UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
FORM
(Mark One)
QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 |
For the quarterly period ended
TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 |
For the transition period from ______ to ______
Commission File Number:
(Exact Name of Registrant as Specified in its charter)
(State or other jurisdiction of incorporation or organization) | (I.R.S. Employer Identification No.) |
(Address of Principal Executive Offices) (Zip Code)
(
(Registrant’s telephone number including area code)
Securities registered pursuant to Section 12(b) of the Act:
a | ||
Title of each class | Trading Symbol | Name of each exchange where registered |
Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.
Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit such files).
Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, a smaller reporting company, or an emerging growth company. See definitions of “large accelerated filer”, “accelerated filer”, “smaller reporting company”, and “emerging growth company” in Rule 12b-2 of the Exchange Act.
Large accelerated filer | ◻ | ☒ | |
Non-accelerated filer | ◻ | Smaller reporting company | |
Emerging growth company |
If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act◻
Indicate by check mark whether registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act). Yes
Indicate the number of shares outstanding of each of the issuer’s classes of common stock, as of the latest practicable date:
GOLD RESOURCE CORPORATION
FORM 10-Q
Table of Contents
Page | |||
2 | |||
3 | |||
3 | |||
3 | |||
4 | |||
5 | |||
6 | |||
7 | |||
Management’s Discussion and Analysis of Financial Condition and Results of Operations | 23 | ||
43 | |||
44 | |||
44 | |||
44 | |||
45 | |||
45 | |||
45 | |||
45 | |||
45 | |||
45 | |||
46 |
San Jose de Gracia, Oaxaca |
Gold Resource Corporation
1
FIRST QUARTER 2023 HIGHLIGHTS
Highlights for the three months ended March 31, 2023 are summarized below and discussed further in our Management’s Discussion and Analysis:
Financial
● | We have $21.4 million in cash as of March 31, 2023, representing a decrease of $2.3 million since December 31, 2022. |
● | Net loss was $1.0 million or $0.01 per share for the quarter. |
● | Working capital was $24.1 million as of March 31, 2023, $2.7 million higher than as of December 31, 2022. The increase is primarily due to a decrease in mining royalty taxes payable as discussed above partially offset by a decrease in cash. |
● | Total cash cost for the quarter was $711 per gold equivalent (“AuEq”) ounce (after co-product credits) and total all-in sustaining cost for the quarter was $1,221 per AuEq ounce (after co-product credits). Both non-GAAP measures were higher in the quarter compared to the same period in 2022 due to the impact of higher unit production costs and lower co-product credits in the current year (see Management’s Discussion and Analysis of Financial Condition and Results of Operations – Non-GAAP Measures below for a reconciliation of non-GAAP measures to applicable GAAP measures). |
● | The Company’s Annual Meeting of Shareholders will be held in person on June 15, 2023. Information regarding notice, materials, and voting can be found in the 2023 Proxy Statement that will be filed with the SEC on April 28, 2023 and available at https://www.sec.gov/edgar. |
Don David Gold Mine
● | The Don David Gold Mine (“DDGM”) safety program aims to bolster the overall health and safety culture of our employees. |
o | There was one lost time incident during the first quarter of 2023. This incident was fully investigated, and corrective action was taken. |
o | The year-to-date lost time injury frequency rate per million hours of 1.96 is substantially below the Camimex (Mexican Chamber of Mines) industry average of 4.52. |
● | For the ninth consecutive year, the Don David Gold Mine earned the prestigious Empresa Socialmente Responsable (“ESR”) award from the Mexican Center for Philanthropy (“CEMEFI”). Awards are given to organizations who demonstrate a commitment to supporting social and environmental protection programs within their local communities. |
● | In the first quarter of 2023, the Don David Gold Mine produced and sold a total of 10,055 gold equivalent (“AuEq”) ounces, comprised of 6,508 gold ounces and 294,815 silver ounces at an average sales price per ounce of $1,915 and $23, respectively. |
● | Exploration has progressed as planned during the first quarter with work continuing to focus on infill drilling with encouraging results. Our 2023 exploration objectives are to identify and define additional mineral resources from the Three Sisters, South Soledad, Sagrario, and Marena vein systems. |
Back Forty Project
● | The feasibility study work for the Back Forty Project in Michigan, USA progressed during the first quarter of 2023. Work related to metallurgy and the economic model will continue with a deliberate and measured approach. |
● | Once the feasibility study work is completed, the Company’s Board of Directors will evaluate the current economic climate and make a decision on how to proceed with the Back Forty Mine. |
Gold Resource Corporation
2
PART I - FINANCIAL INFORMATION
ITEM 1. Financial Statements
GOLD RESOURCE CORPORATION
CONDENSED CONSOLIDATED INTERIM BALANCE SHEETS
(U.S. dollars in thousands, except share and per share amounts)
(Unaudited)
As of | As of | |||||
March 31, | December 31, | |||||
Note | 2023 |
| 2022 | |||
ASSETS | ||||||
Current assets: | ||||||
Cash and cash equivalents | $ | | $ | | ||
Accounts receivable, net | | | ||||
Inventories, net | 4 | | | |||
Prepaid expenses and other current assets | 6 | | | |||
Total current assets | | | ||||
Property, plant and mine development, net | 7 | | ||||
Other non-current assets | 8 | | | |||
Total assets | $ | | $ | |||
LIABILITIES AND SHAREHOLDERS' EQUITY | ||||||
Current liabilities: | ||||||
Accounts payable | $ | | $ | | ||
Mining royalty taxes payable, net | | | ||||
Contingent consideration | 12 | | | |||
Accrued expenses and other current liabilities | 9 | | | |||
Total current liabilities | | | ||||
Reclamation and remediation liabilities | 11 | | | |||
Gold and silver stream agreements liability | 10 | | | |||
Deferred tax liabilities, net | 5 | | | |||
Contingent consideration | 12 | | | |||
Other non-current liabilities | 9 | | | |||
Total liabilities | | | ||||
Shareholders' equity: | ||||||
Common stock - $ | ||||||
| | |||||
Additional paid-in capital | | | ||||
Retained earnings | | | ||||
Treasury stock at cost, | ( | ( | ||||
Accumulated other comprehensive loss | ( | ( | ||||
Total shareholders' equity | | | ||||
Total liabilities and shareholders' equity | $ | | $ | |
The accompanying notes are an integral part of these Condensed Consolidated Interim Financial Statements.
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes—Unaudited
3
GOLD RESOURCE CORPORATION
CONDENSED CONSOLIDATED INTERIM STATEMENTS OF OPERATIONS
(U.S. dollars in thousands, except share and per share amounts)
(Unaudited)
For the three months ended | |||||||
March 31, | |||||||
Note |
| 2023 |
| 2022 | |||
Sales, net | 3 | $ | | $ | | ||
Cost of sales: | |||||||
Production costs | | | |||||
Depreciation and amortization | | | |||||
Reclamation and remediation | | | |||||
Total cost of sales | | | |||||
Mine gross profit | | | |||||
Costs and expenses: | |||||||
General and administrative expenses | | | |||||
Mexico exploration expenses | | | |||||
Michigan Back Forty Project expenses | | | |||||
Stock-based compensation | 16 | | | ||||
Realized and unrealized loss on zinc zero cost collar | 17 | - | | ||||
Other expense, net | 18 | | | ||||
Total costs and expenses | | | |||||
(Loss) income before income taxes | ( | | |||||
(Benefit) provision for income taxes | 5 | ( | | ||||
Net (loss) income | $ | ( | $ | | |||
Net (loss) income per common share: | |||||||
Basic and diluted net (loss) income per common share | 19 | ( | | ||||
Weighted average shares outstanding: | |||||||
Basic | 19 | | | ||||
Diluted | 19 | | |
The accompanying notes are an integral part of these Condensed Consolidated Interim Financial Statements.
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes—Unaudited
4
GOLD RESOURCE CORPORATION
CONDENSED CONSOLIDATED INTERIM STATEMENTS OF CHANGES IN SHAREHOLDERS’ EQUITY
(U.S. dollars in thousands, except share amounts)
(Unaudited)
For the three months ended March 31, 2023 and 2022 | ||||||||||||||||||||
| Number of |
| Par Value of |
| Additional Paid- |
| Retained |
| Treasury |
| Accumulated |
| Total | |||||||
Balance, December 31, 2021 | | $ | | $ | | $ | | $ | ( | $ | ( | $ | | |||||||
Stock-based compensation | - | - | | - | - | - | | |||||||||||||
Net stock options exercised | - | - | ( | - | - | - | ( | |||||||||||||
Dividends declared (1) | - | - | - | ( | - | - | ( | |||||||||||||
Net income | - | - | - | | - | - | | |||||||||||||
Balance, March 31, 2022 | | $ | | $ | | $ | | $ | ( | $ | ( | $ | | |||||||
Balance, December 31, 2022 | | $ | | $ | | $ | | $ | ( | $ | ( | $ | | |||||||
Stock-based compensation | - | - | | - | - | - | | |||||||||||||
Common stock issued for vested restricted stock units | | - | - | - | - | - | - | |||||||||||||
Surrender of stock for taxes due on vesting | ( | - | ( | - | - | - | ( | |||||||||||||
Net loss | - | - | ( | - | - | ( | ||||||||||||||
Balance, March 31, 2023 | | $ | | $ | | $ | | $ | ( | $ | ( | $ | |
(1) | Cash dividends declared and paid per share was $ |
The accompanying notes are an integral part of these Condensed Consolidated Interim Financial Statements.
GOLD RESOURCE CORPORATION
CONDENSED CONSOLIDATED INTERIM STATEMENTS OF CASH FLOWS
(U.S. dollars in thousands)
(Unaudited)
For the three months ended March 31, | ||||||
Note | 2023 |
| 2022 | |||
Cash flows from operating activities: | ||||||
Net (loss) income | $ | ( | $ | | ||
Adjustments to reconcile net (loss) income to net cash provided by operating activities: | ||||||
Deferred income tax benefit | ( | ( | ||||
Depreciation and amortization, including amortization in reclamation | | | ||||
Stock-based compensation | | | ||||
Other operating adjustments | 21 | | | |||
Changes in operating assets and liabilities: | ||||||
Accounts receivable | ( | ( | ||||
Inventories | | ( | ||||
Prepaid expenses and other current assets | | | ||||
Other noncurrent assets | ( | | ||||
Accounts payable and other accrued liabilities | ( | ( | ||||
Mining royalty and income taxes payable, net | ( | ( | ||||
Net cash provided by operating activities | | | ||||
Cash flows from investing activities: | ||||||
Capital expenditures | ( | ( | ||||
Proceeds from the sale of gold and silver rounds | - | | ||||
Net cash used in investing activities | ( | ( | ||||
Cash flows from financing activities: | ||||||
Cash settlement of options exercise | - | ( | ||||
Dividends paid | - | ( | ||||
Other financing activities | ( | - | ||||
Net cash used in financing activities | ( | ( | ||||
Effect of exchange rate changes on cash and cash equivalents | ( | ( | ||||
Net decrease in cash and cash equivalents | ( | ( | ||||
Cash and cash equivalents at beginning of period | | | ||||
Cash and cash equivalents at end of period | $ | | $ | | ||
Supplemental Cash Flow Information | ||||||
Income and mining taxes paid | $ | | $ | |||
Non-cash investing or financing activities : | ||||||
Change in capital expenditures in accounts payable | $ | ( | $ | ( |
The accompanying notes are an integral part of these Condensed Consolidated Interim Financial Statements.
