales, including depreciation | | | | | ||||||||
Exploration expense | | | - | | ||||||||
Total other costs and expenses, including G&A | | | | | ||||||||
Income taxes benefit | ( | ( | ( | ( | ||||||||
Net loss | $ | ( | $ | ( | $ | ( | $ | ( | ||||
For the three months ended September 30, 2022 | ||||||||||||
Sales, net | $ | | $ | - | $ | - | $ | | ||||
Total mine cost of sales, including depreciation | | | | | ||||||||
Exploration expense | | | - | | ||||||||
Total other costs and expenses, including G&A | ( | | | | ||||||||
(Benefit) provision for income taxes | ( | - | | ( | ||||||||
Net loss | $ | ( | $ | ( | $ | ( | $ | ( |
.
23. Subsequent Events
Subsequent to the current quarter end, in October 2023, the Company received a notification from the Mexican Tax Administration Services with a sanction of
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
24
ITEM 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations
The following discussion summarizes the results of operations of Gold Resource Corporation and its subsidiaries (“we,” “our,” “us,” or the “Company”) for the three and nine months ended September 30, 2023 and compares those results with the three and nine months ended September 30, 2022. It also analyzes the Company’s financial condition as of September 30, 2023, and compares it to the financial condition as of December 31, 2022. This discussion should be read in conjunction with management’s discussion and analysis and the audited consolidated financial statements and footnotes contained in the 2022 Annual Report.
The discussion also presents certain non-GAAP financial measures that are important to management in its evaluation of our operating results, and which are used by management to compare our performance with what we perceive to be peer group mining companies and are relied on as part of management’s decision-making process. Management believes these measures may also be important to investors in evaluating our performance. For a detailed description of each of the non-GAAP financial measures and a reconciliation to GAAP financial measures, please see the discussion below under “Non-GAAP Measures.” Also see Forward-Looking Statements at the end of this Item 2 for important information regarding statements contained herein.
Overview
Gold Resource Corporation is a mining company that pursues gold, silver, and other metal projects that are expected to achieve both low operating costs and high returns on capital. The Don David Gold Mine is our cornerstone asset comprised of six properties. The Company’s focus is to unlock the significant upside potential of this asset through optimization of the current operations, growing the existing resource by investing in exploration drilling, and identifying new opportunities near existing infrastructure. The primary mineral production comes from the Arista underground mine. This mine supplies ore to our processing facilities to produce gold and silver doré and copper, lead, and zinc concentrates that also contain gold and silver.
The Back Forty Project, when developed, is expected to produce gold and silver doré and copper and zinc concentrates bearing gold and silver. Optimization work related to metallurgy and the economic model was completed during the third quarter of 2023 and the Company filed the Back Forty Project Technical Report Summary (S-K 1300) on October 26, 2023. Results of the work indicate a more robust economic project with no planned impacts to wetlands that is more protective of the environment, which should facilitate a successful mine permitting process. The Board continues to evaluate options in order to develop the Back Forty Project.
Review of Strategic Alternatives
Notwithstanding the technical successes noted above, in light of the continued challenges facing the Company, the Company’s Board of Directors has decided to initiate a formal review process, with the assistance of outside financial and legal advisors, to evaluate strategic alternatives for the Company. The comprehensive process will begin immediately and will evaluate a broad range of options to maximize shareholder value, including a potential sale of the Company.
There is no deadline or definitive timetable for completion of the strategic alternatives review process and there can be no assurance regarding the results or outcome of this review. The Company does not intend to comment further on this strategic review process until it has been completed or the Company determines that a disclosure is required by law or otherwise deemed appropriate.
Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations
25
Removing Loose Rock | DDGM has focused on safety, efficiency, and cost-saving initiatives, while emphasizing strong leadership and collaboration. The safety efforts have resulted in zero lost time injuries for the quarter and a significantly lower Lost Time Injury Frequency Rate of 0.11 compared to Cámara Minera de México’s average of 0.89. Leadership training programs have been successfully implemented, empowering leaders to enhance team productivity and safety. Union leaders and contractors have actively participated in safety programs, fostering a cooperative work community. While production maintained tonnage levels similar to the first quarter, a significant portion of the material came from lower levels with a decreased Net Smelter Return. Mining these sections was necessary to integrate transverse long-hole stoping in the fourth quarter, which is expected to impact mining costs positively. To ensure long-term sustainability and profitability, DDGM has implemented cost-saving measures, including a 10% reduction in headcount, minimizing crusher usage during peak hours, improving mining cycle efficiencies, and enhancing drilling and bolting processes. These measures optimize operations without compromising safety or productivity. Lastly, DDGM's persistent commitment to safety, efficiency, leadership development, collaboration with unions and contractors, and cost-saving initiatives positions the company for continued success. The company remains dedicated to delivering value to shareholders, while maintaining responsible and sustainable mining practices. |
2023 DDGM Exploration Update
Our portfolio of properties that make up the Don David Gold Mine are located along a 55-kilometer trend of the San Jose structural corridor in the Sierra Madre Sur mountain range. This northwest trending structural corridor spans three historic mining districts within the state of Oaxaca. Regional surface exploration activity continues on several properties with a goal of defining additional priority drill targets, demonstrating our commitment to long-term investment in Oaxaca, Mexico.
Underground exploration (expansion) and underground infill drilling continued during the third quarter of 2023, where access is available, using five diamond-drill rigs from various locations within the Arista mine. Expansion drilling was conducted to (1) further test the Three Sisters and Gloria vein systems, as well as other newly identified vein targets in the Arista North vein system including the Splay 31 and Marena North veins, and (2) infill drilling in the central-north Switchback deposit and in the Three Sisters and Gloria vein systems to further define and expand Mineral Reserves and Mineral Resources in these areas.
The underground drill program continues to advance our 2023 exploration objectives of identifying new mineralization and defining and upgrading additional mineral resources that were identified during the previous drilling campaign. These recent drill results will be incorporated into a 2023 resource estimate update. Preliminary calculations show a positive increase in tonnage with higher grades in both the Arista and Switchback vein deposits, along with an increase to the inferred resources of the Gloria and Three Sisters vein systems.
Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations
26
During the third quarter of 2023, eight exploration drill holes were completed, for a total of 3,343 meters, while 54 infill drill holes were completed for 9,374 meters. The positive results from the ongoing exploration drilling campaign have validated the additional investment of capital in exploration during 2023 and have further bolstered the area’s potential for future mineral exploration.
Exploration drilling in the third quarter of 2023 continued to target the following zones at the Arista mine:
o | The northwest extension of the Switchback system at depth and along strike, where we have confirmed the continuation of the system, which now extends for over 1,100 meters along a northeast-southwest strike, remaining open in both directions as well as up- and down-dip. |
o | The Three Sisters vein system, in conjunction with the recently discovered Gloria vein system, continued to be drill targeted in the third quarter of 2023. The Three Sisters and Gloria vein systems have now been defined over a strike length of more than 700 meters, with both systems remaining open along a northwest-southeast strike and at depth. |
o | Exploration drilling got underway during the third quarter to test the northwest extension of the Arista vein system, targeting the Splay 31 and Marena North veins in particular. This drilling occurs approximately 100 meters northwest of the historic Arista mine working limits. Vein intercepts drilled during the third quarter show visual mineralized continuity (along strike and at depth) in the projections of the northwest trending Arista veins (i.e., Splay 31, Marena North) northwest of areas previously modeled and outside the current resource shell. The projected intersection of the western terminus of the Gloria vein with the northwest trending Arista vein system is becoming an increasingly exciting future exploration target at DDGM. |
o | In the third quarter of 2023, infill drilling was focused on Levels 27 and 28 in the central and north Switchback vein system. This drilling successfully confirmed the continuity and economic viability of the Susana North, Soledad North, Salamanca, and Sagrario veins along strike to the northwest and down-dip of the current Switchback deposit and outside current resource shells. Additionally, infill drilling began late in the third quarter on the Three Sisters vein system and the Splay 31 vein of the North Arista vein system, with the aim of upgrading inferred resources to the indicated category. Due to their proximity to existing mine infrastructure, these areas will provide efficient and quick access to near-term mine production opportunities. |
Hole No. 523080: Marena North vein (386.91 – 395.09 m; 8.18 m) |
Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations
27
Regional exploration during the third quarter of 2023 continued to focus on evaluating and prioritizing advanced stage projects located along the 55-kilometer trend in the San Jose structural corridor. These projects include Alta Gracia, Margaritas, Chamizo, El Rey, and Jabali, all situated within the 55.1 square kilometers of concession holdings controlled by the Don David Gold Mine. Additionally, other prospects in the vicinity of the Arista mine are being re-evaluated for near-term potential, with the goal of defining additional priority drill targets. A regional geologic map to outline of the DDGM concession holdings with the advanced stage project locations is provided below.
Regional Geologic Map Showing Advanced Stage Exploration Project Locations
Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations
28
Results of Operations
Don David Gold Mine
Mine activities during the third quarter of 2023 included development and ore extraction from the Arista mine.