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes—Unaudited
6
GOLD RESOURCE CORPORATION
NOTES TO THE CONDENSED CONSOLIDATED INTERIM FINANCIAL STATEMENTS
March 31, 2023
(Unaudited)
1. Basis of Preparation of Financial Statements
The Condensed Consolidated Interim Financial Statements (“interim financial statements”) of Gold Resource Corporation and its subsidiaries (collectively, the “Company”) are unaudited and have been prepared in accordance with the rules of the Securities and Exchange Commission (“SEC”) for interim statements. Certain information and footnote disclosures required by United States Generally Accepted Accounting Principles (“U.S. GAAP”) have been condensed or omitted as permitted by such rules, although the Company believes that the disclosures included are adequate to make the information presented not misleading. In the opinion of management, all adjustments (including normal recurring adjustments) and disclosures necessary for a fair presentation of these interim financial statements have been included. The results reported in these interim financial statements are not necessarily indicative of the results that may be reported for the entire year. These interim financial statements should be read in conjunction with the audited consolidated financial statements for the year ended December 31, 2022 included in the Company’s annual report on Form 10-K. The year-end balance sheet data was derived from the audited financial statements. Unless otherwise noted, there have been no material changes to the footnotes from those accompanying the audited consolidated financial statements contained in the Company’s annual report on Form 10-K.
Certain items in the prior period’s consolidated financial statements and notes have been reclassified to conform to the current presentation. In the first quarter of 2022, exploration expenses included both the Don David Gold Mine (“DDGM”) exploration expenses and the Back Forty Project expenses. In 2023, these are presented on separate lines in the Consolidated Statements of Operations to align with the current presentation. These reclassifications had no effect on the reported results of operations.
2. Recently Adopted Accounting Standards
Recent accounting pronouncements issued have been evaluated and do not presently impact our financial statements and supplemental data.
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes—Unaudited
7
3. Revenue
The Company derives its revenue from the sale of doré and concentrates. The following table presents the Company’s net sales for each period presented, disaggregated by source:
For the three months ended March 31, | ||||||
| 2023 |
| 2022 | |||
(in thousands) | ||||||
Doré sales, net | ||||||
Gold | $ | | $ | | ||
Silver | | | ||||
Less: Refining charges | ( | ( | ||||
Total doré sales, net | | | ||||
Concentrate sales | ||||||
Gold | | | ||||
Silver | | | ||||
Copper | | | ||||
Lead | | | ||||
Zinc | | | ||||
Less: Treatment and refining charges | ( | ( | ||||
Total concentrate sales, net | | | ||||
Realized gain - embedded derivative, net (1) | | | ||||
Unrealized (loss) gain - embedded derivative, net | ( | | ||||
Total sales, net | $ | | $ | |
(1) | Copper, lead, and zinc are co-products. In the Realized gain - embedded derivative, net, there is $ |
4. Inventories, net
At March 31, 2023 and December 31, 2022, inventories, net, consisted of the following:
| As of |
| As of | |||
March 31, | December 31, | |||||
2023 | 2022 | |||||
(in thousands) | ||||||
Stockpiles - underground mine | $ | | $ | | ||
Concentrates | | | ||||
Doré, net | | | ||||
Subtotal - product inventories | | | ||||
Materials and supplies (1) | | | ||||
Total | $ | | $ | |
(1) | Net of reserve for obsolescence of $ |
5. Income Taxes
The Company recorded an income tax benefit of $
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes—Unaudited
8
Mexico Mining Taxation
Mining entities in Mexico are subject to two mining duties, in addition to the
The Company periodically transfers funds from its Mexican wholly-owned subsidiary to the U.S. in the form of dividends, which are subject to a
As of March 31, 2023, the Company believes that it has
6. Prepaid Expenses and Other Current Assets
At March 31, 2023 and December 31, 2022, prepaid expenses and other current assets consisted of the following:
| As of |
| As of | |||
March 31, | December 31, | |||||
2023 | 2022 | |||||
(in thousands) | ||||||
Advances to suppliers | $ | | $ | | ||
Prepaid insurance | | | ||||
Prepaid income tax | | | ||||
Other current assets | | | ||||
Total | $ | | $ | |
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes—Unaudited
9
7. Property, Plant and Mine Development, net
At March 31, 2023 and December 31, 2022, property, plant and mine development, net consisted of the following:
| As of |
| As of | |||
March 31, | December 31, | |||||
2023 | 2022 | |||||
(in thousands) | ||||||
Asset retirement costs | $ | | $ | | ||
Construction-in-progress | | | ||||
Furniture and office equipment | | | ||||
Land | | | ||||
Mineral interest | | | ||||
Light vehicles and other mobile equipment | | | ||||
Machinery and equipment | | | ||||
Mill facilities and infrastructure | | | ||||
Mine Development | | | ||||
Software and licenses | | | ||||
Subtotal (1) | | | ||||
Accumulated depreciation and amortization | ( | ( | ||||
Total | $ | | $ | |
(1) |
The Company recorded depreciation and amortization expense of $
8. Other Non-current Assets
At March 31, 2023 and December 31, 2022, other non-current assets consisted of the following:
| As of |
| As of | |||
March 31, | December 31, | |||||
2023 | 2022 | |||||
(in thousands) | ||||||
Investment in Maritime | $ | | $ | | ||
Investment in Green Light Metals | | | ||||
Other non-current assets | | | ||||
Total | $ | | $ | |
Investment in Maritime
On September 22, 2022, the Company invested C$
Investment in Green Light Metals
A promissory note was acquired in the Aquila Resources Inc. (“Aquila”) acquisition. In October 2021, Aquila sold its Wisconsin assets to Green Light Metals in return for a C$
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes—Unaudited
10
Light Metals financing was raised at less than C$
Upon maturity on December 28, 2022, the Company received
9. Accrued Expenses and Other Liabilities
At March 31, 2023 and December 31, 2022, accrued expenses and other liabilities consisted of the following:
| As of |
| As of | |||
March 31, | December 31, | |||||
2023 | 2022 | |||||
(in thousands) | ||||||
Accrued royalty payments | $ | | $ | | ||
IVA taxes payable, net | | - | ||||
Share-based compensation liability | | - | ||||
Liability for Aquila drillhole capping (1) | | - | ||||
Employee profit sharing obligation | | | ||||
Other payables | | | ||||
Total accrued expenses and other current liabilities | $ | | $ | | ||
Accrued non-current labor obligation | $ | | $ | | ||
Share-based compensation liability | | | ||||
Other long-term liabilities | | | ||||
Total other non-current liabilities | $ | | $ | |
(1) | This is the current portion of the Company’s reclamation and remediation liabilities. Please see Note 11— Reclamation and Remediation in this Condensed Consolidated Interim Financial Statements and Notes for additional information. |
A value added (“IVA”) tax in Mexico is assessed on the sales of products and purchases of materials and services. Businesses owe IVA taxes as the business sells a product and collects IVA taxes from its customers. Likewise, businesses are generally entitled to recover the taxes they have paid related to purchases of materials and services, either as a refund or credit to IVA tax payable. Amounts recorded as IVA taxes in the consolidated financial statements represent the net estimated IVA tax payable or receivable, since there is a legal right of offset of IVA taxes. As of March 31, 2023, this resulted in a liability balance.
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes—Unaudited
11
10. Gold and Silver Stream Agreements
The following table presents the Company’s liabilities related to the Gold and Silver Stream Agreements as of March 31, 2023 and December 31, 2022:
| As of |
| As of | |||
March 31, | December 31, | |||||
2023 | 2022 | |||||
(in thousands) | ||||||
Liability related to the Gold Stream Agreement | $ | | $ | | ||
Liability related to the Silver Stream Agreement | | | ||||
Total liability | $ | | $ | |
Periodic interest expense will be incurred based on an implied interest rate. The implied interest rate is determined based on the timing and probability of future production and an
Gold Streaming Agreement
In November 2017, Aquila entered into a stream agreement with Osisko Bermuda Limited (“OBL”), a wholly owned subsidiary of Osisko Gold Royalties Ltd (TSX & NYSE: OR), pursuant to which OBL agreed to commit approximately $
The $
Per the terms of the gold stream agreement, OBL will purchase
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes—Unaudited
12
Silver Stream Agreement
Through a series of contracts, Aquila executed a silver stream agreement with OBL to purchase
Per the terms of the silver stream agreement, OBL will purchase
The $
11. Reclamation and Remediation
The following table presents the reclamation and remediation obligations as of March 31, 2023 and December 31, 2022:
| As of | As of | ||||
March 31, | December 31, | |||||
2023 |
| 2022 | ||||
(in thousands) | ||||||
Current reclamation and remediation liabilities (1) | $ | | $ | - | ||
Non-current reclamation and remediation liabilities | | | ||||
Total | $ | | $ | |
(1) | The current portion of reclamation and remediation liabilities are included in Accrued expenses and other current liabilities. Please see Note 9— Accrued Expenses and Other Liabilities in this Condensed Consolidated Interim Financial Statements and Notes for additional information. |
The following table presents the changes in reclamation and remediation obligations for the three months ended March 31, 2023 and the year ended December 31, 2022:
| 2023 |
| 2022 | |||
(in thousands) | ||||||
Reclamation liabilities – balance at beginning of period | $ | | $ | | ||
Foreign currency exchange loss | | | ||||
Reclamation liabilities – balance at end of period | | | ||||
Asset retirement obligation – balance at beginning of period (1) | | | ||||
Changes in estimate (1) | - | | ||||
Liability for Aquila drillhole capping (2) | | - | ||||
Accretion | | | ||||
Foreign currency exchange loss | | | ||||
Asset retirement obligation – balance at end of period | | | ||||
Total period end balance | $ | | $ | |
(1) | In 2022, the Company updated its closure plan study, which resulted in a $ |
(2) | As of December 31, 2022, the Company reported the liability to remediate exploration drill holes at the Back Forty Project in Michigan, USA in other non-current liabilities. As of March 31, 2023, this liability was reclassified to non-current reclamation and remediation liabilities. Upon completion of the optimized feasibility study and the related mine closure plan, an asset for asset retirement obligation and corresponding liability for reclamation and remediation will be recorded. |
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes—Unaudited
13
The Company’s undiscounted reclamation liabilities of $
The Company’s asset retirement obligations reflect the additions to the asset for reclamation and remediation costs in Property, Plant & Mine Development, post 2013 development stage status, which are discounted using a credit adjusted risk-free rate of
12. Commitments and Contingencies
Commitments
As of March 31, 2023 and December 31, 2022, the Company has equipment purchase commitments of approximately $
Contingent Consideration
With the Aquila acquisition, the Company assumed a contingent consideration related to the December 30, 2013, Aquila acquisition of
The contingent consideration is composed of the following in Canadian dollars:
The value of future installments is based on C$
a. | C$ |
b. | C$ |
c. | C$ |
d. | C$ |
The value of the contingent consideration as of March 31, 2023 was $
Other Contingencies
The Company has certain other contingencies resulting from litigation, claims, and other commitments and is subject to a variety of environmental and safety laws and regulations incident to the ordinary course of business. The Company currently has no basis to conclude that any or all of such contingencies will materially affect its financial position, results
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes—Unaudited
14
of operations, or cash flows. However, in the future, there may be changes to these contingencies, or additional contingencies may occur, any of which might result in an accrual or a change in current accruals recorded by the Company, and there can be no assurance that their ultimate disposition will not have a material adverse effect on the Company’s financial position, results of operations or cash flows.
With the acquisition of Aquila Resources Inc. on December 10, 2021, the Company assumed substantial liabilities that relate to the gold and silver stream agreements with Osisko Bermuda Limited. Under the agreements, Osisko deposited a total of $
13. Shareholders’ Equity
No dividends were declared and paid in 2023. During the three months ended March 31, 2022, the Company declared and paid dividends of $
14. Derivatives
Embedded Derivatives
Concentrate Sales
Concentrate sales contracts contain embedded derivatives due to the provisional pricing terms for unsettled shipments. At the end of each reporting period, the Company records an adjustment to accounts receivable and revenue to reflect the mark-to-market adjustments for outstanding provisional invoices based on forward metal prices. Please see Note—20 Fair Value Measurement in this Condensed Consolidated Interim Financial Statements and Notes for additional information on the realized and unrealized gain (loss) recorded to adjust accounts receivable and revenue.
The following table summarizes the Company’s unsettled sales contracts at March 31, 2023 with the quantities of metals under contract subject to final pricing expected to occur through May 2023:
Gold | Silver | Copper | Lead | Zinc | Total | |||||||||||||
| (ounces) |
| (ounces) |
| (tonnes) |
| (tonnes) |
| (tonnes) | |||||||||
Under contract | | |||||||||||||||||
Average forward price (per ounce or tonne) | $ | | $ | $ | $ | $ | ||||||||||||
Unsettled sales contracts value (in thousands) | $ | | $ | | $ | | $ | | $ | | $ | |
Other Derivatives
Zinc zero cost collar
Derivative instruments that are not designated as hedging instruments are required to be recorded on the balance sheet at fair value. Changes in fair value will impact the Company’s earnings through mark-to-market adjustments until the physical commodity is delivered or the financial instrument is settled. The fair value does not reflect the realized or cash value of the instrument. As of December 31, 2022, the Company’s hedge program concluded, but the Company may utilize similar programs in the future to manage near-term exposure to cash flow variability from metal prices.
The Company manages credit risk by selecting counterparties believed to be financially strong, by entering into netting arrangements with counterparties and by requiring other credit risk mitigants, as appropriate. The Company actively evaluates the creditworthiness of its counterparties, assigns appropriate credit limits, and monitors credit exposures against those assigned limits.
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes—Unaudited
15
15. Employee Benefits
Effective October 2012, the Company adopted a profit sharing plan (the “Plan”) which covers all U.S. employees. The Plan meets the requirements of a qualified retirement plan pursuant to the provisions of Section 401(k) of the Internal Revenue Code. The Plan also provides eligible employees the opportunity to make tax deferred contributions to a retirement trust account up to
Under Mexican law, employees are entitled to receive statutory profit sharing (Participacion a los Trabajadores de las Utilidades or “PTU”) payment. The required cash payment to employees in the aggregate is equal to
16. Stock-Based Compensation
The Company’s compensation program comprises three main elements: base salary, an annual short-term incentive plan (“STIP”) cash award, and long-term equity-based incentive compensation (“LTIP”) in the form of deferred stock units (“DSUs”), restricted stock units (“RSUs”), stock options, and performance share units (“PSUs”).
The Gold Resource Corporation 2016 Equity Incentive Plan (the “Incentive Plan”) allows for the issuance of up to
DSUs of
The Company may also issue DSUs for directors in lieu of board fees at their request. During the three months ended March 31, 2023 and 2022, respectively, there were
RSUs of
Stock options of
PSUs of
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes—Unaudited
16
were $
Stock-based compensation expense for the periods presented is as follows:
For the three months ended March 31, | |||||
2023 |
| 2022 | |||
(in thousands) | |||||
Deferred stock units | | | |||
Restricted stock units | | | |||
Stock options | $ | | $ | | |
Performance stock units | ( | - | |||
Total | $ | | $ | |
The Company’s STIP for its management team provides annual cash payable upon achievement of specified performance metrics. As of March 31, 2023, the Company accrued $
17. Zinc Zero Cost Collar
During the three months ended March 31, 2023 and 2022, the realized and unrealized (gains) losses related to the Company’s Zinc Zero Cost Collar are the following:
For the three months ended March 31, | ||||||
| 2023 |
| 2022 | |||
(in thousands) | ||||||
Realized loss on zinc zero cost collar | $ | - | $ | | ||
Unrealized loss on zinc zero cost collar (1) | - | | ||||
Total | $ | - | $ | |
On May 18, 2021, the Company entered into a Trading Agreement with Auramet International LLC that governs nonexchange traded, over-the-counter, spot, forward and option transactions on both a deliverable and non-deliverable basis involving various metals and currencies. Gains and losses due to changes in fair value are non-cash in nature until such time that they are realized through cash transactions. Please see Note 14—Derivatives in this Condensed Consolidated Interim Financial Statements and Notes for additional information. As of December 31, 2022, the Company’s hedge program concluded, but the Company may utilize similar programs in the future to manage near-term exposure to cash flow variability from metal prices.
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes—Unaudited
17
18. Other Expense, net
Other expense, net, for the periods presented consisted of the following:
For the three months ended March 31, | ||||||
| 2023 |
| 2022 | |||
(in thousands) | ||||||
Unrealized currency exchange loss (1) | $ | | $ | | ||
Realized currency exchange loss | | | ||||
Realized and unrealized gain from gold and silver rounds, net | ( | ( | ||||
Interest on streaming liabilities | | | ||||
Severance (2) | | - | ||||
Other (income) expense | ( | | ||||
Total | $ | | $ | |
(1) | Gains and losses due to changes in fair value are non-cash in nature until such time that they are realized through cash transactions. For additional information regarding the Company’s fair value measurements and investments, please see Note 20—Fair Value Measurement in this Condensed Consolidated Interim Financial Statements and Notes for additional information. |
(2) | This is due to an organized reduction of workforce and leadership change at DDGM in Mexico. |
19. Net Income per Common Share
Basic net income per common share is calculated based on the weighted average number of common shares outstanding for the period. Diluted earnings per common share are calculated based on the assumption that stock options and other dilutive securities outstanding, which have an exercise price less than the average market price of the Company’s common shares during the period, would have been exercised on the later of the beginning of the period or the date granted and that the funds obtained from the exercise were used to purchase common shares at the average market price during the period. All the Company’s RSUs are considered to be dilutive in periods with net income.
The effect of the Company’s dilutive securities is calculated using the treasury stock method and only those instruments that result in a reduction in net income per common share are included in the calculation. Options to purchase
Basic and diluted net income per common share is calculated as follows:
For the three months ended | |||||
March 31, | |||||
2023 |
| 2022 | |||
Numerator: | |||||
Net (loss) income (in thousands) | $ | ( | $ | | |
Denominator: | |||||
Basic weighted average shares of common stock outstanding | | | |||
Dilutive effect of share-based awards | - | | |||
Diluted weighted average common shares outstanding | | | |||
Basic and diluted net (loss) income per common share | ( | |
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes—Unaudited
18
20. Fair Value Measurement
Fair value accounting establishes a fair value hierarchy that prioritizes the inputs to valuation techniques used to measure fair value. The hierarchy gives the highest priority to unadjusted quoted prices in active markets for identical assets or liabilities (Level 1 measurements) and the lowest priority to unobservable inputs (Level 3 measurements). The three levels of the fair value hierarchy are described below:
Level 1 | Unadjusted quoted prices in active markets that are accessible at the measurement date for identical, unrestricted assets or liabilities; |
Level 2 | Quoted prices in markets that are not active, or inputs that are observable, either directly or indirectly, for substantially the full term of the asset or liability; and |
Level 3 | Prices or valuation techniques that require inputs that are both significant to the fair value measurement and unobservable (supported by little or no market activity). |
As required by accounting guidance, assets and liabilities are classified in their entirety based on the lowest level of input that is significant to the fair value measurement. These assets and liabilities are remeasured for each reporting period. The following tables set forth certain of the Company’s assets and liabilities measured at fair value by level within the fair value hierarchy as of March 31, 2023 and December 31, 2022:
| As of | As of |
| |||||
March 31, | December 31, | Input Hierarchy Level | ||||||
2023 |
| 2022 | ||||||
(in thousands) | ||||||||
Cash and cash equivalents | $ | | $ | | Level 1 | |||
Accounts receivable, net | $ | | $ | | Level 2 | |||
Investment in equity securities-Maritime | $ | | $ | | Level 1 | |||
Investment in equity securities-Green Light Metals | $ | | $ | | Level 3 |
The following methods and assumptions were used to estimate the fair value of each class of financial instrument:
Cash and cash equivalents: Cash and cash equivalents consist primarily of cash deposits and are valued at cost, which approximates fair value.
Accounts receivable, net: Accounts receivable, net include amounts due to the Company for deliveries of concentrates and doré sold to customers. Concentrate sales contracts provide for provisional pricing as specified in such contracts. These sales contain an embedded derivative related to the provisional pricing mechanism which is bifurcated Gold Resource Corporation 92 and accounted for as a derivative. At the end of each reporting period, the Company records an adjustment to sales to reflect the mark-to-market of outstanding provisional invoices based on the forward price curve. Because these provisionally priced sales have not yet settled as of the reporting date, the mark-to-market adjustment related to these invoices is included in accounts receivable as of each reporting date.