The following table summarizes certain production statistics about our Don David Gold Mine for the periods indicated:
For the three months ended September 30, | For the nine months ended September 30, | |||||||||||
| 2023 |
| 2022 |
| 2023 |
| 2022 | |||||
Arista Mine | ||||||||||||
Milled | ||||||||||||
Tonnes Milled | 116,626 | 110,682 | 346,857 | 375,367 | ||||||||
Grade | ||||||||||||
Average Gold Grade (g/t) | 1.52 | 1.98 | 1.82 | 2.57 | ||||||||
Average Silver Grade (g/t) | 73 | 80 | 85 | 75 | ||||||||
Average Copper Grade (%) | 0.32 | 0.37 | 0.35 | 0.37 | ||||||||
Average Lead Grade (%) | 1.29 | 1.59 | 1.56 | 1.86 | ||||||||
Average Zinc Grade (%) | 3.24 | 4.21 | 3.61 | 4.38 | ||||||||
Recoveries | ||||||||||||
Average Gold Recovery (%) | 77.9 | 82.9 | 79.7 | 84.3 | ||||||||
Average Silver Recovery (%) | 89.7 | 91.3 | 91.0 | 92.7 | ||||||||
Average Copper Recovery (%) | 74.5 | 72.8 | 77.0 | 75.0 | ||||||||
Average Lead Recovery (%) | 69.5 | 71.0 | 74.1 | 76.3 | ||||||||
Average Zinc Recovery (%) | 85.2 | 83.7 | 84.8 | 83.5 | ||||||||
Combined | ||||||||||||
Tonnes Milled (1) | 116,626 | 110,682 | 347,917 | 376,625 | ||||||||
Tonnes Milled per Day (2) | 1,557 | 1,361 | 1,455 | 1,492 | ||||||||
Metal production (3) | ||||||||||||
Gold (ozs.) | 4,443 | 5,851 | 16,251 | 26,355 | ||||||||
Silver (ozs.) | 247,159 | 261,256 | 859,651 | 842,636 | ||||||||
Copper (tonnes) | 276 | 296 | 946 | 1,030 | ||||||||
Lead (tonnes) | 1,048 | 1,249 | 3,996 | 5,342 | ||||||||
Zinc (tonnes) | 3,223 | 3,901 | 10,629 | 13,745 | ||||||||
Metal produced and sold (3) | ||||||||||||
Gold (ozs.) | 3,982 | 5,478 | 14,777 | 22,605 | ||||||||
Silver (ozs.) | 208,905 | 225,012 | 777,977 | 722,041 | ||||||||
Copper (tonnes) | 245 | 282 | 904 | 976 | ||||||||
Lead (tonnes) | 947 | 1,056 | 3,681 | 4,450 | ||||||||
Zinc (tonnes) | 2,571 | 2,943 | 8,772 | 10,892 | ||||||||
Percentage payable metal (3) | ||||||||||||
Gold (%) | 90 | 94 | 91 | 86 | ||||||||
Silver (%) | 85 | 86 | 90 | 86 | ||||||||
Copper (%) | 89 | 95 | 96 | 95 | ||||||||
Lead (%) | 90 | 85 | 92 | 83 | ||||||||
Zinc (%) | 80 | 75 | 83 | 79 |
(1) | During the first and second quarter of 2022 and during the first quarter of 2023, tonnes milled includes 1,043, 215, and 1,060 purchased tonnes, respectively, related to a collaborative initiative with a local community to ensure the proper environmental treatment and storage of the material. |
(2) | Based on actual days the mill operated during the period. |
(3) | The difference between what we report as "ounces/tonnes produced" and "payable ounces/tonnes sold" is attributable to the difference between the quantities of metals contained in the concentrates we produce versus the portion of those metals actually paid for according to the terms of our sales contracts. Differences can also arise from inventory changes incidental to shipping schedules, or variances in ore grades and recoveries, which impact the amounts of metals contained in concentrates produced and sold. |
Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations
29
Third quarter 2023 compared to third quarter 2022
Production
During the three months ended September 30, 2023, total tonnes milled of 116,626 were 5% higher than in the same period in 2022. Metal production for gold, silver, copper, lead, and zinc decreased by 24%, 5%, 7%, 16%, and 17%, respectively, during the three months ended September 30, 2023 as compared to the same period last year as a result of the lower tonnes processed and lower metal grades as expected and in line with the 2023 mine plan.
Grades & Recoveries
During the three months ended September 30, 2023, all of the ore processed came from the Arista underground mine with an average gold grade of 1.52 g/t and silver grade of 73 g/t, compared to 1.98 g/t and 80 g/t, respectively, for the same period in 2022. In 2023, the average gold and silver grades were 23% and 9% lower, respectively. As shown in the Technical Report Summary for DDGM incorporated by reference in the 2022 Annual Report (the “Technical Report Summary”), grades are expected to decline in 2023 in line with the life of mine average shown in the estimates of mineral reserves (as defined by subpart 1300 of Regulation S-K, “Mineral Reserve”) and mineral resources (as defined by subpart 1300 of Regulation S-K, “Mineral Resource”) tables contained therein (the “Mineral Reserve and Mineral Resource Tables”). As grades decline, recoveries are expected to decline as well. Our base metals average grades during the three months ended September 30, 2023 were 0.32% for copper, 1.29% for lead, and 3.24% for zinc. Copper, lead, and zinc grades were 14%, 19%, and 23% lower, respectively, than in the same period in 2022.
Gold and silver recoveries for the three months ended September 30, 2023 were 77.9% and 89.7%, respectively, reflecting a 6% decrease for gold and a 2% decrease for silver over the same period in 2022. The mineralization in the third quarter of 2023 was different from the same period in 2022, containing high quartz. Quartz has an adverse effect on the floatation. Some of the gold is encapsulated in the quartz and is lost due to the fact it cannot be recovered in the flotation circuit. Copper, lead, and zinc recoveries for the three months ended September 30, 2023 were 74.5%, 69.5%, and 85.2%, respectively. While recoveries for the three months ended September 30, 2023 for both copper and zinc increased by 2%, recoveries for lead decreased by 2% compared to the same period in 2022. As shown in the Technical Report Summary incorporated by reference in the 2022 Annual Report, future recoveries and grades are expected to align with the life of mine average shown in the Mineral Reserve and Mineral Resource Tables.
Year-to-date 2023 compared to year-to-date 2022
Production
During the nine months ended September 30, 2023, total tonnes milled of 346,857 were 8% lower than during the same period in 2022. Metal production for gold, copper, lead, and zinc decreased by 38%, 8%, 25%, and 23%, respectively, during the nine months ended September 30, 2023 as compared to the same period last year, as a result of the lower tonnes processed and lower metal grades as expected and in line with the 2023 mine plan. Metal production for silver increased by 2% during the nine months ended September 30, 2023 as compared to the same period last year due to higher silver grades.
Grades & Recoveries
During the nine months ended September 30, 2023, the majority of ore processed came from the Arista underground mine with an average gold grade of 1.82 g/t and silver grade of 85 g/t, compared to 2.57 g/t and 75 g/t, respectively, for the same period in 2022. The average gold grade was 29% lower, and the average silver grade was 13% higher in 2023. As shown in the Technical Report Summary incorporated by reference in the 2022 Annual Report, grades are expected to decline in 2023 in line with the life of mine average shown in the Mineral Reserve and Mineral Resource Tables. As grades decline, recoveries are expected to decline as well. Our base metals average grades during the nine months ended September 30, 2023 were 0.35% for copper, 1.56% for lead, and 3.61% for zinc. Copper, lead, and zinc grades were 5%, 16%, and 18% lower, respectively, than in the same period in 2022.
Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations
30
Gold and silver recoveries for the nine months ended September 30, 2023 were 79.7% and 91.0%, respectively, reflecting a 5% decrease for gold and a 2% decrease for silver over the same period in 2022. In 2023, we encountered different mineralization, containing zones of high quartz. Quartz has an adverse effect on the floatation. Some of the gold is encapsulated in the quartz and is lost due to the fact it cannot be recovered in the flotation circuit. Copper, lead, and zinc recoveries for the nine months ended September 30, 2023 were 77.0%, 74.1%, and 84.8%, respectively. While recoveries for copper and zinc for the nine months ended September 30, 2023 increased by 3% and 2%, respectively, recoveries for lead decreased by 3% compared to the same period in 2022. As shown in the Technical Report Summary incorporated by reference in the 2022 Annual Report, future recoveries and grades are expected to align with the life of mine average shown in the Mineral Reserve and Mineral Resource Tables.