At March 31, 2023 and December 31, 2022, the Company had an unrealized loss of $
Investment in equity securities—Maritime: On September 22, 2022, Gold Resource Corporation invested C$
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes—Unaudited
19
Investment in equity securities—Green Light Metals: Upon maturity on December 28, 2022, the Company received
Gains and losses related to changes in the fair value of these financial instruments were included in the Company’s Condensed Consolidated Interim Statements of Operations as shown in the following table:
For the three months ended March 31, | Statements of Operations Classification | ||||||||
|
| 2023 |
| 2022 |
| ||||
Note | |||||||||
Realized and unrealized derivative (loss) gain, net | 14 | $ | ( | $ | | Sales, net | |||
Realized loss on zinc zero cost collar | 17 | $ | - | $ | ( | Realized and unrealized loss on zinc zero cost collar | |||
Unrealized loss on zinc zero cost collar | 17 | $ | - | $ | ( | Realized and unrealized loss on zinc zero cost collar |
Realized/Unrealized Derivatives
The following tables summarize the Company’s realized/unrealized derivatives for the periods presented (in thousands):
| Gold |
| Silver |
| Copper |
| Lead |
| Zinc |
| Total | |||||||
For the three months ended March 31, 2023 | ||||||||||||||||||
Realized gain | $ | | $ | | $ | | $ | | $ | | $ | | ||||||
Unrealized loss | ( | ( | ( | ( | ( | ( | ||||||||||||
Total realized/unrealized derivatives, net | $ | | $ | ( | $ | | $ | ( | $ | ( | $ | ( |
| Gold |
| Silver |
| Copper |
| Lead |
| Zinc |
| Total | |||||||
For the three months ended March 31, 2022 | ||||||||||||||||||
Realized gain | $ | | $ | | $ | | $ | | $ | | $ | | ||||||
Unrealized gain | | | | | | | ||||||||||||
Total realized/unrealized derivatives, net | $ | | $ | | $ | | $ | | $ | | $ | |
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes—Unaudited
20
21. Supplementary Cash Flow Information
Other operating adjustments and write-downs within the net cash provided by operations on the Condensed Consolidated Statements of Cash Flows for the three months ended March 31, 2023 and 2022 consisted of the following:
| For the three months ended March 31, | |||||
2023 |
| 2022 | ||||
(in thousands) | ||||||
Unrealized (gain) loss on gold and silver rounds | $ | ( | $ | ( | ||
Unrealized foreign currency exchange loss | | | ||||
Unrealized (gain) loss on zinc zero cost collar | - | | ||||
Other | | ( | ||||
Total other operating adjustments | $ | | $ | |
22. Segment Reporting
As of March 31, 2023, the Company has organized its operations into
The following table shows selected information from the Consolidated Balance Sheets relating to the Company’s segments (in thousands):
| Oaxaca, |
| Michigan, |
| Corporate |
| Consolidated | |||||
As of March 31, 2023 | ||||||||||||
Total current assets | $ | | $ | | $ | | $ | | ||||
Total non-current assets | | | | | ||||||||
Total assets | $ | | $ | | $ | | $ | | ||||
Total current liabilities | $ | | | | $ | | ||||||
Total non-current liabilities | | | | | ||||||||
Total shareholders' equity | | | | | ||||||||
Total liabilities and shareholders' equity | $ | | $ | | $ | | $ | | ||||
As of December 31, 2022 | ||||||||||||
Total current assets | $ | | $ | | $ | | $ | | ||||
Total non-current assets | | | | | ||||||||
Total assets | $ | | $ | | $ | | $ | | ||||
Total current liabilities | $ | | $ | | $ | | $ | | ||||
Total non-current liabilities | | | | | ||||||||
Total shareholders' equity | | | | | ||||||||
Total liabilities and shareholders' equity | $ | | $ | | $ | | $ | |
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes—Unaudited
21
The following table shows selected information from the Consolidated Statements of Operations relating to the Company’s segments (in thousands):
| Oaxaca, |
| Michigan, |
| Corporate |
| Consolidated | |||||
For the three months ended March 31, 2023 | ||||||||||||
Sales, net | $ | | $ | - | $ | - | $ | | ||||
Total mine cost of sales, including depreciation | | | | | ||||||||
Exploration expense | | | - | | ||||||||
Total other costs and expenses, including G&A | | | | | ||||||||
Provision for income taxes | | ( | | ( | ||||||||
Net income (loss) | $ | | $ | ( | $ | ( | $ | ( | ||||
For the three months ended March 31, 2022 | ||||||||||||
Sales, net | $ | | $ | - | $ | - | $ | | ||||
Total mine cost of sales, including depreciation | | - | - | | ||||||||
Exploration expense | | | - | | ||||||||
Total other costs and expenses, including G&A | | | | | ||||||||
Provision for income taxes | | - | - | | ||||||||
Net income (loss) | $ | | $ | ( | $ | ( | $ | | ||||
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes—Unaudited
22
ITEM 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations
The following discussion summarizes the results of operations of Gold Resource Corporation and its subsidiaries (“we”, “our”, or “us”) for the three months ended March 31, 2023 and compares those results with the three months ended March 31, 2022. It also analyzes the Company’s financial condition as of March 31, 2023 and compares it to the financial condition as of December 31, 2022. This discussion should be read in conjunction with management’s discussion and analysis and the audited consolidated financial statements and footnotes for the year ended December 31, 2022 contained in our annual report on Form 10-K.
The discussion also presents certain non-GAAP financial measures that are important to management in its evaluation of our operating results, and which are used by management to compare our performance with what we perceive to be peer group mining companies and are relied on as part of management’s decision-making process. Management believes these measures may also be important to investors in evaluating our performance. For a detailed description of each of the non-GAAP financial measures and a reconciliation to GAAP financial measures, please see the discussion under “Non-GAAP Measures”.
See Forward-Looking Statements at the end of this Item 2 for important information regarding statements contained herein.
Overview
Gold Resource Corporation is a mining company that pursues gold and silver projects that are expected to achieve both low operating costs and high returns on capital. The Don David Gold Mine is our cornerstone asset comprised of six properties. The Company’s focus is to unlock the significant upside potential of this asset through optimization of the current operations, growing the existing resource, and identifying new opportunities near existing infrastructure. The primary mineral production is coming from the Arista underground mine. This mine supplies ore to our processing facilities to produce gold and silver doré and copper, lead, and zinc concentrates which also contain gold and silver.
The Back Forty Project, when developed, is expected to produce gold and silver doré and copper and zinc concentrates bearing gold and silver. We have formed an integrated project team to optimize the feasibility study, related mine plan, and to ensure a positive long-term impact on the environment and host communities. The feasibility study work related to metallurgy and the economic models progressed during the first quarter of 2023. Once the feasibility study work is completed, the Company’s Board of Directors will evaluate the current economic climate and make a decision on how to proceed the Back Forty Mine.
Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations
23
Field safety inspection underground | Under the direction of a new Mexican leadership team, several improvements have been implemented. For example, new mining techniques are being deployed, which optimize drilling accuracy, ensure well controlled blasting, and increase ground stability. Ground stability has further been improved by utilizing galvanized steel split sets. Maintenance improvements have been made to the roads, and the underground maintenance shop was moved from level eleven to level 18. While deploying new and safer techniques is a lengthy process, we are committed to ensuring constant supervision until these protocols are embedded in our practices. Our operations are also focused on developing a mature safety culture. We have bolstered our training department by bringing in external experts in underground mining activities. We have executed on leading indicators and raised awareness on hazard recognition. These efforts are aimed at increasing safety awareness and preventing accidents. We initiated internal and external safety audits which have identified several areas of opportunity. Our multidisciplined safety committee is focused on monitoring action plans. A recent accomplishment is that the Company increased training and awareness of potentially risky situations and is now reporting leading indicators, such as near misses. This is a significant milestone that shows we are moving in the right direction in terms of improving our safety culture. Finally, at Gold Resource Corporation, we hold ourselves accountable to the highest environmental, social, and governance standards. Our commitment to acting responsibly and delivering excellence in sustainability allows us to deliver benefits to all our stakeholders, including our employees and local communities. The new Mexico leadership team is already realizing improvements to maximize efficiencies and safety protocols. |
Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations
24
Results of Operations
Don David Gold Mine
Mine activities during the first quarter of 2023 included development and ore extraction from the Arista mine.
The following table summarizes certain production statistics about our Don David Gold Mine for the periods indicated:
For the three months ended March 31, | ||||||
| 2023 |
| 2022 | |||
Arista Mine | ||||||
Milled | ||||||
Tonnes Milled | 116,721 | 135,801 | ||||
Grade | ||||||
Average Gold Grade (g/t) | 2.33 | 3.00 | ||||
Average Silver Grade (g/t) | 94 | 81 | ||||
Average Copper Grade (%) | 0.37 | 0.41 | ||||
Average Lead Grade (%) | 1.73 | 1.97 | ||||
Average Zinc Grade (%) | 3.88 | 4.89 | ||||
Combined | ||||||
Tonnes Milled (1) | 117,781 | 136,844 | ||||
Tonnes Milled per Day (2) | 1,420 | 1,590 | ||||
Metal production (3) | ||||||
Gold (ozs.) | 7,171 | 11,187 | ||||
Silver (ozs.) | 322,676 | 332,292 | ||||
Copper (tonnes) | 336 | 431 | ||||
Lead (tonnes) | 1,559 | 2,073 | ||||
Zinc (tonnes) | 3,837 | 5,562 | ||||
Metal produced and sold (3) | ||||||
Gold (ozs.) | 6,508 | 8,381 | ||||
Silver (ozs.) | 294,815 | 265,407 | ||||
Copper (tonnes) | 332 | 408 | ||||
Lead (tonnes) | 1,417 | 1,639 | ||||
Zinc (tonnes) | 3,060 | 4,359 | ||||
Percentage payable metal (3) | ||||||
Gold (%) | 91 | 75 | ||||
Silver (%) | 91 | 80 | ||||
Copper (%) | 99 | 95 | ||||
Lead (%) | 91 | 79 | ||||
Zinc (%) | 80 | 78 |
(1) | During the three months period ended March 31, 2023 and 2022, tonnes milled includes 1,060 and 1,043 purchased tonnes, respectively, related to a collaborative initiative with a local community to ensure the proper environmental treatment and storage of the material. |
(2) | Based on actual days the mill operated during the period. |
(3) | The difference between what we report as "ounces/tonnes produced" and "payable ounces/tonnes sold" is attributable to the difference between the quantities of metals contained in the concentrates we produce versus the portion of those metals actually paid for according to the terms of our sales contracts. Differences can also arise from inventory changes incidental to shipping schedules, or variances in ore grades and recoveries, which impact the amount of metals contained in concentrates produced and sold. |
Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations
25
First quarter 2023 compared to first quarter 2022
For the three months ended March 31, 2023, the Don David Gold Mine production totaled 7,171 gold ounces and 322,676 silver ounces, representing a 36% decrease in gold production and a 3% decrease in silver production, from the same period in 2022. The unfavorable variance for gold is directly related to the 14% lower volume of ore tonnes and the 22% lower gold grades processed as expected and in line with the current 2023 mine plan.
Production Volumes
During the three months ended March 31, 2023, total tonnes milled of 117,781 were 14% lower than the same period in 2022. Metal production for gold, copper, lead, and zinc decreased during the three months ended March 31, 2023 as compared to the same period last year. Metal production in the three months ended March 31, 2023, was lower than metal production in the same period in 2022 due to the lower volume of tonnes milled and lower metal grades as expected and in line with the current 2023 mine plan.
Grades & Recoveries
During the three months ended March 31, 2023, the majority of ore processed came from the Arista underground mine with an average gold grade of 2.33 g/t and silver grade of 94 g/t, compared to 3.00 g/t and 81 g/t, respectively, for the same period in 2022. The average gold grade was 22% lower and silver grade 16% higher. As shown in the Technical Report Summary incorporated by reference in the Form 10-K for 2022, grades are expected to decline in 2023 in line with the life of mine average shown in the Mineral Reserve and Mineral Resource tables. As grades decline, recoveries are expected to decline as well.
Our base metals average grades during the three months ended March 31, 2023 were 0.37% copper, 1.73% lead, and 3.88% zinc. Copper, lead, and zinc grades were 8%, 12%, and 21% lower, respectively, than in the same period in 2022.
Gold and silver recoveries for the three months ended March 31, 2023 were 80.9% and 91.2%, respectively, reflecting a 3.4% decrease for gold and a 2.2% decrease for silver over the same period in 2022. We have encountered different mineralization, containing not only high grade metals, but a portion of the production areas are in zones of high quartz mineralization. Quartz has an adverse effect on the floatation while encapsulating some of the gold. Copper, lead, and zinc recoveries for the three months ended March 31, 2023 were 77.1%, 77.0%, and 84.7%, respectively. The recoveries for copper, lead, and zinc for the three months ended March 31, 2023 were in line with the same period in 2022. As shown in the Technical Report Summary incorporated by reference in the Form 10-K for 2022, future recoveries and grades are expected to be in line with the life of mine average shown in the Mineral Reserve and Mineral Resource tables.
Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations
26
Sales Statistics
The following table summarizes certain sales statistics about the Don David Gold Mine operations for the periods indicated:
For the three months ended March 31, | ||||||
| 2023 |
| 2022 | |||
Net sales | ||||||
Gold | $ | 12,347 | $ | 15,785 | ||
Silver | 6,642 | 6,105 | ||||
Copper | 2,994 | 4,097 | ||||
Lead | 2,965 | 3,827 | ||||
Zinc | 9,551 | 16,317 | ||||
Less: Treatment and refining charges | (3,184) | (2,748) | ||||
Realized and unrealized (loss) gain - embedded derivative, net | (87) | 2,034 | ||||
Total sales, net | $ | 31,228 | $ | 45,417 | ||
Metal produced and sold | ||||||
Gold (ozs.) | 6,508 | 8,381 | ||||
Silver (ozs.) | 294,815 | 265,407 | ||||
Copper (tonnes) | 332 | 408 | ||||
Lead (tonnes) | 1,417 | 1,639 | ||||
Zinc (tonnes) | 3,060 | 4,359 | ||||
Average metal prices realized (1) | ||||||
Gold ($ per oz.) | $ | 1,915 | $ | 1,898 | ||
Silver ($ per oz.) | $ | 23.04 | $ | 23.94 | ||
Copper ($ per tonne) | $ | 9,172 | $ | 10,144 | ||
Lead ($ per tonne) | $ | 2,158 | $ | 2,347 | ||
Zinc ($ per tonne) | $ | 3,195 | $ | 3,842 | ||
Gold equivalent ounces sold | ||||||
Gold Ounces | 6,508 | 8,381 | ||||
Gold Equivalent Ounces from Silver | 3,547 | 3,348 | ||||
Total AuEq oz | 10,055 | 11,729 |
(1) | Average metal prices realized vary from the market metal prices due to final settlement adjustments from our provisional invoices when they are settled. Our average metal prices realized will therefore differ from the average market metal prices in most cases. |
First quarter 2023 compared to first quarter 2022
Metal Sold
During the three months ended March 31, 2023, gold sales of 6,508 ounces, copper sales of 332 tonnes, lead sales of 1,417 tonnes, and zinc sales of 3,060 tonnes decreased by 22%, 19%, 14%, and 30%, respectively, as compared to the same period in 2022. Silver sales of 294,815 ounces increased by 11% during the three months ended March 31, 2023 compared to the same period in 2022.
Average metal prices realized
During the three months ended March 31, 2023, the average metal prices were $1,915 per ounce for gold, $23.04 per ounce for silver, $9,172 per tonne for copper, $2,158 per tonne for lead, and $3,195 per tonne for zinc. Compared to the same period in 2022, the average metal price for gold increased by 1%, while the average metal price for silver, copper, lead, and zinc decreased by 4%, 10%, 8%, and 17%, respectively.
Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations
27
Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations
28
Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations
29
Financial Measures
The following table summarizes certain financial data of the Company for the periods indicated:
For the three months ended March 31, | ||||||
2023 |
| 2022 | ||||
(in thousands) | ||||||
Doré and concentrate sales | $ | 34,499 | $ | 46,131 | ||
Less: Treatment and refining charges | (3,184) | (2,748) | ||||
Realized/unrealized derivatives, net | (87) | 2,034 | ||||
Sales, net | 31,228 | 45,417 | ||||
Total cost of sales | 27,299 | 26,094 | ||||
Mine gross profit | 3,929 | 19,323 | ||||
Other costs and expenses, including tax: | 4,964 | 15,304 | ||||
Net (loss) income | $ | (1,035) | $ | 4,019 | ||
Other Non-GAAP Financial Measures: | ||||||
Total cash cost after co-product credits per AuEq oz sold (1) | $ | 711 | $ | (163) | ||
Total consolidated all-in sustaining cost after co-product credits per AuEq oz sold (1) | $ | 1,221 | $ | 462 | ||
Total all-in cost after co-product credits per AuEq oz sold (1) | $ | 1,404 | $ | 774 |
(1) | For a detailed description of each of the non-GAAP financial measures and a reconciliation to GAAP financial measures, please see the discussion below under “Non-GAAP Measures”. |
First quarter 2023 compared to first quarter 2022
Sales, net
DDGM net sales of $31.2 million for the three months ended March 31, 2023 decreased by $14.2 million, or 31%, when compared to 2022. The decrease in 2023 sales is the result of decreased sales volumes and lower realized metal prices outlined in the sales statistics table above. Additionally, treatment and refining charges during the three months ended March 31, 2023 increased by 16% as a result of an increase in the zinc treatment charge benchmark and spot price.
Total cost of sales
Total cost of sales increased to $27.3 million for the three months ended March 31, 2023 from $26.1 million for the same period in 2022. The $1.2 million increase was primarily related to a $1.3 million increase in depreciation expense. Depreciation expense was higher in 2023 as a result of the completion of the gold regrind and dry stack tailings projects, which were transferred out of construction-in-progress to mill facilities and infrastructure and started to depreciate at the end of the first quarter of 2022. Additionally, the mineral reserve base in 2023 is lower for the units of production calculation, resulting in higher depreciation cost per tonne of ore processed. Production costs of $19.9 million for the three months ended March 31, 2023 are 1% lower than the production costs of $20.1 million for the same period in 2022. The decrease is directly related to a 14% decrease in ore tonnes processed, offset by a higher cost per tonne processed mainly due to due to increases related to the commissioning of the filtration plant and dry stack facility during the first quarter of 2022 and ground support improvements made in the first quarter of 2023.
Mine gross (loss) profit
For the three months ended March 31, 2023, mine gross profit decreased $15.4 million or 80%, compared to the same period in 2022. The decrease was primarily due to a 31%, or $14.2 million decrease in net sales and a 22%, or $1.3 million increase in depreciation and amortization expenses.
The relationship between sales and the cost of sales, and therefore mine gross profit, is not perfectly correlated to the tonnes of ore processed. While both sales and the cost of sales are impacted by the tonnes of ore processed, other factors,
Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations
30
such as the grade of ore processed, metal commodity prices, and operating costs have a significant impact on mine gross profit. For example, in the first quarter of 2023, the volume of ore processed decreased 14% and total cost of sales increased by 5% compared to the first quarter of 2022 due to a 15% higher cost per tonne processed; however, sales decreased by 31% due to a decrease in ore tonnes processed and a decrease in grade of ore tonnes processed. The decrease in sales is explained by the decrease in volumes and grades during the first quarter of 2023, and the increase in operating costs is primarily explained by the increase in depreciation and increase in unit operating costs discussed above.
We expect grades to vary from period to period based on the annual mine plan. The gold and silver grades are expected to trend downwards over time toward the average grade of 1.14 g/t and 97 g/t, respectively (and exclusive of copper, lead, and zinc contained grades), reflected in our mineral reserve estimate. However, as capital intensive mine development progresses and infill drilling occurs, opportunities to refine mining methods and eliminate dilution may have a favorable impact on future mined grades.
Net (loss) income
For the three months ended March 31, 2023, we recorded net loss of $1.0 million, as compared to net income of $4.0 million during the same period in 2022. The $5.0 million decrease in net income is mainly attributable to the lower mine gross profit discussed above.
Other Costs and Expenses, Including Taxes
For the three months ended March 31, | |||||||
2023 |
| 2022 |
| ||||
(in thousands) | |||||||
Other costs and expenses: | |||||||
General and administrative expenses | $ | 1,193 | $ | 1,899 | |||
Mexico exploration expenses | 1,389 | 1,237 | |||||
Michigan Back Forty Project expenses | 450 | 1,068 | |||||
Stock-based compensation | 597 | 774 | |||||
Realized and unrealized loss on zinc zero cost collar | - | 4,137 | |||||
Other expense, net | 1,469 | 838 | |||||
Total other costs and expenses | 5,098 | 9,953 | |||||
(Benefit) provision for income taxes | (134) | 5,351 | |||||
Total other costs, including taxes | $ | 4,964 | $ | 15,304 |
General and administrative expenses – For the three months ended March 31, 2023 and 2022, general and administrative expenses were $1.2 million and $1.9 million, respectively, representing a 37% decrease from the same period of 2022 primarily due to the impact of increased audit fees and consulting services in the first quarter of 2022, related to finalizing the Aquila acquisition and the allocation of $0.6 million corporate personnel costs from general and administrative expenses to production costs for the Mexican operations.
DDGM Exploration expenses – For the three months ended March 31, 2023, exploration expenses in DDGM totaled $1.4 million, compared to $1.2 million for the same period in 2022. Exploration activities in Oaxaca, Mexico increased compared to the same period in 2022 primarily due to increased drilling activity in 2023.
Back Forty Project expenses – For the three months ended March 31, 2023, feasibility study and permitting costs, totaled $0.5 million, compared to $1.1 million for the same period in 2022. The 58% decrease is due to nearing completion of the feasibility study and utilizing third parties only on a limited basis until after the completion of the capital cost analysis for the project.