Sales Statistics
The following table summarizes certain sales statistics about the Don David Gold Mine operations for the periods indicated:
For the three months ended September 30, | For the nine months ended September 30, | |||||||||||
| 2023 |
| 2022 |
| 2023 |
| 2022 | |||||
Net sales | ||||||||||||
Gold | $ | 7,690 | $ | 9,109 | $ | 28,529 | $ | 41,228 | ||||
Silver | 4,919 | 4,312 | 18,202 | 15,620 | ||||||||
Copper | 2,049 | 2,164 | 7,792 | 8,969 | ||||||||
Lead | 2,060 | 2,075 | 7,807 | 9,670 | ||||||||
Zinc | 6,283 | 10,003 | 23,762 | 40,672 | ||||||||
Less: Treatment and refining charges | (2,788) | (2,860) | (9,300) | (8,745) | ||||||||
Realized and unrealized gain (loss) - embedded derivative, net | 339 | (934) | (205) | (1,064) | ||||||||
Total sales, net | $ | 20,552 | $ | 23,869 | $ | 76,587 | $ | 106,350 | ||||
Metal produced and sold | ||||||||||||
Gold (ozs.) | 3,982 | 5,478 | 14,777 | 22,605 | ||||||||
Silver (ozs.) | 208,905 | 225,012 | 777,977 | 722,041 | ||||||||
Copper (tonnes) | 245 | 282 | 904 | 976 | ||||||||
Lead (tonnes) | 947 | 1,056 | 3,681 | 4,450 | ||||||||
Zinc (tonnes) | 2,571 | 2,943 | 8,772 | 10,892 | ||||||||
Average metal prices realized (1) | ||||||||||||
Gold ($ per oz.) | $ | 1,934 | $ | 1,627 | $ | 1,948 | $ | 1,823 | ||||
Silver ($ per oz.) | $ | 23.61 | $ | 18.54 | $ | 23.86 | $ | 21.65 | ||||
Copper ($ per tonne) | $ | 8,185 | $ | 7,115 | $ | 8,624 | $ | 9,015 | ||||
Lead ($ per tonne) | $ | 2,196 | $ | 1,882 | $ | 2,166 | $ | 2,166 | ||||
Zinc ($ per tonne) | $ | 2,195 | $ | 3,186 | $ | 2,648 | $ | 3,828 | ||||
Gold equivalent ounces sold | ||||||||||||
Gold Ounces | 3,982 | 5,478 | 14,777 | 22,605 | ||||||||
Gold Equivalent Ounces from Silver | 2,550 | 2,564 | 9,529 | 8,575 | ||||||||
Total AuEq oz | 6,532 | 8,042 | 24,306 | 31,180 |
(1) | Average metal prices realized vary from the market metal prices due to final settlement adjustments from our provisional invoices when they are settled. Our average metal prices realized will therefore differ from the average market metal prices in most cases. |
Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations
31
Third quarter 2023 compared to third quarter 2022
The key drivers of the production and financial results for the third quarter of 2023, as compared to the third quarter of 2022, relate to the higher tonnes mined and changes in metal grades. These results align with the 2023 mine plan and were considered in the 2023 guidance disclosed in the 2022 Annual Report. Financial results have also been impacted unfavorably by the strengthening Mexican peso and the lower zinc price realized in 2023.
Metal Sold
During the three months ended September 30, 2023, gold sales of 3,982 ounces, silver sales of 208,905 ounces, copper sales of 245 tonnes, lead sales of 947 tonnes, and zinc sales of 2,571 tonnes decreased by 27%, 7%, 13%, 10% and 13% respectively, as compared to the same period in 2022.
Average metal prices realized
During the three months ended September 30, 2023, the average metal prices were $1,934 per ounce for gold, $23.61 per ounce for silver, $8,185 per tonne for copper, $2,196 per tonne for lead, and $2,195 per tonne for zinc. Compared to the same period in 2022, the average metal price for gold, silver, copper, and lead increased by 19%, 27%, 15%, and 17%, respectively, while the average metal price zinc decreased 31%.
Year-to-date 2023 compared to year-to-date 2022
Key drivers in the production and financial results for the nine months ended September 30, 2023, as compared to the same period in 2022, relate to the lower tonnes mined and changes in metal grades. These results align with the 2023 mine plan and were considered in the 2023 guidance disclosed in the 2022 Annual Report. Financial results have also been impacted unfavorably by the strengthening Mexican peso and the lower zinc price realized in 2023.
Metal Sold
During the nine months ended September 30, 2023, gold sales of 14,777 ounces, copper sales of 904 tonnes, lead sales of 3,681 tonnes, and zinc sales of 8,772 tonnes decreased by 35%, 7%, 17%, and 19%, respectively, as compared to the same period in 2022. Silver sales of 777,977 ounces increased by 8% during the nine months ended September 30, 2023 compared to the same period in 2022.
Average metal prices realized
During the nine months ended September 30, 2023, the average metal prices were $1,948 per ounce for gold, $23.86 per ounce for silver, $8,624 per tonne for copper, $2,166 per tonne for lead, and $2,648 per tonne for zinc. Compared to the same period in 2022, the average metal price for gold and silver increased by 7% and 10%, respectively, while the average metal price for copper and zinc decreased by 4% and 31%, respectively. The average price for lead was the same as in the comparable period in 2022.
Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations
32
Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations
33
Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations
34
Financial Measures
The following table summarizes certain financial data of the Company for the periods indicated:
For the three months ended September 30, | For the nine months ended September 30, | |||||||||||
2023 |
| 2022 | 2023 |
| 2022 | |||||||
(in thousands) | (in thousands) | |||||||||||
Doré and concentrate sales | $ | 23,001 | $ | 27,663 | $ | 86,092 | $ | 116,159 | ||||
Less: Treatment and refining charges | (2,788) | (2,860) | (9,300) | (8,745) | ||||||||
Realized/unrealized derivatives, net | 339 | (934) | (205) | (1,064) | ||||||||
Sales, net | 20,552 | 23,869 | 76,587 | 106,350 | ||||||||
Total cost of sales | 24,963 | 26,047 | 79,238 | 81,186 | ||||||||
Mine gross (loss) profit | (4,411) | (2,178) | (2,651) | 25,164 | ||||||||
Other costs and expenses, including tax: | 2,930 | 7,552 | 10,309 | 28,202 | ||||||||
Net loss | $ | (7,341) | $ | (9,730) | $ | (12,960) | $ | (3,038) | ||||
Other Non-GAAP Financial Measures: | ||||||||||||
Total cash cost after co-product credits per AuEq oz sold (1) | $ | 1,839 | $ | 1,103 | $ | 1,210 | $ | 314 | ||||
Total consolidated all-in sustaining cost after co-product credits per AuEq oz sold (1) | $ | 2,669 | $ | 1,838 | $ | 1,852 | $ | 944 | ||||
Total all-in cost after co-product credits per AuEq oz sold (1) | $ | 3,001 | $ | 2,457 | $ | 2,082 | $ | 1,329 |
(1) | For a detailed description of each of the non-GAAP financial measures and a reconciliation to GAAP financial measures, please see the discussion below under “Non-GAAP Measures”. |
Third quarter 2023 compared to third quarter 2022
Sales, net
Net sales of $20.6 million for DDGM for the three months ended September 30, 2023 decreased by $3.3 million, or 14%, compared to the same period in 2022. The decrease in 2023 net sales is the result of decreased sales volumes and lower realized metal prices for zinc, as outlined in the sales statistics table above. Additionally, treatment and refining charges during the three months ended September 30, 2023 decreased by 3% as a result of the decline in third quarter 2023 production as compared to third quarter 2022 production.
Total cost of sales
Total cost of sales of $25.0 million for the three months ended September 30, 2023 decreased by 4% from $26.0 million for the same period in 2022. The $1.0 million decrease was primarily related to a $0.4 million decrease in production cost and a $0.8 million decrease in depreciation expense. Production costs of $19.0 million for the three months ended September 30, 2023 are 2% lower than the production costs of $19.4 million for the same period in 2022. Although the cost of sales and production costs were lower during the third quarter of 2023 compared to the same period in 2023, the cost of sales as a percentage of revenue was 12% higher because the increased power rates and the strengthening of the peso negatively impacted production costs.
Mine gross (loss) profit
For the three months ended September 30, 2023, the Company had a mine gross loss of $4.4 million. Mine gross loss increased by $2.2 million, or 103%, compared to the same period in 2022. The increase in loss was primarily due to a $3.3 million, or 14% decrease in net sales, offset by a $0.4 million, or 2% decrease in production costs and a $0.8 million, or 12% decrease in depreciation and amortization expenses.
The relationship between sales and the cost of sales, and therefore mine gross profit, is not perfectly correlated to the tonnes of ore processed. While both sales and the cost of sales are impacted by the tonnes of ore processed, other factors,
Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations
35
such as the grade of ore processed, metal commodity prices, and operating costs have a significant impact on mine gross profit. For example, in the third quarter of 2023, the tonnes of ore processed increased by 5%, but the total cost of sales only decreased by 4% compared to the third quarter of 2022 due to a 9% lower cost per tonne processed; however, sales decreased by 14%.
We expect grades to vary from period to period based on the annual mine plan. The gold grades are expected to trend downwards over time, toward the average grade of 1.14 g/t (exclusive of silver, copper, lead, and zinc contained grades), reflected in our mineral reserve estimate. However, as mine development progresses and infill drilling occurs, opportunities to refine mining methods and reduce dilution may have a favorable impact on future mined grades.
Net (loss) income
For the three months ended September 30, 2023, we recorded a net loss of $7.3 million, compared to a net loss of $9.7 million during the same period in 2022. The $2.4 million decrease in net loss is mainly attributable to the higher tax benefit in the third quarter of 2023.
Year-to-date 2023 compared to year-to-date 2022
Sales, net
Net sales of $76.6 million for DDGM for the nine months ended September 30, 2023 decreased by $29.8 million, or 28%, compared to the same period in 2022. The decrease in 2023 sales is the result of decreased sales volumes outlined in the sales statistics table above. Additionally, treatment and refining charges during the nine months ended September 30, 2023 increased by 6% due to an increase in the zinc treatment charge benchmark and spot price.
Total cost of sales
Total cost of sales decreased by 2% to $79.2 million for the nine months ended September 30, 2023 from $81.2 million for the same period in 2022. The $2.0 million decrease was primarily related to a $2.1 million decrease in production cost, offset by higher reclamation and remediation expenses. Production costs of $59.1 million for the nine months ended September 30, 2023 are 3% lower than the production costs of $61.2 million for the same period in 2022. The decrease is directly related to an 8% decrease in ore tonnes processed. Although the cost of sales and production costs were lower during the nine months ended September 30, 2023 compared to the same period in 2022, the cost of sales as a percentage of revenue was 27% higher because of the increased power rates and the strengthening of the peso negatively impacted production costs.
Mine gross (loss) profit
For the nine months ended September 30, 2023, mine gross profit decreased $27.8 million, or 111% compared to the same period in 2022, from a mining gross profit of $25.2 million in 2022 to a mining gross loss of $2.7 million in 2023. The decrease was primarily due to a $29.8 million, or 28% decrease in net sales, offset by a $2.1 million, or 3% decrease in production costs.
The relationship between sales and the cost of sales, and therefore mine gross profit, is not perfectly correlated to the tonnes of ore processed. While both sales and the cost of sales are impacted by the tonnes of ore processed, other factors, such as the grade of ore processed, metal commodity prices, and operating costs have a significant impact on mine gross profit. For example, for the nine months ended September 30, 2023, the volume of ore processed decreased by 8%, but the total cost of sales decreased only by 2% compared to the same period in 2022 due to a 6% higher cost per tonne processed; however, sales decreased by 28% due to a decrease in ore tonnes processed and a decrease in grade of ore tonnes processed for gold and base metals. The decrease in sales is explained by the decrease in volumes as well as the decrease in grades for gold and base metals in 2023, and the decrease in operating costs is primarily explained by the decrease in production costs and depreciation.
Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations
36
We expect grades to vary from period to period based on the annual mine plan. The gold grades are expected to trend downwards over time, toward the average grade of 1.14 g/t (exclusive of silver, copper, lead, and zinc contained grades), reflected in our mineral reserve estimate. However, as capital intensive mine development progresses and infill drilling occurs, opportunities to refine mining methods and eliminate dilution may have a favorable impact on future mined grades.
Net (loss) income
For the nine months ended September 30, 2023, we recorded a net loss of $13.0 million, as compared to a net loss of $3.0 million during the same period in 2022. The $10.0 million increase in net loss is mainly attributable to the mine gross loss discussed above.
Other Costs and Expenses, Including Taxes
For the three months ended September 30, | For the nine months ended September 30, | ||||||||||||
2023 |
| 2022 | 2023 |
| 2022 |
| |||||||
(in thousands) | (in thousands) | ||||||||||||
Other costs and expenses: | |||||||||||||
General and administrative expenses | $ | 1,764 | $ | 1,799 | $ | 5,087 | $ | 5,618 | |||||
Mexico exploration expenses | 1,540 | 1,143 | 3,974 | 3,190 | |||||||||
Michigan Back Forty Project expenses | 420 | 3,830 | 1,265 | 6,925 | |||||||||
Stock-based compensation | (102) | 450 | 502 | 1,617 | |||||||||
Realized and unrealized (gain) loss on zinc zero cost collar | - | (218) | - | 120 | |||||||||
Other expense, net | 1,967 | 765 | 4,147 | 1,817 | |||||||||
Total other costs and expenses | 5,589 | 7,769 | 14,975 | 19,287 | |||||||||
(Benefit) provision for income taxes | (2,659) | (217) | (4,666) | 8,915 | |||||||||
Total other costs, including taxes | $ | 2,930 | $ | 7,552 | $ | 10,309 | $ | 28,202 |
Third quarter 2023 compared to third quarter 2022
General and administrative expenses: For both the three months ended September 30, 2023 and 2022, general and administrative expenses were $1.8 million.
DDGM Exploration expenses: For the three months ended September 30, 2023, exploration expenses in DDGM totaled $1.5 million, compared to $1.1 million for the same period in 2022. Exploration activities in Oaxaca, Mexico, increased compared to the same period in 2022 primarily due to increased exploration drilling activity and increased contract drilling rates in 2023.
Back Forty Project expenses: For the three months ended September 30, 2023, costs for the optimization work totaled $0.4 million, compared to $3.8 million for the same period in 2022. The 89% decrease is due to the completion of the optimization work in the third quarter of 2023 and utilizing third parties only on a limited basis until after the completion of the capital cost analysis for the project.
Stock-based compensation: Stock-based compensation decreased by $0.5 million for the three months ended September 30, 2023 compared to the same period in 2022. This decrease is mainly due to the downward mark-to-market adjustment in the liability-classified share-based awards due to a decrease in share price.
Realized and unrealized loss on zinc zero cost collar: As of December 31, 2022, the Company’s hedge program concluded; therefore, no gains or losses were recorded in 2023. For the three months ended September 30, 2022, a $0.2 million gain was recorded related to the zinc zero cost collar, consisting of a realized gain of $0.1 million and an unrealized gain of $0.1 million.
Other expense, net: For the three months ended September 30, 2023, $2.0 million of other expense was recorded compared to $0.8 million in other expense during the same period of 2022. The $1.2 million increase primarily is the result
Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations
37
of the $0.7 million severance expense due to the reduction of workforce and changes in the leadership team at DDGM in Mexico. Please see Note 18 - Other expense, net in Item 1—Condensed Consolidated Interim Financial Statements and Notes (unaudited) for a detailed breakdown.
Provision for income taxes: For the three months ended September 30, 2023, income tax benefit was $2.7 million, compared to $0.2 million income tax benefit for the same period in 2022. The increase in income tax benefit for the three months ended September 30, 2023 is due to the 2023 third quarter loss primarily occurring in Mexico whereas the 2022 third quarter loss occurred primarily in USA subject to a full valuation allowance.
Year-to-date 2023 compared to year-to-date 2022
General and administrative expenses: For the nine months ended September 30, 2023 and 2022, general and administrative expenses were $5.1 million and $5.6 million, respectively, representing a 9% decrease from the same period of 2022 primarily due to the impact of increased audit fees and consulting services in the second quarter of 2022, related to finalizing the Aquila acquisition and the allocation of $1.7 million corporate personnel costs for management and technical services specifically related to DDGM from general and administrative expenses to production costs for the Mexican operations.
DDGM Exploration expenses: For the nine months ended September 30, 2023, exploration expenses in DDGM totaled $4.0 million, compared to $3.2 million for the same period in 2022. Exploration activities in Oaxaca, Mexico, increased compared to the same period in 2022 primarily due to increased drilling activity and increased contract drilling rates in 2023.
Back Forty Project expenses: For the nine months ended September 30, 2023, costs for the optimization work totaled $1.3 million, compared to $6.9 million for the same period in 2022. The 82% decrease is due to the completion of the optimization work in the third quarter of 2023 and utilizing third parties only on a limited basis until after the completion of the capital cost analysis for the project.
Stock-based compensation: Stock-based compensation decreased by $1.1 million for the nine months ended September 30, 2023 compared to the same period in 2022. This decrease is mainly due to the downward mark-to-market adjustment in the liability-classified share-based awards due to a decrease in share price.
Realized and unrealized loss on zinc zero cost collar: As of December 31, 2022, the Company’s hedge program concluded; therefore, no gains or losses were recorded in 2023. For the nine months ended September 30, 2022, a $0.1 million loss was recorded related to the zinc zero cost collar. The year-to-date loss of $0.1 million is the result of the year-to-date realized loss of $2.4 million offset by the $2.3 million unrealized gain related to the zero cost collars that matured from October through December 2022.
Other expense, net: For the nine months ended September 30, 2023, $4.1 million of other expense was recorded compared to $1.8 million other expense during the same period of 2022. The $2.3 million increase primarily is the result of the $1.5 million severance expense due to the reduction of workforce and change in the leadership team at DDGM in Mexico. Please see Note 18 - Other expense, net in Item 1—Condensed Consolidated Interim Financial Statements and Notes (unaudited) above for a detailed breakdown.
Provision for income taxes: For the nine months ended September 30, 2023, income tax benefit was $4.7 million, compared to $8.9 million income tax expense for the same period in 2022. The decrease in income tax expense for the nine months ended September 30, 2023 is driven by the decrease in the nine-month net income before income taxes.
Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations
38
Other Non-GAAP Financial Measures
Third quarter 2023 compared to third quarter 2022
Total cash cost after co-product credits per AuEq oz sold: For the three months ended September 30, 2023, the total cash cost after co-product credits per AuEq oz sold is $1,839 compared to $1,103 for the same period in 2022. The increase is due to the lower amount of co-product credits we received during the third quarter of 2023, and the 19% decrease in the total number of AuEq ounces sold, offset by a 3% decrease in treatment and refining charges as a result of the decline in third quarter 2023 production as compared to third quarter 2022 production. Although production costs were lower in the third quarter of 2023 compared to the same period last year, the strengthening peso and increased energy costs negatively impacted production costs and, therefore, the cost per tonne processed and the total cash cost after co-product credits per AuEq oz sold.
Total consolidated all-in sustaining cost after co-product credits per AuEq oz sold: For the three months ended September 30, 2023, the total consolidated all-in sustaining cost after co-product credits per AuEq oz sold was $2,669 compared to $1,838 for the same period in 2022. The increase directly relates to the higher cash costs per ounce discussed above.
Total all-in cost after co-product credits per AuEq oz sold: For the three months ended September 30, 2023, the total all-in cost after co-product credits per AuEq oz sold was $3,001 compared to $2,457 for the same period in 2022. The increase is due to the higher all-in sustaining costs discussed above and lower exploration expense related to advancing the Back Forty optimization work and permitting activities.
Year-to-date 2023 compared to year-to-date 2022
Total cash cost after co-product credits per AuEq oz sold: For the nine months ended September 30, 2023, the total cash cost after co-product credits per AuEq oz sold was $1,210 compared to $368 for the same period in 2022. The increase is due to the lower amount of co-product credits we received during the nine months ended September 30, 2023, the 22% decrease in total number of AuEq ounces sold, and the 6% increase in treatment and refining charges as a result of an increase in the zinc treatment charge benchmark and spot price. Although production costs were lower for the nine months ended September 30, 2023 compared to the same period last year, the strengthening peso and increased energy costs negatively impacted production costs and, therefore, the cost per tonne processed and the total cash cost after co-product credits per AuEq oz sold.
Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations
39
Total consolidated all-in sustaining cost after co-product credits per AuEq oz sold: For the nine months ended September 30, 2023, the total consolidated all-in sustaining cost after co-product credits per AuEq oz sold was $1,852 compared to $998 for the same period in 2022. The increase is directly related to the higher cash costs per ounce discussed above, partially offset by lower sustaining capital expenditures.
Total all-in cost after co-product credits per AuEq oz sold: For the nine months ended September 30, 2023, the total all-in cost after co-product credits per AuEq oz sold was $2,082 compared to $1,383 for the same period in 2022. The increase is due to the higher all-in sustaining costs discussed above, partially offset by lower Back Forty costs due to nearing completion of the optimization work and utilizing third parties only on a limited basis until after completion of capital cost analysis for the project.
For a detailed description of each of the non-GAAP financial measures and a reconciliation to GAAP financial measures, please see the discussion below under “Non-GAAP Measures.”
Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations
40
2023 Capital and Exploration Investment Summary
For the nine months ended September 30, 2023 | 2023 full year guidance | |||||
(in thousands) | ||||||
Sustaining Investments: | ||||||
Underground Development | Capital | $ | 3,464 | |||
Infill Drilling | Capitalized Exploration | 3,315 | ||||
Other Sustaining Capital | Capital | 1,485 | ||||
Surface and Underground Exploration Development & Other | Capitalized Exploration | 1,131 | ||||
Subtotal of Sustaining Investments: | 9,395 | $ | 9 - 11 million | |||
Growth Investments: | ||||||
DDGM growth: | ||||||
Surface Exploration / Other | Exploration | 2,058 | ||||
Underground Exploration Drilling | Exploration | 1,916 | ||||
Underground Exploration Development | Capitalized Exploration | 356 | ||||
Back Forty growth: | ||||||
Back Forty Project Optimization & Permitting | Exploration | 1,265 | ||||
Subtotal of Growth Investments: | 5,595 | $ | 6 - 7 million | |||
Total Capital and Exploration: | $ | 14,990 | $ | 15 - 18 million |
The Company’s investment in Mexico through the third quarter of 2023 totaled $13.3 million. Our investment in Mexico is focused on favorably impacting our environment, social, and governance programs while creating operational efficiencies and sustainability. At the Back Forty Project, year-to-date $ 1.3 million has been invested in optimization work and permitting initiatives year-to-date.
Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations
41
Underground and Exploration Development:
Mine development during the quarter included ramps and access to different areas of the deposit, ventilation shafts, and exploration development drifts. A total of 87 meters of development (included in Infill Drilling and Exploration Development in the table above), at a cost of $0.3 million was completed during the third quarter of 2023. As part of ongoing safety initiatives, the Company also invested in additional ground support and improved ventilation for the mine. Year to date, an investment of $1.5 million has been made in the construction of 520 meters of development for exploration purposes.
Examining exploration drill core at an underground drill station (Switchback) |
Back Forty Feasibility and Permitting:
Work on optimizing the Back Forty Project was completed during the third quarter of 2023. Mine planning, process plant design, site layout, and infrastructure were largely completed during 2022. As a result, the Company filed the Back Forty Project Technical Report Summary (S-K 1300) on October 26, 2023. Results of the work indicate a more robust economic project with no planned impacts to wetlands that is more protective of the environment, which should facilitate a successful mine permitting process. The Board continues to evaluate potential alternative options in order to develop the Back Forty Project.
Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations
42
Non-GAAP Measures
Throughout this report, we have provided information prepared or calculated according to U.S. GAAP and have referenced certain non-GAAP performance measures that we believe will assist with understanding the performance of our business. These measures are based on precious metal gold equivalent ounces sold and include (i) total cash cost after co-product credits per ounce and (ii) total all-in sustaining cost after co-product credits (“AISC”) per ounce. Because the non-GAAP performance measures do not have any standardized meaning prescribed by U.S. GAAP, they may not be comparable to similar measures presented by other companies. Accordingly, these measures should not be considered in isolation or as a substitute for, measures of performance prepared in accordance with U.S. GAAP. These non-GAAP measures are not necessarily indicative of operating profit or cash flow from operations as determined under GAAP.
For financial reporting purposes, we report the sale of base metals as part of our revenue. Revenue generated from the sale of base metals in our concentrates is considered a co-product of our gold and silver production for the purpose of calculating our total cash cost after co-product credits for our Don David Gold Mine. We periodically review our revenues to ensure that our reporting of primary products and co-products is appropriate. Because we consider copper, lead, and zinc to be co-products of our precious metal production, the value of these metals continues to be applied as a reduction to total cash costs in our calculation of total cash cost after co-product credits per precious metal gold equivalent ounce sold. Likewise, we believe identifying copper, lead, and zinc as co-product credits is appropriate due to their lower per unit economic value contribution compared to the precious metals and since gold and silver are the primary products we intend to produce.
Total cash cost after co-product credits is a measure developed by the Gold Institute to provide a uniform standard for industry comparison purposes, and it includes total cash cost before co-product credits, less co-product credits, or revenues earned from base metals.
AISC includes total cash cost after co-product credits plus other costs related to sustaining production, including allocated sustaining general and administrative expenses and sustaining capital expenditures. We determined sustaining capital expenditures as those capital expenditures that are necessary to maintain current production and execute the current mine plan. AISC is calculated based on the current guidance from the World Gold Council.
Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations
43
Reconciliations to U.S. GAAP
The following table summarizes the Company’s total all-in cost after co-product credits per precious metal gold equivalent ounce sold:
For the three months ended September 30, | For the nine months ended September 30, | ||||||||||
2023 |
| 2022 | 2023 |
| 2022 | ||||||
(in thousands, except per oz) | |||||||||||
Gold equivalent ounces sold (oz) | 6,532 | 8,042 |
| 24,306 | 31,180 | ||||||
Total production costs (1) | $ | 18,957 | $ | 19,380 | $ | 59,109 | $ | 61,176 | |||
Treatment and refining charges (2) | 2,788 | 2,860 | 9,300 | 8,745 | |||||||
Co-product credits (3) | (9,733) | (13,369) | (38,998) | (60,128) | |||||||
Total cash cost after co-product credits | 12,012 | 8,871 | 29,411 | 9,793 | |||||||
Total cash cost after co-product credits per AuEq oz sold | $ | 1,839 | $ | 1,103 | $ | 1,210 | $ | 314 | |||
Sustaining - capitalized expenditure (4) | 3,489 | 3,605 | 8,264 | 12,229 | |||||||
Reclamation and remediation (5) | 216 | 58 | 611 | 181 | |||||||
Subtotal of DDGM sustaining costs | 3,757 | 3,663 | 10,006 | 12,410 | |||||||
DDGM all-in sustaining cost after co-product credits per AuEq oz sold | 2,414 | 1,559 | $ | 1,622 | $ | 712 | |||||
Sustaining - general and administrative, including stock-based compensation expenses (6) | 1,662 | 2,249 | 5,589 | 7,235 | |||||||
Consolidated all-in sustaining cost after co-product credits | 17,431 | 14,783 | 45,006 | 29,438 | |||||||
Total consolidated all-in sustaining cost after co-product credits per AuEq oz sold | $ | 2,669 | $ | 1,838 | $ | 1,852 | $ | 944 | |||
Non-sustaining cost- capital expenditure (4) | 209 | - | 356 | 1,894 | |||||||
Non-sustaining cost- exploration expenditure (1) | 1,960 | 4,973 | 5,239 | 10,115 | |||||||
Subtotal of non-sustaining costs | 2,169 | 4,973 | 5,595 | 12,009 | |||||||
Total all-in cost after co-product credits | 19,600 | 19,756 | 50,601 | 41,447 | |||||||
Total all-in cost after co-product credits per AuEq oz sold | $ | 3,001 | $ | 2,457 | $ | 2,082 | $ | 1,329 |
(1) | Refer to Production costs in Item 1—Condensed Consolidated Interim Financial Statements and Notes (unaudited): Condensed Consolidated Interim Statements of Operations. |
(2) | Refer to Treatment and refining charges in Item 1—Condensed Consolidated Interim Financial Statements and Notes (unaudited): Note 3 – Revenue. |
(3) | Refer to Realized/Unrealized Derivatives for copper, zinc, and lead in Item 1—Condensed Consolidated Interim Financial Statements and Notes (unaudited): Note 20 – Fair Value Measurement. Note that Co-product credits for the prior year (2022) comparable numbers were adjusted to include realized embedded derivatives only for co-products (which better represents the cash cost after co-product credits because it now excludes unrealized gains or losses) and align with the current year presentation. |
(4) | Refer to Capital expenditures in Item 1—Condensed Consolidated Interim Financial Statements and Notes (unaudited): Condensed Consolidated Interim Statements of Cash Flows. |
(5) | Refer to Reclamation and remediation in Item 1—Condensed Consolidated Interim Financial Statements and Notes (unaudited): Condensed Consolidated Interim Statements of Operations. Note that the prior year (2022) comparable numbers were adjusted to include Reclamation and remediation (which better represents the all-in sustaining cost after co-product credits because reclamation and remediation is part of normal operating activities) and align with the current year presentation. |
(6) | Refer to General and administrative expenses and Stock-based compensation in Item 1—Condensed Consolidated Interim Financial Statements and Notes (unaudited): Condensed Consolidated Interim Statements of Operations. |
Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations
44
Trending Highlights
2022 | 2023 | |||||||
Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | ||
Operating Data | ||||||||
Total tonnes milled | 136,844 | 129,099 | 110,682 | 116,616 | 117,781 | 113,510 | 116,626 | |
Average Grade | - | |||||||
Gold (g/t) | 3.00 | 2.63 | 1.98 | 2.51 | 2.33 | 1.59 | 1.52 | |
Silver (g/t) | 81 | 64 | 80 | 109 | 94 | 86 | 73 | |
Copper (%) | 0.41 | 0.32 | 0.37 | 0.45 | 0.37 | 0.37 | 0.32 | |
Lead (%) | 1.97 | 1.99 | 1.59 | 1.58 | 1.73 | 1.64 | 1.29 | |
Zinc (%) | 4.89 | 4.00 | 4.21 | 4.27 | 3.88 | 3.72 | 3.24 | |
Metal production (before payable metal deductions) | ||||||||
Gold (ozs.) | 11,187 | 9,317 | 5,851 | 7,767 | 7,171 | 4,637 | 4,443 | |
Silver (ozs.) | 332,292 | 249,088 | 261,256 | 370,768 | 322,676 | 289,816 | 247,159 | |
Copper (tonnes) | 431 | 303 | 296 | 406 | 336 | 334 | 276 | |
Lead (tonnes) | 2,073 | 2,020 | 1,249 | 1,323 | 1,559 | 1,389 | 1,048 | |
Zinc (tonnes) | 5,562 | 4,282 | 3,901 | 4,198 | 3,837 | 3,569 | 3,223 | |
Metal produced and sold | ||||||||
Gold (ozs.) | 8,381 | 8,746 | 5,478 | 7,514 | 6,508 | 4,287 | 3,982 | |
Silver (ozs.) | 265,407 | 231,622 | 225,012 | 335,168 | 294,815 | 274,257 | 208,905 | |
Copper (tonnes) | 408 | 286 | 282 | 372 | 332 | 327 | 245 | |
Lead (tonnes) | 1,639 | 1,755 | 1,056 | 941 | 1,417 | 1,317 | 947 | |
Zinc (tonnes) | 4,359 | 3,590 | 2,943 | 3,265 | 3,060 | 3,141 | 2,571 | |
Average metal prices realized | ||||||||
Gold ($ per oz.) | $ 1,898 | $ 1,874 | $ 1,627 | $ 1,734 | $ 1,915 | $ 2,010 | $ 1,934 | |
Silver ($ per oz.) | $ 23.94 | $ 22.05 | $ 18.54 | $ 21.25 | $ 23.04 | $ 24.93 | $ 23.61 | |
Copper ($ per tonne) | $ 10,144 | $ 9,275 | $ 7,115 | $ 8,221 | $ 9,172 | $ 8,397 | $ 8,185 | |
Lead ($ per tonne) | $ 2,347 | $ 2,168 | $ 1,882 | $ 1,954 | $ 2,158 | $ 2,153 | $ 2,196 | |
Zinc ($ per tonne) | $ 3,842 | $ 4,338 | $ 3,186 | $ 2,577 | $ 3,195 | $ 2,485 | $ 2,195 | |
Gold equivalent ounces sold | ||||||||
Gold Ounces | 8,381 | 8,746 | 5,478 | 7,514 | 6,508 | 4,287 | 3,982 | |
Gold Equivalent Ounces from Silver | 3,348 | 2,729 | 2,564 | 4,107 | 3,547 | 3,402 | 2,550 | |
Total AuEq oz | 11,729 | 11,475 | 8,042 | 11,621 | 10,055 | 7,689 | 6,532 | |
Financial Data | ||||||||
Total sales, net (in thousands) | $ 45,417 | $ 37,064 | $ 23,869 | $ 32,374 | $ 31,228 | $ 24,807 | $ 20,552 | |
Production Costs (in thousands) | $ 20,074 | $ 21,722 | $ 19,380 | $ 19,773 | $ 19,850 | $ 20,302 | $ 18,957 | |
Production Costs/Tonnes Milled | $ 147 | $ 168 | $ 175 | $ 170 | $ 169 | $ 179 | $ 163 | |
Operating Cash Flows (in thousands) | $ 4,230 | $ 7,976 | ($ 4,292) | $ 6,243 | $ 1,024 | ($ 551) | ($ 7,475) | |
Net income (loss) (in thousands) | $ 4,019 | $ 2,673 | ($ 9,730) | ($ 3,283) | ($ 1,035) | ($ 4,584) | ($ 7,341) | |
Earnings (loss) per share - basic | $ 0.05 | $ 0.03 | ($ 0.11) | ($ 0.04) | ($ 0.01) | ($ 0.05) | ($ 0.08) |
Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations
45
Trending Highlights of Non-GAAP Measures
2022 | 2023 | |||||||
Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | ||
(in thousands, except per oz) | ||||||||
Gold equivalent ounces sold (oz) | 11,729 | 11,475 | 8,042 | 11,621 | 10,055 | 7,689 | 6,532 | |
Total production costs | $ 20,074 | $ 21,722 | $ 19,380 | $ 19,773 | $ 19,850 | $ 20,302 | $ 18,957 | |
Treatment and refining charges | 2,748 | 3,137 | 2,860 | 3,327 | 3,184 | 3,328 | 2,788 | |
Co-product credits (1) | (24,732) | (22,027) | (13,369) | (13,314) | (15,881) | (13,384) | (9,733) | |
Total cash cost after co-product credits | ($ 1,910) | $ 2,832 | $ 8,871 | $ 9,786 | $ 7,153 | $ 10,246 | $ 12,012 | |
Total cash cost after co-product credits per AuEq oz sold | ($ 163) | $ 247 | $ 1,103 | $ 842 | $ 711 | $ 1,333 | $ 1,839 | |
Sustaining - capitalized expenditure | $ 4,596 | $ 4,028 | $ 3,605 | $ 4,110 | $ 2,588 | $ 2,187 | $ 3,489 | |
Sustaining - Exploration Expenditure | - | - | - | - | 548 | 531 | 52 | |
Reclamation and remediation (2) | 62 | 61 | 58 | 620 | 195 | 200 | 216 | |
Subtotal of DDGM sustaining costs | $ 4,658 | $ 4,089 | $ 3,663 | $ 4,730 | $ 3,331 | $ 2,918 | $ 3,757 | |
DDGM all-in sustaining cost after co-product credits per AuEq oz sold | $ 234 | $ 603 | $ 1,559 | $ 1,249 | $ 1,043 | $ 1,712 | $ 2,414 | |
Sustaining - general and administrative, including stock-based compensation expenses | $ 2,673 | $ 2,313 | $ 2,249 | $ 2,768 | $ 1,790 | $ 2,137 | $ 1,662 | |
Consolidated all-in sustaining cost after co-product credits | $ 5,421 | $ 9,234 | $ 14,783 | $ 17,284 | $ 12,274 | $ 15,301 | $ 17,431 | |
Total consolidated all-in sustaining cost after co-product credits per AuEq oz sold | $ 462 | $ 805 | $ 1,838 | $ 1,487 | $ 1,221 | $ 1,990 | $ 2,669 | |
Non-sustaining cost- capital expenditure | $ 1,353 | $ 541 | $ - | $ - | $ - | $ 147 | $ 209 | |
Non-sustaining cost- exploration expenditure | 2,305 | 2,837 | 4,973 | 2,934 | 1,839 | 1,440 | 1,960 | |
Subtotal of non-sustaining costs | $ 3,658 | $ 3,378 | $ 4,973 | $ 2,934 | $ 1,839 | $ 1,587 | $ 2,169 | |
Total all-in cost after co-product credits | $ 9,079 | $ 12,612 | $ 19,756 | $ 20,218 | $ 14,113 | $ 16,888 | $ 19,600 | |
Total all-in cost after co-product credits per AuEq oz sold | $ 774 | $ 1,099 | $ 2,457 | $ 1,740 | $ 1,404 | $ 2,196 | $ 3,001 |
(1) | Refer to Realized/Unrealized Derivatives for copper, zinc, and lead in the current and previously filed Item 1—Condensed Consolidated Interim Financial Statements and Notes (unaudited): Note 20 – Fair Value Measurement. Note that Co-product credits for the prior year (2022) comparable numbers were adjusted to include realized embedded derivatives only for co-products (which better represents the cash cost after co-product credits because it now excludes unrealized gains or losses) and align with the current year presentation. |