Stock-based compensation – Stock-based compensation decreased by $0.2 million for the three months ended March 31, 2023 compared to the same period in 2022. This decrease is mainly due to the downward mark-to-market adjustment in the liability classified equity awarded, due to a decrease in share price.
Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations
31
Realized and unrealized loss on zinc zero cost collar – As of December 31, 2022, the Company’s hedge program concluded, therefore no gains or losses were recorded in 2023. For March 31, 2022, $4.1 million of loss was recorded related to the zinc zero cost collar. Of this loss, $2.5 million was unrealized and relates to zero cost collars that would mature April through December 2022.
Other expense, net – For the three months ended March 31, 2023, $1.5 million of other expense was recorded compared to $0.8 million other expense during the same period of 2022. The $0.7 million increase primarily is the result of the $0.6 million severance expense due to the reduction of workforce and change in the leadership team at DDGM in Mexico. Please see Note 18 - Other expense, net in this Condensed Consolidated Interim Financial Statements and Notes for a detailed breakdown.
Provision for income taxes – For the three months ended March 31, 2023, income tax benefit was $0.1 million, compared to $5.4 million income tax expense for the same period in 2022. The decrease in income tax expense for the three months ended March 31, 2023 is driven by the decrease in the three-month net income before income taxes.
Other Non-GAAP Financial Measures
Total cash cost after co-product credits per AuEq oz sold – For the three months ended March 31, 2023, the total cash cost after co-product credits per AuEq oz sold is $711 compared to $(163) for the same period in 2022. The increase is due to the lower amount of co-product credits we received during the first quarter of 2023, the 14% decrease in total number of AuEq ounces sold, and the 16% increase in treatment and refining charges as a result of an increase in the zinc treatment charge benchmark and spot price.
(1) | Percentage Payable Metals reflects the metals actually paid for according to the terms of our sales contracts. Differences between the first quarter of 2022 and the first quarter of 2023 primarily relate to the timing of final settlements and the processing of zinc tailings through the regrind circuit. |
Total consolidated all-in sustaining cost after co-product credits per AuEq oz sold – For the three months ended March 31, 2023, the total consolidated all-in sustaining cost after co-product credits per AuEq oz sold was $1,221 compared to $462 for the same period in 2022. The increase is directly related to the higher cash costs per ounce discussed above partially offset by lower sustaining capital expenditures.
Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations
32
Total all-in cost after co-product credits per AuEq oz sold – For the three months ended March 31, 2023, the total all-in cost after co-product credits per AuEq oz sold was $1,404 compared to $774 for the same period in 2022. The increase is due to the higher all-in sustaining costs discussed above partially offset by lower Back Forty costs due to nearing completion of the feasibility study and utilizing third parties only on a limited basis until after completion of capital cost analysis for the project.
For a detailed description of each of the non-GAAP financial measures and a reconciliation to GAAP financial measures, please see the discussion below under “Non-GAAP Measures.”
2023 Capital and Exploration Investment Summary
For the three months ended March 31, 2023 | 2023 full year guidance | ||||||
(in thousands) | |||||||
Sustaining Investments: | |||||||
Underground Development | Capital | $ | 1,296 | ||||
Infill Drilling | Capitalized Exploration | 817 | |||||
Other Sustaining Capital | Capital | 475 | |||||
Surface and Underground Exploration Development & Other | Capitalized Exploration | 548 | |||||
Subtotal of Sustaining Investments: | 3,136 | $ | 9 - 11 million | ||||
Growth Investments: | |||||||
DDGM growth: | |||||||
Surface Exploration / Other | Exploration | 766 | |||||
Underground Exploration Drilling | Exploration | 477 | |||||
Underground Exploration Development | Exploration | 146 | |||||
Back Forty growth: | |||||||
Back Forty Feasibility Study & Permits | Exploration | 450 | |||||
Subtotal of Growth Investments: | 1,839 | $ | 6 - 7 million | ||||
Total Capital and Exploration: | $ | 4,975 | $ | 15 - 18 million |
The Company’s investment in Mexico in the first quarter of 2023 totaled $4.5 million in the first quarter of 2023. Our investment in Mexico is focused on favorably impacting our environment, social, and governance programs while creating operational efficiencies and sustainability. At the Back Forty Project, $0.5 million has been invested in feasibility and permitting initiatives year-to-date.
Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations
33
Underground and Exploration Development:
Mine development during the quarter included ramps and access to different areas of the deposit, ventilation shafts, and exploration development drifts. A total of 230 meters of development (included in Infill Drilling and Exploration Development in the table above), at a cost of $0.7 million was completed during the first quarter of 2023. As part of ongoing safety initiatives, the Company also invested in additional ground support and improved ventilation for the mine. We plan to invest a total of $1.5 million in over 700 meters of exploration development in 2023.
Underground safety inspection and ventilation survey |
Back Forty Feasibility and Permitting:
Work on the optimized feasibility study progressed during the first quarter of 2023. Mine planning, process plant design and site layout and infrastructure were largely completed during 2022. Current initiatives are focused on finalizing the financial models with operating and capital costs, which may be subject to some volatility due to the inflationary market conditions. Environmental and cultural resource considerations have been a key factor in the overall project design. Work related to metallurgy and the economic model will continue and once completed, the Company’s Board of Directors will evaluate the current economic climate and make a decision on how to proceed with the Back Forty Mine.
2023 DDGM Exploration Updates
Our portfolio of properties that make up our Don David Gold Mine are located along a 55 kilometer trend of the San Jose structural corridor in the Sierra Madre Sur mountain range. This structural corridor trends north 70 degrees west and
Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations
34
spans three historic mining districts within Oaxaca. Surface exploration activity continues on several properties with a goal of defining additional priority drill targets, demonstrating our commitment to a long-term investment in Oaxaca, Mexico.
Underground exploration drilling is ongoing, where access is available, from various locations within the Arista mine: (1) to continue testing of the Three Sisters Zone, as well as other new vein targets, such as the Gloria zone and (2) to further define and expand the Mineral Reserves and Mineral Resources of the current vein systems in production.
During the quarter, we completed 4 exploration drill holes (2,526 meters) and 26 infill drill holes (4,926 meters).
● | Exploration drilling in the first quarter of 2023 continued testing the northwest extension of the Switchback system at depth and along strike where we have confirmed the continuation of the system. During the first quarter of 2023, drilling also continued exploration of the Three Sisters system as well as in the newly discovered Gloria vein structure, located immediately west of Three Sisters. The Switchback system extends for over a kilometer along a NW-SE strike and remains open in both directions as well as up- and down-dip. The Three Sisters and Gloria vein systems also remain open at depth and along strike. Exploration drilling in 2023 will continue to focus on these structures as well as the down-dip extensions of the Soledad South vein (Switchback). |
● | Infill drilling in the first quarter of 2023 continued to focus on both the Arista and Switchback vein systems, defining mineralization along strike and down-dip of existing workings. Infill drilling continues to confirm zones of high-grade mineralization within the resource model as well as additional mineralized structures outside existing models, including, the Marena zone (Arista), and the Soledad South and Susana North veins (Switchback). |
Gloria vein zone (714.84 - 732.36 m), from Switchback / Three Sisters drilling 2023 Q1 |
Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations
35
Surface exploration programs continued during Q1in the Alta Gracia mining district, focusing on soil sampling with follow-up rock chip sampling and geologic mapping in the El Aguacatillo zone. Below is a map of the El Aguacatillo zone soil sampling to date (Alta Gracia project).
El Aguacatillo 2023 Q1 soil sampling program (Alta Gracia project), showing gold in soil results (ppm)
Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations
36
Non-GAAP Measures
Throughout this report, we have provided information prepared or calculated according to U.S. GAAP and have referenced certain non-GAAP performance measures which we believe will assist with understanding the performance of our business. These measures are based on precious metal gold equivalent ounces sold and include cash cost before co-product credits per ounce, total cash cost after co-product credits per ounce, and total all-in sustaining cost per ounce (“AISC”). Because the non-GAAP performance measures do not have any standardized meaning prescribed by U.S. GAAP, they may not be comparable to similar measures presented by other companies. Accordingly, these measures should not be considered in isolation, or as a substitute for, measures of performance prepared in accordance with U.S. GAAP. These non-GAAP measures are not necessarily indicative of operating profit or cash flow from operations as determined under GAAP.
For financial reporting purposes, we report the sale of base metals as part of our revenue. Revenue generated from the sale of base metals in our concentrates is considered a co-product of our gold and silver production for the purpose of calculating our total cash cost after co-product credits for our Don David Gold Mine. We periodically review our revenues to ensure that our reporting of primary products and co-products is appropriate. Because we consider copper, lead, and zinc to be co-products of our precious metal production, the value of these metals continues to be applied as a reduction to total cash costs in our calculation of total cash cost after co-product credits per precious metal gold equivalent ounce sold. Likewise, we believe the identification of copper, lead, and zinc as co-product credits is appropriate due to their lower per unit economic value contribution compared to the precious metals and since gold and silver are the primary products we intend to produce.
Total cash cost, after co-product credits, is a measure developed by the Gold Institute to provide a uniform standard for industry comparison purposes. AISC is calculated based on the current guidance from the World Gold Council.
Total cash cost before co-product credits includes all direct and indirect production costs related to our production of metals (including mining, milling and other plant facility costs, smelter treatment and refining charges, royalties, and site general and administrative costs) less stock-based compensation allocated to production costs plus treatment and refining costs.
Total cash cost after co-product credits includes total cash cost before co-product credits less co-product credits, or revenues earned from base metals.
AISC includes total cash cost after co-product credits plus other costs related to sustaining production, including allocated sustaining general and administrative expenses, and sustaining capital expenditures. We determined sustaining capital expenditures as those capital expenditures that are necessary to maintain current production and execute the current mine plan.
Cash cost before co-product credits per ounce, total cash cost after co-product credits per ounce, and AISC are calculated by dividing the relevant costs, as determined using the cost elements noted above, by precious metal gold AuEq sold for the periods presented.
Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations
37
Reconciliations to U.S. GAAP
The following table summarizes the Company’s total all-in cost after co-product credits per precious metal gold equivalent ounce sold:
For the three months ended March 31, | |||||
2023 |
| 2022 | |||
Gold equivalent ounces sold (oz) |
| 10,055 | 11,729 | ||
Total production costs (1) | $ | 19,850 | $ | 20,074 | |
Treatment and refining charges (2) | 3,184 | 2,748 | |||
Co-product credits (2) | (15,881) | (24,732) | |||
Total cash cost after co-product credits | 7,153 | (1,910) | |||
Total cash cost after co-product credits per AuEq oz sold | $ | 711 | $ | (163) | |
Sustaining - capitalized expenditure (3) | 2,588 | 4,596 | |||
Sustaining - Exploration Expenditure (3) | 548 | - | |||
Reclamation and remediation | 195 | 62 | |||
Subtotal of DDGM sustaining costs | 3,331 | 4,658 | |||
DDGM all-in sustaining cost after co-product credits per AuEq oz sold | $ | 1,043 | $ | 234 | |
Sustaining - general and administrative, including stock-based compensation expenses | 1,790 | 2,673 | |||
Consolidated all-in sustaining cost after co-product credits | 12,274 | 5,421 | |||
Total consolidated all-in sustaining cost after co-product credits per AuEq oz sold | $ | 1,221 | $ | 462 | |
Non-sustaining cost- capital expenditure (3) | - | 1,353 | |||
Non-sustaining cost- exploration expenditure (1) | 1,839 | 2,305 | |||
Subtotal of non-sustaining costs | 1,839 | 3,658 | |||
Total all-in cost after co-product credits | 14,113 | 9,079 | |||
Total all-in cost after co-product credits per AuEq oz sold | $ | 1,404 | $ | 774 |
(1) | Refer to Item 1. Financial Statements: Condensed Consolidated Interim Statements of Operations |
(2) | Refer to Item 1. Financial Statements: Note 3 - Revenue. The prior year (2022) Co-product credits were adjusted to include realized embedded derivatives. |
(3) | Sum of, refer to Item 1. Financial Statements: Condensed Consolidated Interim Statements of Cash Flows |
Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations
38
Trending Highlights
2022 | 2023 | |||||
Q1 | Q2 | Q3 | Q4 | Q1 | ||
Operating Data | ||||||
Total tonnes milled | 136,844 | 129,099 | 110,682 | 116,616 | 117,781 | |
Average Grade | ||||||
Gold (g/t) | 3.00 | 2.63 | 1.98 | 2.51 | 2.33 | |
Silver (g/t) | 81 | 64 | 80 | 109 | 94 | |
Copper (%) | 0.41 | 0.32 | 0.37 | 0.45 | 0.37 | |
Lead (%) | 1.97 | 1.99 | 1.59 | 1.58 | 1.73 | |
Zinc (%) | 4.89 | 4.00 | 4.21 | 4.27 | 3.88 | |
Metal production (before payable metal deductions) | ||||||
Gold (ozs.) | 11,187 | 9,317 | 5,851 | 7,767 | 7,171 | |
Silver (ozs.) | 332,292 | 249,088 | 261,256 | 370,768 | 322,676 | |
Copper (tonnes) | 431 | 303 | 296 | 406 | 336 | |
Lead (tonnes) | 2,073 | 2,020 | 1,249 | 1,323 | 1,559 | |
Zinc (tonnes) | 5,562 | 4,282 | 3,901 | 4,198 | 3,837 | |
Metal produced and sold | ||||||
Gold (ozs.) | 8,381 | 8,746 | 5,478 | 7,514 | 6,508 | |
Silver (ozs.) | 265,407 | 231,622 | 225,012 | 335,168 | 294,815 | |
Copper (tonnes) | 408 | 286 | 282 | 372 | 332 | |
Lead (tonnes) | 1,639 | 1,755 | 1,056 | 941 | 1,417 | |
Zinc (tonnes) | 4,359 | 3,590 | 2,943 | 3,265 | 3,060 | |
Average metal prices realized | ||||||
Gold ($ per oz.) | $ 1,898 | $ 1,874 | $ 1,627 | $ 1,734 | $ 1,915 | |
Silver ($ per oz.) | $ 23.94 | $ 22.05 | $ 18.54 | $ 21.25 | $ 23.04 | |
Copper ($ per tonne) | $ 10,144 | $ 9,275 | $ 7,115 | $ 8,221 | $ 9,172 | |
Lead ($ per tonne) | $ 2,347 | $ 2,168 | $ 1,882 | $ 1,954 | $ 2,158 | |
Zinc ($ per tonne) | $ 3,842 | $ 4,338 | $ 3,186 | $ 2,577 | $ 3,195 | |
Gold equivalent ounces sold | ||||||
Gold Ounces | 8,381 | 8,746 | 5,478 | 7,514 | 6,508 | |
Gold Equivalent Ounces from Silver | 3,348 | 2,729 | 2,564 | 4,107 | 3,547 | |
Total AuEq oz | 11,729 | 11,475 | 8,042 | 11,621 | 10,055 | |
Financial Data ($'s in thousands except for per ounce) | ||||||
Total sales, net | $ 45,417 | $ 37,064 | $ 23,869 | $ 32,374 | $ 31,228 | |
Earnings from mining operations before depreciation and amortization | $ 25,281 | $ 15,281 | $ 4,431 | $ 11,981 | $ 11,183 | |
Total cash cost after co-product credits per AuEq oz sold | ($ 163) | $ 247 | $ 1,103 | $ 842 | $ 711 | |
Total consolidated all-in sustaining cost after co-product credits per AuEq oz sold | $ 462 | $ 799 | $ 1,831 | $ 1,226 | $ 1,221 | |
Production Costs | $ 20,074 | $ 21,722 | $ 19,380 | $ 19,773 | $ 19,850 | |
Production Costs/Tonnes Milled | $ 147 | $ 168 | $ 175 | $ 170 | $ 169 | |
Earnings before interest, taxes, depreciation, depletion, and amortization | $ 15,328 | $ 13,716 | ($ 3,338) | $ 3,758 | $ 6,085 | |
Operating Cash Flows | $ 4,230 | $ 7,976 | ($ 4,292) | $ 6,243 | $ 1,024 | |
Net income (loss) | $ 4,019 | $ 2,673 | ($ 9,730) | ($ 3,283) | ($ 1,035) | |
Earnings (loss) per share - basic | $ 0.05 | $ 0.03 | ($ 0.11) | ($ 0.04) | ($ 0.01) |
Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations
39
Liquidity and Capital Resources
As of March 31, 2023, working capital of $24.1 million, consists of current assets of $40.7 million and current liabilities of $16.6 million. This represents a 13% or $2.7 million increase from the working capital balance of $21.4 million as of December 31, 2022. The primary factors influencing the increase in our working capital was a payment of the liability related to the mining royalty tax, as well as the cash provided by operating activities of $1.0 million, offset by $3.1 million of cash used in investing activities as reported in the Condensed Consolidated Interim Statements of Cash Flows. Our working capital balance fluctuates as we use cash to fund our operations, financing and investing activities, including exploration, mine development, and income taxes. We believe that as a result of our cash balances, the performance of our current and expected operations, and the current metals prices, we will be able to meet our obligations and other potential cash requirements for at least the next 12 months from the date of this report.
Long-term liabilities assumed with the Aquila acquisition, capital requirements to develop the Back Forty Project, and potential project financing may have an impact on liquidity in the long term. These long-term liabilities are contingent upon the approval of the Back Forty Project by the Company’s Board of Directors and securing project financing. Project financing is not expected to be required any earlier than 2024 or 2025.
Cash and cash equivalents as of March 31, 2023 decreased to $21.4 million from $23.7 million as of December 31, 2022, a net decrease in cash of $2.3 million. The decrease is primarily due to cash spent on capital and exploration expenditures at DDGM and at the Back Forty Project, and mining royalty tax payments for the 2022 tax years, offset by cash inflow from operations.
Of the $21.4 million cash balance as of March 31, 2023, $17.0 million was held in foreign subsidiaries, primarily held in U.S. dollar denominated accounts with the remainder in foreign currencies readily convertible to U.S. dollars. The Don David Gold Mine’s primary source of liquidity is the sale of doré and concentrates. The Don David Gold Mine has been self-sustaining since production commencement in 2010 and has been a source of cash for U.S. operations and projects.
Net cash provided by operating activities for the three months ended March 31, 2023 was $1.0 million compared to $4.2 million for the same period in 2022. Investing activities are mainly attributable to continued reinvestment in DDGM.
Net cash used in investing activities of $3.1 million for the three months ended March 31, 2023 decreased from $5.4 million from the same period in 2022. The decrease is mainly attributed to the 2022 investment in work to complete the commissioning of the filtration plant, the dry stack facility, and the gold regrind circuit.
Net cash used in financing activities for three months ended March 31, 2023 was a net outflow of $16 thousand compared to a net outflow of $1.1 million for same period in 2022. The change is primarily related to the discontinuation of shareholder dividends.
While current macro risk factors, such as economic uncertainties and supply chain interruptions have not had a significant adverse impact on exploration plans, results of operations, financial position, and cash flows during the current fiscal year, future impacts are unknown at this time. However, we believe there is sufficient liquidity and capital resources to fund operations and corporate activities for the foreseeable future.
In May 2020, we filed a universal shelf registration statement with the SEC on Form S-3 for the proposed offering from time to time of up to $200,000,000 of our securities, including common stock, preferred stock, and/or warrants (the “Shelf Registration Statement”). We also entered into an At the Market Offering Agreement with H.C. Wainwright & Co., LLC pursuant to which we may sell shares of our common stock under the Shelf Registration Statement at market prices from time to time. However, pursuant to General Instruction I.A.3 of Form S-3, we are not eligible to use the Shelf Registration Statement until the 2022 Form 10-K is filed in 2023 due to the late filing of a Form 8-K including the historical financial statements related to our acquisition of Aquila Resources. Based on our current cash balances and the anticipated performance of our current and expected operations, we do not currently expect that the unavailability of our Shelf Registration Statement or our inability to utilize the ATM Agreement will have a material impact on our liquidity.
Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations
40
Accounting Developments
For a discussion of Recently Adopted and Recently Issued Accounting Pronouncements, please see Note - 2 Recently Adopted Accounting Standards in this Condensed Consolidated Interim Financial Statements and Notes.