(2) | Refer to Reclamation and remediation in the current and previously filed Item 1—Condensed Consolidated Interim Financial Statements and Notes (unaudited): Condensed Consolidated Interim Statements of Operations. Note that the prior year (2022) comparable numbers were adjusted to include Reclamation and remediation (which better represents the all-in sustaining cost after co-product credits because reclamation and remediation is part of normal operating activities) and align with the current year presentation. |
Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations
46
Liquidity and Capital Resources
As of September 30, 2023, working capital was $13.8 million, consisting of current assets of $28.9 million and current liabilities of $15.1 million. This represents a $7.6 million, or 36%, decrease from the working capital balance of $21.4 million as of December 31, 2022. The primary factors influencing the decrease in our working capital were a payment of the liability related to the mining royalty tax, the cash used by operating activities of $7.0 million, and the cash used in investing activities of $9.8 million as reported in the Condensed Consolidated Interim Statements of Cash Flows. Our working capital balance fluctuates as we use cash to fund our operations, financing and investing activities, including exploration, mine development, and income taxes. We believe that as a result of our cash balances, the performance of our current and expected operations, and the current metals prices, we will be able to meet our known obligations and other potential cash requirements for the next 12 months.
Long-term liabilities assumed with the Aquila acquisition, capital requirements to develop the Back Forty Project, and potential project financing may have an impact on liquidity in the long term. These long-term liabilities are contingent upon the approval of the Back Forty Project by the Company’s Board of Directors and securing project financing. Project financing is not expected to be required any earlier than 2024.
Cash and cash equivalents as of September 30, 2023 decreased to $6.7 million from $23.7 million as of December 31, 2022, a net decrease in cash of $17.0 million. The decrease is primarily due to cash spent on capital and exploration expenditures at DDGM and at the Back Forty Project and mining royalty tax payments for the 2022 tax years.
Of the $6.7 million cash balance as of September 30, 2023, $5.0 million was held in foreign subsidiaries, primarily held in U.S. dollar denominated accounts, with the remainder in foreign currencies readily convertible to U.S. dollars. The Don David Gold Mine’s primary source of liquidity is the sale of doré and concentrates. The Don David Gold Mine has been self-sustaining since production commencement in 2010 and has been a source of cash for U.S. operations and projects.
Net cash used in operating activities for the nine months ended September 30, 2023 was $7.0 million compared to $7.9 million operating cash inflow for the same period in 2022. While net sales decreased by 28% for the nine months ended September 30, 2023, compared to the same period in 2022, due to lower grades and lower recoveries, production costs only decreased by 3% due to the strengthening of peso and higher inflation, resulting in net cash outflows from operations in 2023.
Net cash used in investing activities of $9.8 million for the nine months ended September 30, 2023 decreased from $15.3 million from the same period in 2022. The decrease is mainly attributed to the 2022 investment in work to complete the commissioning of the filtration plant, the dry stack facility, and the gold regrind circuit. Investing activities in 2023 are mainly attributable to continued reinvestment in DDGM.
Net cash from financing activities for the nine months ended September 30, 2023 was a net inflow of $33 thousand compared to a net outflow of $3.0 million for the same period in 2022. The change is primarily related to the discontinuation of shareholder dividends.
While current macro risk factors, such as economic uncertainties and supply chain interruptions have not had a significant adverse impact on exploration plans, results of operations, financial position, and cash flows during the current fiscal year, future impacts are unknown at this time. However, we believe there is sufficient liquidity and capital resources to fund operations and corporate activities for the foreseeable future.
The Company’s At The Market Offering Agreement with H.C. Wainwright & Co., LLC (the “Agent”), which was entered into in November 2019 (the “ATM Agreement”), pursuant to which the Agent agreed to act as the Company’s sales agent with respect to the offer and sale from time to time of the Company’s common stock having an aggregate gross sales price of up to $75.0 million, was renewed in June 2023. An aggregate of 130,199 shares of the Company’s common stock were sold through the ATM Agreement during both the three and nine months ended September 30, 2023, for net proceeds to the Company, after deducting the Agent’s commissions and other expenses, of $0.1 million. There were no ATM sales during the three and nine months ended September 30, 2022.
Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations
47
Accounting Developments
For a discussion of recently adopted and recently issued accounting pronouncements, please see Note 2—Recently Adopted Accounting Standards in Item 1—Condensed Consolidated Interim Financial Statements and Notes (unaudited) above.
Forward-Looking Statements
This report contains “forward-looking statements” within the meaning of Section 27A of the Securities Act of 1933 and Section 21E of the Securities Exchange Act of 1934. We use the words “anticipate,” “continue,” “likely,” “estimate,” “expect,” “may,” “could,” “will,” “project,” “should,” “believe,” and similar expressions (including negative and grammatical variations) to identify forward looking statements. Such forward-looking statements include, without limitation, statements regarding:
● | Our strategy for significant future investment in Oaxaca, Mexico, and in Michigan, USA, for development and exploration activities; |
● | The expected timing for the Back Forty optimized feasibility study, permitting, detailed engineering, and project financing; |
● | Our expectations regarding future grades and recoveries from mining at DDGM; |
● | Expectations regarding capital investment, exploration spending, and general and administrative costs; |
● | Future exploration plans at DDGM, including vein systems targeted for future exploration activity; |
● | Compliance with existing legal and regulatory requirements, including future asset reclamation costs; |
● | Estimates of Mineral Resources and Mineral Reserves; |
● | Our expectations regarding whether dividends will be paid in the future; and |
● | Our ability to satisfy our obligations and other potential cash requirements over the next twelve months. |
Forward-looking statements are neither historical facts nor assurances of future performance. Rather, they are based only on our current beliefs, expectations, and assumptions regarding the future of our business, future plans and strategies, projections, anticipated events and trends, the economy, and other future conditions. Because forward-looking statements relate to the future, they are subject to inherent uncertainties, risks, and changes in circumstances that are difficult to predict, and many of which are outside of our control. Our actual results and financial condition may differ materially from those indicated in the forward-looking statements. Therefore, you should not rely on any of these forward-looking statements. Important factors that could cause our actual results and financial condition to differ materially from those indicated in the forward-looking statements include, among others, the following:
● | Commodity price fluctuations; |
● | Mine protests and work stoppages; |
● | Rock formations, faults and fractures, water flow and possible CO2 gas exhalation, or other unanticipated geological challenges; |
● | Unexpected changes in business and economic conditions, including supply chain challenges, the rate of inflation, and their impact on operating and capital costs; |
Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations
48
● | Changes in interest rates and currency exchange rates; |
● | Adverse technological changes and cybersecurity threats; |
● | Unanticipated increases in our operating costs and other costs of doing business; |
● | Access to land and availability of materials, equipment, supplies, labor and supervision, power, and water; |
● | Results of current and future feasibility studies; |
● | Interpretation of drill hole results and the geology, grade, and continuity of mineralization; |
● | Litigation by private parties or regulatory action by governmental entities; |
● | Acts of God, such as floods, earthquakes, and any other natural disasters; |
● | The inherent uncertainty of Mineral Resource and Mineral Reserve estimates; and |
● | Such other factors are discussed below under Item 1A—Risk Factors in Part II—Other Information. |
Many of these factors are beyond our ability to control or predict. Although we believe that the expectations reflected in our forward-looking statements are based on reasonable assumptions, such expectations may prove to be materially incorrect due to known and unknown risks and uncertainties. You should not unduly rely on any of our forward-looking statements. These statements speak only as of the date of this Quarterly Report on Form 10-Q. Except as required by law, we are not obligated to publicly release any revisions to these forward-looking statements to reflect future events or developments. All subsequent written and oral forward-looking statements attributable to us and persons acting on our behalf are qualified in their entirety by the cautionary statements contained in this section and elsewhere in this Quarterly Report on Form 10-Q.
Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations
49
ITEM 3: Quantitative and Qualitative Disclosures about Market Risk
Our exposure to market risks includes, but is not limited to, the following risks: changes in commodity prices, foreign currency exchange rates, provisional sales contract risks, changes in interest rates, and equity price risks. We do not use derivative financial instruments as part of an overall strategy to manage market risk; however, we may consider such arrangements in the future as we evaluate our business and financial strategy.
Commodity Price Risk
The results of our operations, cash flows, and financial condition largely depend upon the market prices of gold, silver, copper, lead, and zinc. Metal prices fluctuate widely and are affected by numerous factors beyond our control. The level of interest rates, the rate of inflation, government fiscal and monetary policy, the stability of exchange rates, and the world supply of and demand for gold, silver, and other metals, among other factors, can all cause significant fluctuations in commodity prices. Such external economic factors are, in turn, influenced by changes in international investment patterns, monetary systems, and political developments. The metal price markets have fluctuated widely in recent years, and future price declines could cause a mineral project to become uneconomic, thereby having a material adverse effect on our business and financial condition. We previously entered into a zinc zero cost collar to protect the selling price for zinc, but that hedge program concluded on December 31, 2022. We have not entered into derivative contracts to protect the selling price for gold, silver, copper, or lead. We may, in the future, more actively manage our exposure through additional derivative contracts, although we have no intention of doing so in the near term.
In addition to materially adversely affecting our reserve estimates, results of operations and/or our financial condition, declining gold and silver prices could require a reassessment of the feasibility of a project. Even if a project is ultimately determined to be economically viable, the need to conduct such a reassessment may cause delays in the implementation of a project.
Foreign Currency Risk
Our foreign operation sells its gold, silver, copper, lead, and zinc production based on U.S. dollar metal prices. Fluctuations in foreign currency exchange rates do not have a material impact on our revenue since gold, silver, copper, lead, and zinc are sold worldwide in U.S. dollars.
Foreign currency exchange rate fluctuations can increase or decrease our costs to the extent that we pay costs in currencies other than the U.S. Dollar. We are primarily impacted by Mexican peso rate changes relative to the U.S. Dollar, as we incur some costs in the Mexican peso. When the value of the peso rises in relation to the U.S. Dollar, some of our costs in Mexico may increase, thus materially adversely affecting our operating results. Alternatively, when the value of the peso drops in relation to the U.S. Dollar, peso-denominated costs in Mexico will decrease in U.S. Dollar terms. Future fluctuations may give rise to foreign currency exposure, which may affect our financial results. Approximately 50% to 60% of expenses are paid in currencies other than the U.S. dollar.
We have not utilized market-risk sensitive instruments to manage our exposure to foreign currency exchange rates. However, we may, in the future, actively manage our exposure to foreign currency exchange rate risk.
Gold Resource Corporation
50
Provisional Sales Contract Risk
We enter into concentrate sales contracts, which, in general, provide for a provisional payment to us based upon provisional assays and prices. The provisionally priced sales contracts contain an embedded derivative that is required to be separated from the host contract for accounting purposes. The host contract is the receivable from the sale of concentrates determined at the quoted metal prices at the time of shipment delivery to the customer. The embedded derivative, which does not qualify for hedge accounting, is adjusted to market through revenue each period prior to settlement. Changes in the prices of metals between the shipment delivery and the final settlement date will result in adjustments to revenues related to the sales of concentrate previously recorded upon shipment delivery. Please see Note 14—Derivatives in Item 1—Condensed Consolidated Interim Financial Statements and Notes (unaudited) above for additional information.
Interest Rate Risk
We consider our interest rate risk exposure to be insignificant at this time, as our interest rate is related and embedded in immaterial payments for office leases.
Equity Price Risk
We have, in the past, and may in the future, seek to acquire additional funding through the sale of common stock and other equity. The price of our common stock has been volatile in the past and may also be volatile in the future. As a result, there is a risk that we may not be able to sell our common stock at an acceptable price should the need for new equity funding arise.
ITEM 4: Controls and Procedures
Evaluation of Disclosure Controls and Procedures
During the fiscal period covered by this report, our management, with the participation of our Chief Executive Officer and Chief Financial Officer, evaluated of the effectiveness of the design and operation of our disclosure controls and procedures (as defined in Rules 13a-15(e) and 15d-15(e) of the Securities Exchange Act of 1934, as amended). Based on such evaluation, our Chief Executive Officer and Chief Financial Officer have concluded that, as of the end of the period covered by this report, our disclosure controls and procedures were effective in ensuring that information required to be disclosed by us in reports that we file or submit under the Exchange Act are recorded, processed, summarized and reported within the required time periods and are designed to ensure that information required to be disclosed in our reports is accumulated and communicated to our management, including our Chief Executive Officer and Chief Financial Officer as appropriate, to allow timely decisions regarding required disclosure.
Changes in Internal Control Over Financial Reporting
There were no changes that occurred during the three months ended September 30, 2023 that have materially affected, or are reasonably likely to materially affect, our internal control over financial reporting.
PART II – OTHER INFORMATION
ITEM 1: Legal Proceedings
In February 2020, a local Ejido community (who claim to be an indigenous community) filed an injunction against the Mexican federal government through which they demanded the cancellation of several concession titles. The federal government ordered a suspension to prevent work related to excavating, drilling, opening tunnels and exploiting the mineral resources on the surface and subsoil of the concessions named in the injunction. Presently, the Don David Gold Mine does not perform such works in the named concessions in lands of the indigenous community. The lawsuit filed in February 2020 has not progressed to a final ruling.
Gold Resource Corporation
51
We know of no other material, existing or pending legal proceedings against us, nor are we involved as a plaintiff in any material proceeding or pending litigation.
ITEM 1A: Risk Factors
Item 1A. Risk Factors of the 2022 Annual Report includes a discussion of our known material risk factors, other than risks that could apply to any issuer or offering. There have been no material changes from the risk factors described in the 2022 Annual Report.
ITEM 2: Unregistered Sales of Equity Securities and Use of Proceeds
None.
ITEM 3: Defaults upon Senior Securities
None.
ITEM 4: Mine Safety Disclosures
While the Company owns an advanced exploration project in Michigan, USA, the project is not yet subject to the Mine Safety and Health Administration jurisdiction and therefore, the mine safety disclosure requirements are not applicable.
ITEM 5: Other Information
None.
ITEM 6: Exhibits
The following exhibits are filed or furnished herewith or incorporated herein by reference:
Exhibit | Descriptions | |
31.1 | Certification pursuant to Section 302 of the Sarbanes-Oxley Act of 2002 for Allen Palmiere. | |
31.2 | Certification pursuant to Section 302 of the Sarbanes-Oxley Act of 2002 for Chet Holyoak. | |
32* | ||
101 | Financial statements from the Quarterly Report on Form 10-Q of Gold Resource Corporation as of or for the three and nine months ended September 30, 2023, formatted in inline XBRL: (i) the Condensed Consolidated Interim Balance Sheets, (ii) the Condensed Consolidated Interim Statements of Operations, (iii) the Condensed Consolidated Interim Statements of Changes in Shareholders’ Equity, (iv) the Condensed Consolidated Interim Statements of Cash Flows, and (v) the Notes to the Condensed Consolidated Interim Financial Statements. | |
104 | Cover Page Interactive Data File (embedded within the XBRL document) |
* | This document is not being “filed” for purposes of Section 18 of the Securities Exchange Act of 1934, as amended, or otherwise subject to the liabilities of that Section. Registration Statements or other documents filed with the SEC shall not incorporate this exhibit by reference, except as otherwise expressly stated in such filing. |
Gold Resource Corporation
52
SIGNATURES
In accordance with Section 13 or 15(d) of the Exchange Act of 1934, the Company has caused this Report to be signed on its behalf by the undersigned, thereunto duly authorized.
GOLD RESOURCE CORPORATION | |||
Dated: November 6, 2023 | /s/ Allen Palmiere | ||
By: | Allen Palmiere, | ||
Chief Executive Officer, | |||
Dated: November 6, 2023 | /s/ Chet Holyoak | ||
By: | Chet Holyoak, | ||
Chief Financial Officer |
Gold Resource Corporation
53