Forward-Looking Statements
This report contains “forward-looking statements” within the meaning of Section 27A of the Securities Act of 1933 and Section 21E of the Securities Exchange Act of 1934. We use the words “anticipate,” “continue,” “likely,” “estimate,” “expect,” “may,” “could,” “will,” “project,” “should,” “believe” and similar expressions (including negative and grammatical variations) to identify forward looking statements. Such forward-looking statements include, without limitation, statements regarding:
● | Our strategy for significant future investment in Oaxaca, Mexico and in Michigan, USA for development and exploration activities; |
● | The expected timing for the Back Forty feasibility study, permitting, detailed engineering, and project financing; |
● | Our expectations regarding future grades from mining at DDGM; |
● | Expectations regarding 2023 capital investment, exploration spending, and general and administrative costs; |
● | Future exploration plans at DDGM; |
● | Compliance with existing legal and regulatory requirements, including future asset reclamation costs; |
● | Estimates of Mineral Resources (“Mineral Resources”) and Mineral Reserves (“Mineral Reserves”); |
● | Our expectations regarding whether dividends will be paid in the future; and |
● | Our ability to satisfy our obligations and other potential cash requirements over the next twelve months. |
Forward-looking statements are neither historical facts nor assurances of future performance. Rather, they are based only on our current beliefs, expectations, and assumptions regarding the future of our business, future plans and strategies, projections, anticipated events and trends, the economy, and other future conditions. Because forward-looking statements relate to the future, they are subject to inherent uncertainties, risks, and changes in circumstances that are difficult to predict, and many of which are outside of our control. Our actual results and financial condition may differ materially from those indicated in the forward-looking statements. Therefore, you should not rely on any of these forward-looking statements. Important factors that could cause our actual results and financial condition to differ materially from those indicated in the forward-looking statements include, among others, the following:
● | Commodity price fluctuations; |
● | Mine protests and work stoppages; |
● | Rock formations, faults and fractures, water flow and possible CO2 gas exhalation, or other unanticipated geological challenges; |
● | Unexpected changes in business and economic conditions, including supply chain challenges, the rate of inflation, and their impact on operating and capital costs; |
● | Changes in interest rates and currency exchange rates; |
Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations
41
● | Adverse technological changes and cybersecurity threats; |
● | Unanticipated increases in our operating costs and other costs of doing business; |
● | Access to land and availability of materials, equipment, supplies, labor and supervision, power, and water; |
● | Results of current and future feasibility studies; |
● | Interpretation of drill hole results and the geology, grade, and continuity of mineralization; |
● | Litigation by private parties or regulatory action by governmental entities; |
● | Acts of God, such as floods, earthquakes, and any other natural disasters; |
● | The inherent uncertainty of Mineral Resource and Mineral Reserve estimates; and |
● | Such other factors are discussed below under “Risk Factors”. |
Many of these factors are beyond our ability to control or predict. Although we believe that the expectations reflected in our forward-looking statements are based on reasonable assumptions, such expectations may prove to be materially incorrect due to known and unknown risks and uncertainties. You should not unduly rely on any of our forward-looking statements. These statements speak only as of the date of this quarterly report on Form 10-Q. Except as required by law, we are not obligated to publicly release any revisions to these forward-looking statements to reflect future events or developments. All subsequent written and oral forward-looking statements attributable to us and persons acting on our behalf are qualified in their entirety by the cautionary statements contained in this section and elsewhere in this Form 10-Q.
Gold Resource Corporation—Management’s Discussion and Analysis of Financial Condition and Results of Operations
42
ITEM 3: Quantitative and Qualitative Disclosures about Market Risk
Our exposure to market risks includes, but is not limited to, the following risks: changes in commodity prices, foreign currency exchange rates, provisional sales contract risks, changes in interest rates, and equity price risks. We do not use derivative financial instruments as part of an overall strategy to manage market risk; however, we may consider such arrangements in the future as we evaluate our business and financial strategy.
Commodity Price Risk
The results of our operations, cash flows, and financial condition depend in large part upon the market prices of gold, silver, copper, lead, and zinc. Metal prices fluctuate widely and are affected by numerous factors beyond our control. The level of interest rates, the rate of inflation, government fiscal and monetary policy, the stability of exchange rates, the world supply of and demand for gold, silver, and other metals, among other factors, can all cause significant fluctuations in commodity prices. Such external economic factors are in turn influenced by changes in international investment patterns, monetary systems, and political developments. The metal price markets have fluctuated widely in recent years, and future price declines could cause a mineral project to become uneconomic, thereby having a material adverse effect on our business and financial condition. We entered into a zinc zero cost collar to protect the selling price for zinc but have not entered into derivative contracts to protect the selling price for gold, silver, copper or lead. We may in the future more actively manage our exposure through additional derivative contracts, although we have no intention of doing so in the near-term.
Effective May 18, 2021, the Company entered into a Trading Agreement with Auramet International LLC that govern non-exchange traded, over-the-counter, spot, forward, and option transactions on both a deliverable and non-deliverable basis involving various metals and currencies. Subsequently the Company entered into zinc zero cost collars. These derivatives are not designated as hedges. The zero cost collars were used to manage the Company’s near-term exposure to cash flow variability from zinc price risks. As of December 31, 2022, the Company’s hedge program concluded, but the Company may utilize similar programs in the future to manage near-term exposure to cash flow variability from metal prices. We do not currently use financial instruments with respect to any of the other base metal production either.
In addition to materially adversely affecting our reserve estimates, results of operations and/or our financial condition, declining gold and silver prices could require a reassessment of the feasibility of a project. Even if a project is ultimately determined to be economically viable, the need to conduct such a reassessment may cause delays in the implementation of a project.
Foreign Currency Risk
Our foreign operation sells its gold, silver, copper, lead, and zinc production based on U.S. dollar metal prices. Fluctuations in foreign currency exchange rates do not have a material impact on our revenue since gold, silver, copper, lead, and zinc are sold throughout the world in U.S. dollars.
Foreign currency exchange rate fluctuations can increase or decrease our costs to the extent we pay costs in currencies other than the U.S. Dollar. We are primarily impacted by Mexican peso rate changes relative to the U.S. Dollar, as we incur some costs in the Mexican peso. When the value of the peso rises in relation to the U.S. Dollar, some of our costs in Mexico may increase, thus materially adversely affecting our operating results. Alternatively, when the value of the peso drops in relation to the U.S. Dollar, peso-denominated costs in Mexico will decrease in U.S. Dollar terms. Future fluctuations may give rise to foreign currency exposure, which may affect our financial results. Approximately 50% to 60% of expenses are paid in currencies other than the U.S. dollar.
We have not utilized market-risk sensitive instruments to manage our exposure to foreign currency exchange rates but may in the future actively manage our exposure to foreign currency exchange rate risk.
Gold Resource Corporation
43
Provisional Sales Contract Risk
We enter into concentrate sales contracts which, in general, provide for a provisional payment to us based upon provisional assays and prices. The provisionally priced sales contracts contain an embedded derivative that is required to be separated from the host contract for accounting purposes. The host contract is the receivable from the sale of concentrates determined at the quoted metal prices at the time of shipment delivery to the customer. The embedded derivative, which does not qualify for hedge accounting, is adjusted to market through revenue each period prior to settlement. Changes in the prices of metals between the shipment delivery and final settlement date will result in adjustments to revenues related to the sales of concentrate previously recorded upon shipment delivery. Please see Note 14—Derivatives in this Condensed Consolidated Interim Financial Statements and Notes for additional information.
Interest Rate Risk
We consider our interest rate risk exposure to be insignificant at this time, as our interest rate is related and embedded in immaterial payments for office leases.
Equity Price Risk
We have in the past, and may in the future, seek to acquire additional funding through sale of common stock and other equity. The price of our common stock has been volatile in the past and may also be volatile in the future. As a result, there is a risk that we may not be able to sell our common stock at an acceptable price should the need for new equity funding arise.
ITEM 4: Controls and Procedures
Evaluation of Disclosure Controls and Procedures
During the fiscal period covered by this report, our management, with the participation of our Chief Executive Officer and Chief Financial Officer, carried out an evaluation of the effectiveness of the design and operation of our disclosure controls and procedures (as defined in Rules 13a-15(e) and 15d-15(e) of the Securities Exchange Act of 1934, as amended). Based on such evaluation, our Chief Executive Officer and Chief Financial Officer have concluded that, as of the end of the period covered by this report, our disclosure controls and procedures were effective to ensure that information required to be disclosed by us in reports that we file or submit under the Exchange Act are recorded, processed, summarized and reported within the required time periods and are designed to ensure that information required to be disclosed in our reports is accumulated and communicated to our management, including our Chief Executive Officer and Chief Financial Officer as appropriate, to allow timely decisions regarding required disclosure.
Changes in Internal Control Over Financial Reporting
There were no changes that occurred during the three months ended March 31, 2023, other than those enhancements to documentation discussed above, that have materially affected, or are reasonably likely to materially affect, our internal control over financial reporting.
PART II – OTHER INFORMATION
ITEM 1: Legal Proceedings
We know of no material, existing or pending legal proceedings against us, nor are we involved as a plaintiff in any material proceeding or pending litigation.
In February 2020, a local Ejido community (who claim to be an indigenous community) filed an injunction against the Mexican federal government through which they demanded the cancellation of several concession titles. The federal government ordered a suspension to prevent work related to excavating, drilling, opening tunnels and exploiting the mineral resources on the surface and subsoil of the concessions named in the injunction. Presently, the Don David Gold Mine does
Gold Resource Corporation
44
not perform such works in the named concessions in lands of the indigenous community. The lawsuit filed in February 2020 has not progressed to a final ruling.
ITEM 1A: Risk Factors
“Item 1A. Risk Factors” of our Form 10-K for the year ended December 31, 2022 includes a discussion of our known material risk factors, other than risks that could apply to any issuer or offering. There have been no material changes from the risk factors described in our Form 10-K.
ITEM 2: Unregistered Sales of Equity Securities and Use of Proceeds
None
ITEM 3: Defaults upon Senior Securities
None
ITEM 4: Mine Safety Disclosures
While the Company owns an advanced exploration project in Michigan, USA, the project is not yet subject to the Mine Safety and Health Administration (“MSHA”) jurisdiction and therefore, the mine safety disclosure requirements are not applicable.
ITEM 5: Other Information
None
ITEM 6: Exhibits
The following exhibits are filed or furnished herewith or incorporated herein by reference:
Exhibit | Descriptions | |
31.1 | Certification pursuant to Section 302 of the Sarbanes-Oxley Act of 2002 for Allen Palmiere. | |
31.2 | Certification pursuant to Section 302 of the Sarbanes-Oxley Act of 2002 for Kimberly C. Perry. | |
32* | ||
101 | Financial statements from the Quarterly Report on Form 10-Q of Gold Resource Corporation as of or for the three months ended March 31, 2023, formatted in inline XBRL: (i) the Condensed Consolidated Interim Balance Sheets, (ii) the Condensed Consolidated Interim Statements of Operations, (iii) the Condensed Consolidated Interim Statements of Changes in Shareholders’ Equity, (iv) the Condensed Consolidated Interim Statements of Cash Flows, and (v) the Notes to the Condensed Consolidated Interim Financial Statements. | |
104 | Cover Page Interactive Data File (embedded within the XBRL document) |
* | This document is not being “filed” for purposes of Section 18 of the Securities Exchange Act of 1934, as amended, or otherwise subject to the liabilities of that Section. Registration Statements or other documents filed with the SEC shall not incorporate this exhibit by reference, except as otherwise expressly stated in such filing. |
Gold Resource Corporation
45
SIGNATURES
In accordance with Section 13 or 15(d) of the Exchange Act of 1934, the Company has caused this Report to be signed on its behalf by the undersigned, thereunto duly authorized.
GOLD RESOURCE CORPORATION | |||
Dated: April 25, 2023 | /s/ Allen Palmiere | ||
By: | Allen Palmiere, | ||
Chief Executive Officer, | |||
Dated: April 25, 2023 | /s/ Kimberly C. Perry | ||
By: | Kimberly C. Perry, | ||
Chief Financial Officer |